Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Special event planned between Exit 3 and Exit 13 for 10.2 km (West Vancouver). Starting Sat Sep 6 at 5:30 AM PDT until Sat Sep 6 at 10:00 AM PDT. Road closure planned. Expect delays. RBC Granfondo cycling event. Detour using Marine Drive to Capilano Road. Next update time Sat Sep 6 at 10:00 AM PDT. Last updated Tue Sep 2 at 1:37 PM PDT. (DBC-81112) |
Highway 1 |
Highway 1 (TransCanada Highway). Paving operations between Cassiar Tunnel and Exit 29: Willingdon Ave for 3.8 km (Vancouver to Burnaby). Until Mon Sep 15. From 7:00 PM to 7:00 AM PDT on weekends, Monday, Tuesday, Wednesday and Thursday. Traffic down to 1 lane each way. Westbound paving 7PM- 5AM. Eastbound paving 7PM-7AM. Follow construction signage and watch for crews. Next update time Mon Sep 15 at 7:00 AM PDT. Last updated Sun Aug 10 at 6:35 AM PDT. (DBC-79054) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Paving operations at Exit 33: Kensington Ave (Burnaby). Until Tue Sep 9. Exit ramp is closed. One northbound lane on Kensington Avenue will be closed. Next update time Mon Sep 8 at 4:00 PM PDT. Last updated Wed Aug 20 at 4:55 PM PDT. (DBC-77926) |
Highway 1 |
Highway 1 (TransCanada Highway). Construction work between 248 St and Bradner Rd for 5.7 km (Langley - District). Until Tue Sep 30. From 8:30 PM to 8:00 AM PDT on weekends and from 8:30 PM to 5:00 AM PDT on weekdays. Lane closures in both directions in effect. Full highway closures from 11:00PM to 4:30AM as needed. Traffic diverted to Exit 73 on and off-ramps at those times. Next update time Tue Sep 30. Last updated Mon Jul 28 at 2:30 PM PDT. (DBC-79804) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Construction work at Exit 73 (Langley - District). Until Wed Dec 31 at 7:00 PM PDT. Exit ramp is closed. Current westbound offramp loop is closed. A new offramp will open before the overpass. Exit the highway and turn left or right onto 264th Street. Next update time Wed Dec 31 at 7:00 AM PDT. Last updated Sat Aug 2 at 11:01 PM PDT. (DBC-76914) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between Gladwin Rd and Nicomen River Rd for 1.1 km (10 to 11 km east of Lytton). Single lane alternating traffic. Work will take place from 6:00am-4:30pm PT daily. Expect up to 40 minute delays due to railway crossing / construction activities. Next update time Mon Sep 15 at 10:00 AM PDT. Last updated Tue Aug 19 at 12:24 AM PDT. (DBC-75637) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Coburn St and Shuswap Ave for 0.7 km (Chase). From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. 60km/h work zone. 80km/h outside construction hours. Watch for traffic control. Next update time Sat Sep 20 at 5:00 PM PDT. Last updated Sat Aug 16 at 12:40 PM PDT. (DBC-64961) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Ford Rd and Bolton Rd for 4.5 km (Tappen). Until Wed Dec 31. From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Expect up to 20 min delays. Reduced speed through work zone to 60 km/hr. Intermittent minor stoppages. Watch for traffic control. Next update time Mon Dec 1 at 9:00 AM PDT. Last updated Wed Aug 6 at 9:48 AM PDT. (DBC-72306) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Tappen Beach Rd and 65 Ave NW for 2.6 km (Salmon Arm to 2 km east of Tappen). Until Mon Sep 15. From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. 20 minute closure at 7:00pm at Kault Hill for blasting. Next update time Mon Sep 15 at 9:00 AM PDT. Last updated Sun Jul 20 at 6:37 AM PDT. (DBC-72305) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Old Sicamous Rd and Solsqua-Sicamous Rd for 2.0 km (Sicamous). From 8:00 PM to 6:00 AM PDT on weekdays and Saturday. Single lane alternating traffic. No single lane alternating traffic Fri Aug 29 - Mon Sept 1, inclusive.
Single lane alternating traffic to resume 8PM on Tuesday, Sept 2. Next update time Wed Sep 3 at 12:00 PM PDT. Last updated Wed Aug 27 at 7:40 AM PDT. (DBC-70490) |
Highway 1 |
Highway 1 (TransCanada Highway). Construction work between Illecillewaet Brake Check and MacDonald Snowshed for 3.0 km (5 to 2 km west of West Boundary of Glacier National Park). Expect 30-min closures 7pm-8am Mon-Sun morning. 2-hr closures 3:30am - 5:30am Tues-Sat mornings, and 12:30am-2:30am Sunday mornings. Intermittent stoppages may occur. Next update time Sun Sep 14 at 12:00 PM PDT. Last updated Fri Aug 29 at 2:26 PM PDT. (DBC-73974) |
Highway 12 Both Directions |
Highway 12, in both directions. Construction work planned between 30 Mile Rd and Munson Rd (13 km south of Lillooet). Starting Mon Sep 8 until Sat Oct 4. From 8:00 AM to 12:00 PM PDT and from 1:00 PM to 5:00 PM PDT on weekdays and Saturday. Road closure planned. Watch for traffic control personnel. Big Slide Rockfall protection systems repair. Highway open 12PM-1PM to let vehicles through. Next update time Sat Oct 4 at 5:00 PM PDT. Last updated Sun Aug 31 at 2:26 PM PDT. (DBC-81064) |
Highway 13 Both Directions |
Highway 13, in both directions. Construction work between 28 Ave and 30A Ave for 0.5 km (Langley - District). Until Tue Sep 30. From 8:00 PM to 5:00 AM PDT and from 7:00 AM to 7:00 PM PDT on weekdays. Watch for traffic control. Singe lane alternating traffic during nighttime hours. Watch for crews during the day. Next update time Tue Sep 30. Last updated Mon Jul 28 at 9:19 AM PDT. (DBC-79798) |
Highway 13 Southbound |
Highway 13, southbound. Special event planned between 36 Ave and 29 Ave for 1.3 km (Langley - District). Starting Sat Sep 6 at 5:00 AM PDT until Sat Sep 6 at 6:00 PM PDT. Annual Langley Cruise In event. Fraser Hwy closed at 264th St. Watch for traffic control and detour signage. Next update time Sat Sep 6 at 6:00 PM PDT. Last updated Mon Aug 25 at 10:59 AM PDT. (DBC-80847) |
Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Construction work between 1st St and 3rd Ave E for 0.2 km (Prince Rupert). Until Sun Nov 30 at 5:30 PM PDT. Road closed. Detour in effect. Detour via: 3rd Ave E to 1st Ave E, 1st Ave W to 2nd St. Next update time Sun Nov 30 at 5:30 PM PDT. Last updated Tue May 27 at 4:01 PM PDT. (DBC-77182) |
Highway 17 Eastbound |
Highway 17, eastbound. Construction work between Tannery Rd and Bridgeview Dr for 2.0 km (Surrey). Until Wed Sep 3. From 9:00 PM to 5:00 AM PDT on weekends, Monday, Tuesday and Friday. Road closed. Closure between Tannery Rd and 124 St. No eastbound closure night of Sept 3rd or 4th. Detour via Tannery Rd to Scott Rd to Bridgeview Dr. Next update time Wed Sep 3 at 5:00 AM PDT. Last updated Tue Sep 2 at 12:09 AM PDT. (DBC-81000) |
Highway 17 Westbound |
Highway 17, westbound. Construction work between Bridgeview Dr and Tannery Rd for 3.3 km (Surrey). Until Sun Sep 7. From 9:00 PM to 5:00 AM PDT on weekends, Wednesday and Friday. Road closed. No westbound closure night of Sept 4th. Detour via Bridgeview Dr to Scott Rd to Tannery Rd. Next update time Sun Sep 7 at 5:00 AM PDT. Last updated Thu Aug 28 at 6:14 PM PDT. (DBC-81001) |
Highway 17 Both Directions |
Highway 17, in both directions. Construction work between Tannery Rd and Bridgeview Dr for 3.3 km (Surrey). Until Wed Sep 3 at 5:00 AM PDT. Left lane is closed. Watch for traffic control. Detour in effect. A full eastbound closure will take place from 9:00pm-5:00am. Next update time Wed Sep 3 at 5:00 AM PDT. Last updated Tue Sep 2 at 6:26 PM PDT. (DBC-81137) |
Highway 9 Both Directions |
Highway 9, in both directions. Paving operations between Gray Rd and Tuyttens Rd for 6.1 km (Kent). Until Sat Sep 6 at 7:00 AM PDT. From 6:00 PM to 7:00 AM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays. Next update time Tue Sep 9 at 7:00 AM PDT. Last updated Sun Aug 24 at 4:33 PM PDT. (DBC-80828) |
Highway 91 Southbound |
Highway 91, southbound. Bridge maintenance between Exit 1 and the end of Highway 91 (Delta). Until Fri Sep 5. From 10:30 PM to 5:00 AM PDT on Sunday, Monday, Tuesday, Wednesday and Thursday. Entrance ramp closed. Watch for traffic control. Mud Bay interchange, ramp from Hwy 91 SB to Hwy 99 SB will be closed. Detour in place to Ladner Trunk Rd/ Hwy 99 @ Hwy 10 (Mathews Interchange). Next update time Fri Sep 5 at 9:00 PM PDT. Last updated Thu Aug 21 at 12:50 PM PDT. (DBC-80698) |
Highway 99 |
Highway 99. Special event planned between Marine Dr and Highway 1 in West Vancouver. Starting Sat Sep 6 at 5:30 AM PDT until Sat Sep 6 at 10:00 AM PDT. Road closure planned. Expect delays. RBC Granfondo cycling event. Next update time Sat Sep 6 at 8:30 AM PDT. Last updated Tue Sep 2 at 1:37 PM PDT. (DBC-81111) |
Highway 99 Southbound |
Highway 99, southbound. Bridge maintenance at Exit 16 (Delta). Until Fri Sep 12 at 5:00 AM PDT. From 10:00 PM to 5:00 AM PDT on Sunday, Monday, Tuesday, Wednesday and Thursday. Exit ramp is closed. Detour in effect. Watch for traffic control. Exit ramp closed for Highway 91 northbound. Detour in place at Exit 10. Next update time Fri Sep 12 at 5:00 AM PDT. Last updated Wed Sep 3 at 12:58 AM PDT. (DBC-81018) |
Highway 99 Northbound |
Highway 99, northbound. Special event planned between Lost Lagoon Rd and Lions Gate Bridge for 2.5 km (West Vancouver to Vancouver). Starting Sat Sep 6 at 5:30 AM PDT until Sat Sep 6 at 8:00 AM PDT. Bridge will be closed. Expect delays. RBC Granfondo cycling event. Southbound lane open. Next update time Sat Sep 6 at 8:00 AM PDT. Last updated Tue Sep 2 at 1:37 PM PDT. (DBC-81109) |
Other Roads |
Kersley-Dale Landing Rd. Landslide at 500 metres in from Highway 97 Intersection. Road closed. A temporary Single Lane Gravel Road for Local Traffic via Arnoldus Road. Next update time Tue Apr 14, 2026 at 9:00 AM PDT. Last updated Mon Apr 14 at 9:09 AM PDT. (DBC-23443) |
Other Roads Both Directions |
Durrell Road, in both directions. Landslide at 700m from Highway 97. Road closed. Detour in effect. Use Highway 97 and Dale Lake Road. Next update time Wed Oct 22 at 2:00 PM PDT. Last updated Sat Aug 2 at 11:04 PM PDT. (DBC-27390) |
Other Roads Both Directions |
Quesnel-Hixon Road, in both directions. Landslide at Cottonwood bridge. Road closed. Next update time Fri Apr 17, 2026 at 2:00 PM PDT. Last updated Thu Apr 17 at 3:40 PM PDT. (DBC-28386) |
Other Roads |
Johnston Bridge. Travel advisory in effect at Front St. In Quesnel. Johnston Bridge. Bridge is open to vehicles with gross vehicle weight rating of 10,000 kilograms or lower. Industrial traffic and heavy commercial traffic must detour via Plywood Rd and Maple Drive. Industrial traffic is not allowed to detour through Johnston Subdivision. Next update time Wed Apr 8, 2026 at 9:00 AM PDT. Last updated Thu Oct 17 at 6:39 AM PDT. (DBC-47311) |
Other Roads Both Directions |
McKay Road, in both directions. Flooding at McKay Road. Road closed. Next update time Thu Apr 9, 2026 at 9:00 AM PDT. Last updated Thu Apr 10 at 9:28 AM PDT. (DBC-53013) |
Other Roads Both Directions |
Cave Road, in both directions. Landslide at Cave Road. Road closed. Landslide on Cave Road. Next update time Wed Apr 8, 2026 at 10:00 AM PDT. Last updated Wed Apr 9 at 10:42 PM PDT. (DBC-67913) |
Other Roads Both Directions |
Blackburn Road, in both directions. Washout between Sunrise Place and Fulford-Ganges Road near Salt Spring Island. Road closed. Detour in effect. Detour via Cranberry Road. Next update time Wed Sep 2, 2026 at 12:00 PM PDT. Last updated Tue Sep 2 at 4:21 PM PDT. (DBC-77329) |
Other Roads Northbound |
Tamany Dr, northbound. Construction work at Keating Cross Rd in Saanich. Until Fri Oct 31. Road closed. Watch for traffic control. Tamany Rd will be closed at Keating Cross Rd as part of the Highway 17 Keating Cross Flyover Project. Next update time Thu Oct 30 at 9:00 AM PDT. Last updated Fri Jul 25 at 9:25 PM PDT. (DBC-79749) |
Other Roads Both Directions |
Bamfield Rd, in both directions. There is a wildfire between Bamfield and Port Alberni. Road closed. Essential travel only toward Bamfield. Refer to Alberni-Clayoquot Regional District and https://news.Gov.Bc.Ca/releases/2025TT0087-000789 for more information. Next update time Fri Sep 5 at 12:00 PM PDT. Last updated Fri Aug 29 at 12:19 PM PDT. (DBC-80346) |
Other Roads Both Directions |
Renfrew Rd, in both directions. Road maintenance work between Timber Ridge Rd and W Shawnigan Lake Rd. Until Mon Dec 1. From 7:00 AM to 5:00 PM PDT on weekdays. Culvert work will be taking place in Shawnigan Lake. Watch for crews and equipment on the side of the road. Next update time Fri Nov 28 at 9:00 AM PDT. Last updated Tue Aug 26 at 3:23 PM PDT. (DBC-80899) |
Other Roads |
Sylvester Road. Paving operations between Dale Road and Durieu Road. Until Mon Sep 15 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Detour via Farms Road and Durieu Road. Next update time Mon Sep 15 at 7:00 PM PDT. Last updated Fri Aug 29 at 4:32 PM PDT. (DBC-81036) |
Barnston Island Ferry Both Directions |
Barnston Island Ferry, in both directions. Possible ferry delays at Barnston Island Ferry (Surrey). Until Fri Sep 5 at 12:00 PM PDT. Ferry may carry reduced loads during periods of low water. Max 13,000kg or up to 4 cars. Last updated Fri Aug 29 at 8:07 AM PDT. (DBC-80223) |
Barnston Island Ferry Both Directions |
Barnston Island Ferry, in both directions. Travel advisory in effect between Barnston Island Ferry and the end of Barnston Island Ferry (1 km east of Surrey). Until Fri Sep 12 at 4:00 PM PDT. Required maintenance. Due to replacement vessel with reduced capacity. The replacement barge will have a reduced vehicle weight carrying capacity of 28,000kgs. Last updated Tue Aug 26 at 9:54 AM PDT. (DBC-80867) |
Cecil Lake Rd Both Directions |
Cecil Lake Rd (Highway 103), in both directions. Maintenance between 263 Rd and 251 Rd for 0.6 km (16 km west of Cecil Lake). Until Mon Sep 15 at 5:00 PM MST. From 7:00 AM to 5:00 PM MST on weekdays and Saturday. Single lane alternating traffic. Please slow down when passing crews, equipment and going through construction zone. Last updated Wed Aug 27 at 7:46 AM MST. (DBC-79739) |
Highway 1 |
Highway 1. Utility work between Sackum and Venables Valley road. Until Tue Sep 30. From 7:00 AM to 6:00 PM PDT on weekdays. Single lane alternating traffic. Please watch for traffic control personnel and crews working. Expect minor delays of up to five minutes. Last updated Mon Aug 11 at 10:07 AM PDT. (DBC-80309) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work between Roderick St and Culduthel Rd for 0.6 km (Saanich). Until Tue Sep 30 at 5:00 AM PDT. Right lane closed. Left lane is closed. Expect minor delays. Watch for traffic control. Last updated Wed Feb 19 at 11:59 AM PDT. (DBC-72994) |
Highway 1 |
Highway 1 (TransCanada Highway). Road construction work between Carey Rd and Galloping Goose Trail (Saanich). Watch for traffic control. Traffic pattern change and night closures on Carey. Plan your route accordingly and expect traffic delays. Construction zone in effect 24/7. Last updated Fri Aug 1 at 1:49 PM PDT. (DBC-79782) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Tillicum Rd and Exit 6: McKenzie Ave for 1.1 km (Saanich). Until Wed Dec 24, 2025. From 8:00 PM to 5:30 AM PST on weekdays and Sunday. Lane closures in both directions in effect. Traffic reduced to single lane both directions. Maximum width 4m. No maximum height change. Speed limit 50km/h. Last updated Fri Dec 20 at 9:03 AM PST. (DBC-71006) |
Highway 1 |
Highway 1 (TransCanada Highway). Road construction work between Exit 6: McKenzie Ave and Exit 10: Burnside Rd W for 3.8 km (View Royal to Saanich). Construction work at Colwood Interchange, Helmcken Interchange, and McKenzie Interchange until Fall 2027. Expect speed changes, traffic pattern changes, and overnight work. Next update time Tue Sep 16 at 10:00 AM PDT. Last updated Mon Jun 16 at 10:07 AM PDT. (DBC-73856) |
Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Construction work between Crace St and Nicol St for 0.1 km (Nanaimo). Until Tue Sep 30 at 3:00 PM PDT. Right lane closed. Expect minor delays. Watch for traffic control. Last updated Mon Jun 30 at 8:19 AM PDT. (DBC-77623) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Mowing between Exit 7: Westridge Ave and Exit 8: Cypress Bowl Rd for 1.0 km (West Vancouver). Until Wed Sep 3 at 5:00 AM PDT. Left lane is closed. Watch for traffic control. Last updated Wed Sep 3 at 12:25 AM PDT. (DBC-81143) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Electrical maintenance between Exit 14: Capilano Rd and Exit 13 for 1.5 km (North Vancouver - District to West Vancouver). Until Fri Sep 12. From 9:00 PM to 6:00 AM PDT daily. Right turn lane closed. Right lane closed. Last updated Thu Aug 28 at 6:08 PM PDT. (DBC-81002) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Exit 19: Lynn Valley Rd and Exit 21: Mountain Hwy for 0.5 km (North Vancouver - City). Until Wed Nov 5. From 7:00 AM to 8:00 PM PDT daily. Work on shoulders. Watch for traffic control. Last updated Wed Aug 6 at 2:53 PM PDT. (DBC-80161) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Maintenance between Douglas Rd and Exit 29: Willingdon Ave (Burnaby). Until Wed Sep 3 at 5:00 AM PDT. Right lane closed. Watch for traffic control. Guard rail repair work. Last updated Wed Sep 3 at 12:35 AM PDT. (DBC-81144) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work between 216th St and Exit 66: 232nd St for 3.8 km (Langley - District). Until Tue Sep 30. Watch for traffic control. Watch for intermittent lane closures. Last updated Wed Jun 4 at 2:35 PM PDT. (DBC-77541) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Construction work between Bradner Rd and 248 St for 5.3 km (Abbotsford to Langley - District). Until Tue Mar 31, 2026. Watch for traffic control. Traffic pattern change. Watch for signage. Last updated Wed Aug 20 at 3:22 PM PDT. (DBC-80694) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work at Exit 73 (Langley - District). Until Wed Dec 31. Exit ramp is closed. Current off-ramp will be closed, new off-ramp will be opened before the overpass. Turn left or right to 56th south from off-ramp. Last updated Thu Jun 19 at 8:12 PM PDT. (DBC-78296) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Rest area closed at Bradner Rd (Abbotsford). Construction work. For more information on the closure, please refer to Highway 1 Project page: gov.Bc.Ca/264toHighway11#bradner. Next update time Tue Sep 30 at 12:00 PM PDT. Last updated Mon Jul 28 at 11:06 AM PDT. (DBC-66582) |
Highway 1 |
Highway 1 (TransCanada Highway). Road construction work planned between Annis Rd and Exit 135 for 6.1 km (Chilliwack). Starting Wed Sep 3 at 9:00 AM PDT until Wed Sep 3 at 1:00 PM PDT. Left lane will be closed in both directions. Fixing concrete barriers. Last updated Tue Sep 2 at 8:00 PM PDT. (DBC-81110) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Maintenance planned between Exit 153: Laidlaw Rd and Exit 160: Hunter Creek Rd for 5.1 km (7 to 2 km west of Hope). Starting Tue Sep 9 at 8:00 AM PDT until Tue Sep 9 at 5:00 PM PDT. Right lane will be closed. Last updated Thu Aug 28 at 2:01 PM PDT. (DBC-80991) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Tree pruning planned between Exit 160: Hunter Creek Rd and Exit 153: Laidlaw Rd for 6.4 km (7 to 1 km west of Hope). Starting Wed Sep 3 at 7:30 AM PDT until Wed Sep 3 at 4:00 PM PDT. Right lane will be closed. Last updated Tue Sep 2 at 1:28 PM PDT. (DBC-81108) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Blue Lake Rd and Jackass Summit for 7.8 km (Jackass Mountain Summit). Until Fri Sep 5 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on Wednesday, Thursday and Friday. Speed limit 60 km/h. Lane shift will be implemented. Last updated Thu Aug 28 at 10:38 AM PDT. (DBC-80984) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Utility work between Back Valley Rd and Juniper Beach Prov Park Access Rd for 5.8 km (8 to 14 km east of Cache Creek). Until Wed Sep 3. From 7:00 AM to 6:00 PM PDT daily. Lane closures in both directions in effect. Watch for traffic control. Last updated Wed Aug 27 at 10:58 AM PDT. (DBC-80933) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Tree pruning planned between Holman Rd and Miners Bluff Rd for 18.3 km (Kamloops). Starting Tue Sep 9 until Sat Sep 13. From 8:00 AM to 4:00 PM PDT daily. Right lane will be closed. Watch for traffic control personnel. Last updated Fri Aug 29 at 1:09 PM PDT. (DBC-81025) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Paving operations at Malakwa Rd (17 km east of Sicamous). Until Mon Sep 15. From 7:00 PM to 7:00 AM PDT on weekdays and Sunday. Lane Closure. Last updated Mon Aug 11 at 9:50 PM PDT. (DBC-80300) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Vehicle recovery between Clanwilliam OH Bridge and Boulder Mtn Avalanche Gate for 2.8 km (9 to 6 km west of Revelstoke). Until Wed Sep 3. From 10:00 PM to 2:00 AM PDT on Tuesday and Wednesday. Single lane alternating traffic. Watch for traffic control. Last updated Tue Sep 2 at 5:00 PM PDT. (DBC-81134) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge construction at Meadows in the Sky Pkwy (Revelstoke). Until Fri Oct 31. Watch for traffic control. Lane Closure. Expect speed reductions to 50km/hr. Lane width restricted to 4m. No work on long weekends. Last updated Thu Jun 12 at 1:18 PM PDT. (DBC-76584) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Rock scaling planned at West Boundary of Mount Revelstoke National Park (1 km west of West Boundary of Mount Revelstoke National Park). Starting Wed Sep 3 at 7:00 AM PDT until Thu Oct 30 at 7:00 PM PDT. Work is 19km to 28km east of Revelstoke. Expect speed reductions to 50 km/h in work zone, flag persons, lane closures and delays up to 20 minutes. Last updated Tue Sep 2 at 1:38 PM PDT. (DBC-81113) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between Hemlock Grove Boardwalk and Illecillewaet Campground for 0.6 km (8 to 9 km east of West Boundary of Glacier National Park). Until Fri Oct 31. From 7:00 AM to 7:00 PM PDT daily. Culvert replacement work. Speed limit 50km/h at all times due to narrowing/realignment requirements. Last updated Fri Jul 11 at 4:20 PM PDT. (DBC-79076) |
Highway 1 |
Highway 1 (TransCanada Highway). Rest area closed at Redgrave (14 km east of East Boundary of Glacier National Park). Redgrave rest area is permanently closed. New rest area will be built just west of the current location. Stay tuned for more updates as construction progresses. Next update time Mon Dec 1. Last updated Mon Jul 21 at 12:51 PM MDT. (DBC-73964) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between Redgrave and Wiseman Rd for 6.0 km (15 to 21 km east of East Boundary of Glacier National Park). Until Sat Nov 15. Watch for traffic control. Expect minor delays. Construction zone reduced speed limit in effect. Lane widths are 5 metres each direction. Watch for crews and expect delays. Next update time Sat Nov 15 at 10:00 AM MDT. Last updated Fri Aug 22 at 10:02 AM MDT. (DBC-75437) |
Highway 1 |
Highway 1 (Kicking Horse Pass). Maintenance planned between Golden Donald Upper Rd and Yoho Bridge for 7.8 km (Golden). Starting Mon Sep 8 at 7:30 AM MDT until Mon Sep 8 at 5:30 PM MDT. Watch for traffic control personnel. Reduce Speed. West bound lane shift from right lane to left lane. Last updated Thu Aug 28 at 6:32 PM MDT. (DBC-80998) |
Highway 10 Westbound |
Highway 10, westbound. Utility work planned between 180 St and 176A St for 0.1 km (Surrey). Starting Sun Sep 7 until Sun Sep 7. From 9:00 AM to 3:00 PM PDT daily. Right lane will be closed. Watch for traffic control personnel. Last updated Fri Aug 22 at 2:09 PM PDT. (DBC-79640) |
Highway 10 Westbound |
Highway 10, westbound. Utility work planned between 200 St and Landmark Gate for 0.7 km (1 km east of Langley - City to Surrey). Starting Thu Sep 11 at 8:00 PM PDT until Fri Sep 12 at 5:00 AM PDT. Right lane will be blocked. Watch for traffic control personnel. Last updated Mon Aug 25 at 3:35 PM PDT. (DBC-80848) |
Highway 101 Both Directions |
Highway 101, in both directions. Utility work between Curran Rd and St. Marys Hospital Dr for 15.1 km (Sechelt). Until Fri Sep 5. From 9:00 AM to 3:00 PM PDT on weekdays. Lane closures in both directions in effect. Last updated Tue Aug 26 at 9:28 AM PDT. (DBC-80884) |
Highway 11 Southbound |
Highway 11, southbound. Utility work planned between Delair Rd and Barrons Way for 1.1 km (Abbotsford). Starting Thu Sep 11 at 9:00 AM PDT until Tue Sep 23 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on weekdays. Right lane will be blocked. Right turn lane will be closed. Centre lane will be blocked. Watch for traffic control personnel. Last updated Mon Aug 25 at 4:09 PM PDT. (DBC-80866) |
Highway 11 Both Directions |
Highway 11, in both directions. Utility work planned at Hazelwood Ave (Abbotsford). Starting Mon Sep 8 at 9:00 AM PDT until Fri Sep 12 at 3:00 PM PDT. Right lane will be closed. Left turn lane will be closed. Last updated Tue Sep 2 at 3:45 PM PDT. (DBC-81129) |
Highway 11 Northbound |
Highway 11, northbound. Utility work planned between McCallum Rd and Bateman Rd for 1.0 km (Abbotsford). Starting Mon Sep 8 until Mon Sep 15. From 9:00 AM to 3:00 PM PDT daily. Right lane will be closed. Last updated Thu Jul 17 at 2:23 PM PDT. (DBC-79387) |
Highway 11 Northbound |
Highway 11, northbound. Utility work planned at McCallum Rd (Abbotsford). Starting Tue Sep 23 until Tue Sep 30. From 8:00 AM to 3:00 PM PDT daily. Right lane will be closed. Last updated Thu Jul 17 at 2:22 PM PDT. (DBC-79388) |
Highway 11 Southbound |
Highway 11, southbound. Construction work between London Ave Overpass and Riverside St for 2.6 km (Mission to Abbotsford). Until Wed Sep 3 at 6:30 AM PDT. Lane Closure. Speed reduced to 50km/hr. Last updated Tue Sep 2 at 3:27 PM PDT. (DBC-81126) |
Highway 11 Northbound |
Highway 11, northbound. Construction work between Riverside St and London Ave Overpass for 2.6 km (Mission to Abbotsford). Until Wed Sep 3 at 6:30 AM PDT. Lane Closure. Speed reduced to 50km/hr. Last updated Tue Sep 2 at 3:26 PM PDT. (DBC-81125) |
Highway 12 |
Highway 12. Utility work between Fraser Cres and Sumner Rd for 3.9 km (Lillooet). Until Wed Sep 10. From 8:00 AM to 4:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Please watch for traffic personnel and work crews. Expect minor delays of up to five minutes. Last updated Tue Sep 2 at 7:08 AM PDT. (DBC-80379) |
Highway 13 Both Directions |
Highway 13, in both directions. Construction work between 48 Ave and 56 Ave for 1.6 km (Langley - District). Until Tue Sep 30. From 7:00 AM to 7:00 PM PDT daily. Lane Closure. Watch for traffic control. Lane shift in place. Speed reduction to 40km/h. Last updated Mon Jul 28 at 9:11 AM PDT. (DBC-79797) |
Highway 14 |
Highway 14. Road maintenance work between Old Switchback Road and Cormorant Way for 23.6 km (1 km west of Jordan River to 13 km east of Port Renfrew). Until Fri Sep 19 at 6:00 PM PDT. From 7:00 AM to 6:00 PM PDT on weekdays. Single lane alternating traffic. Last updated Fri Aug 22 at 1:36 PM PDT. (DBC-80780) |
Highway 14 Both Directions |
Highway 14, in both directions. Utility work between Church Rd and Phillips Rd for 1.1 km (Sooke). Until Wed Dec 31 at 12:00 PM PDT. Lane Closure. Watch for traffic control. Last updated Mon May 5 at 7:43 AM PDT. (DBC-75277) |
Highway 14 Both Directions |
Highway 14, in both directions. Utility work at Church Rd (Sooke). Until Thu Sep 4. From 10:00 PM to 4:00 AM PDT daily. Traffic signal out. Watch for traffic control. Last updated Wed Aug 27 at 8:54 AM PDT. (DBC-80928) |
Highway 14 Both Directions |
Highway 14, in both directions. Utility work planned at Belvista Pl (Sooke). Starting Thu Sep 4 at 9:00 AM PDT until Thu Sep 4 at 3:00 PM PDT. Right turn lane will be closed. Left turn lane will be closed. Watch for traffic control personnel. Belvista Pl will be closed. No access from Sooke Rd / Hwy 14. Last updated Wed Aug 27 at 10:06 AM PDT. (DBC-80932) |
Highway 14 Eastbound |
Highway 14, eastbound. Utility work between Sooke River Rd and Ludlow Rd for 3.3 km (Sooke). Until Fri Sep 12. From 7:00 PM to 5:00 AM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. Last updated Thu Aug 28 at 8:43 AM PDT. (DBC-79811) |
Highway 15 Northbound |
Highway 15 (Pacific Highway), northbound. Utility work planned between 20 Ave and 24 Ave for 0.8 km (Surrey). Starting Tue Sep 9 at 9:00 AM PDT until Fri Sep 12 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on Tuesday, Wednesday, Thursday and Friday. Right lane will be closed. Watch for traffic control personnel. Last updated Fri Aug 22 at 9:33 AM PDT. (DBC-80760) |
Highway 15 Both Directions |
Highway 15 (Pacific Highway), in both directions. Road construction work between 68A Ave and Fraser Hwy for 0.6 km (Surrey). Until Mon Sep 15. From 8:00 PM to 6:00 AM PDT daily. Lane closures in both directions in effect. Watch for traffic control. Last updated Sun Aug 31 at 10:53 PM PDT. (DBC-80979) |
Highway 16 |
Highway 16 (on Haida Gwaii). Special event planned between Masset Cemetery Rd and Pure Lake Rest Area for 18.6 km (Masset). Starting Sun Sep 7 at 8:00 AM PDT until Sun Sep 7 at 2:00 PM PDT. Agate Man Triathalon. Last updated Tue Sep 2 at 1:26 PM PDT. (DBC-81107) |
Highway 16 Both Directions |
Highway 16 (on Haida Gwaii), in both directions. Bridge maintenance between E Cedar Ave and Beitush Rd for 6.3 km (7 km west of Tlell to 5 km east of Port Clements). Bridge construction. Bridge repairs in effect at Woodpile Bridge. Speed reduction, reduce speed. Next update time Fri Sep 5 at 12:30 PM PDT. Last updated Mon Sep 1 at 12:24 PM PDT. (DBC-74895) |
Highway 16 Both Directions |
Highway 16 (on Haida Gwaii), in both directions. Road maintenance work between Lawnhill Rd and Miller Rd for 9.3 km (13 to 4 km west of Skidegate). Watch for traffic control. Culvert work, reduce speed, watch for crews, obey traffic signs. Next update time Fri Sep 5 at 12:30 PM PDT. Last updated Mon Sep 1 at 12:22 PM PDT. (DBC-80321) |
Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Construction work between Port Edward Turnoff and Rainbow Avalanche Gates (16 km east of Prince Rupert). Until Thu Oct 9. From 6:00 AM to 6:00 PM PDT daily. Industrial traffic may slow or block regular traffic. Watch for traffic control. Speed reduction in place during work hours. Last updated Thu Aug 21 at 10:59 AM PDT. (DBC-80731) |
Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Paving operations between Fraser Mountain Rd and Engen Townsite Rd for 22.7 km (3 km west of Fort Fraser to 14 km west of Vanderhoof). Until Sun Sep 28. From 7:00 AM to 7:00 PM PDT daily. Shoulder maintenance and milling planned. Watch for traffic control personnel. Expect delays. Last updated Fri Jul 18 at 4:55 PM PDT. (DBC-79459) |
Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Road maintenance work between Horsey Creek Rd and Small Creek Bridge for 4.7 km (15 to 20 km west of Tete Jaune). Until Thu Oct 30 at 6:00 PM PDT. Lane Closure. Single lane alternating traffic. Watch for traffic control. Maximum overall width is 5m. Loads over 5m must contact rbuckham@outlook.Com with a minimum of 48-hours to see if they can be accommodated. Last updated Wed Aug 27 at 10:07 PM PDT. (DBC-79051) |
Highway 16 Westbound |
Highway 16 (Yellowhead Highway), westbound. Utility work between Hargreaves Rd and Rearguard Falls Access for 12.1 km (4 to 16 km east of Tete Jaune). Until Thu Sep 11 at 6:00 PM PDT. Shoulder closed. Watch for traffic control. Last updated Thu Aug 28 at 9:11 AM PDT. (DBC-80977) |
Highway 17 Southbound |
Highway 17, southbound. Road maintenance work between Saanich Rd and Tolmie Ave for 0.8 km (Saanich to 1 km north of Victoria). Until Tue Sep 30. From 8:00 AM to 4:00 PM PDT daily. Right lane closed. Watch for traffic control. Last updated Mon Aug 18 at 9:45 AM PDT. (DBC-80589) |
Highway 17 |
Highway 17. Road construction work at Ravine Way (Saanich). Watch for traffic control. Traffic pattern change and night closures on Ravine Way. Plan your route accordingly and expect traffic delays. Construction zone in effect 24/7. Last updated Fri Aug 1 at 1:47 PM PDT. (DBC-79781) |
Highway 17 Both Directions |
Highway 17 (Patricia Bay Highway), in both directions. Utility work planned between Exit 15: Sayward Rd and Gliddon Rd for 2.1 km (Central Saanich to Saanich). Starting Thu Sep 11 until Fri Sep 12. From 9:00 PM to 6:00 AM PDT on Thursday and Friday. Last updated Tue Sep 2 at 10:05 AM PDT. (DBC-81096) |
Highway 19 Both Directions |
Highway 19 (Island Highway), in both directions. Road construction work between Sayward Timber and Barge Terminal Rd for 5.4 km (Campbell River). Until Fri Sep 26 at 11:45 PM PDT. Minor congestion. Please expect a speed reduction on Hwy 19 to access the detour road for Race Point Road
The speed will be reduced to 60KM/H 24 hours a day 7 days a week. Last updated Fri Aug 15 at 12:15 PM PDT. (DBC-80514) |
Highway 19 Southbound |
Highway 19 (Island Highway), southbound. Utility work planned between Orange Point Rd and McDonald Rd for 0.4 km (Campbell River). Starting Mon Sep 8 at 8:00 AM PDT until Fri Sep 12 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Thu Aug 28 at 10:59 AM PDT. (DBC-80985) |
Highway 19 Northbound |
Highway 19 (Inland Island Highway), northbound. Paving operations between Dove Creek Rd and Jubilee Pky for 30.4 km (10 km north of Cumberland to Campbell River). Until Fri Sep 19. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Northbound lane closure. Watch for traffic control. One lane each direction via southbound lanes. Last updated Tue Aug 19 at 9:50 AM PDT. (DBC-80638) |
Highway 19 Northbound |
Highway 19 (Inland Island Highway), northbound. Construction work between Hamm Rd and Duncan Bay Main for 3.8 km (12 to 8 km south of Campbell River). Until Tue Sep 30 at 5:00 PM PDT. Watch for traffic control. Shoulder closed. Last updated Wed Aug 13 at 9:26 AM PDT. (DBC-80419) |
Highway 19A |
Highway 19A (Island Highway). Ditching between Comox Rd and Ryan Rd for 1.5 km (Courtenay). Lane Closure. Watch for traffic control. Right lane closed. Last updated Tue Jul 29 at 11:25 AM PDT. (DBC-79859) |
Highway 19A Both Directions |
Highway 19A (Island Highway), in both directions. Utility work between Iron River Rd and Colorado Dr for 6.8 km (Campbell River). Until Fri Sep 19 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. When work on shoulder is not available expect Single Lane Alternating Traffic on 19A 9am to 3pm. Last updated Wed Aug 6 at 10:17 AM PDT. (DBC-80147) |
Highway 19A |
Highway 19A (Island Highway). Construction work between Henry Rd and Heard Rd for 2.8 km (4 to 1 km south of Campbell River). Until Fri Jan 30, 2026 at 7:00 PM PDT. Multiple locations. Work at each location done within 3 hrs. Last updated Tue Apr 8 at 2:45 PM PDT. (DBC-75100) |
Highway 19A Northbound |
Highway 19A (Island Highway), northbound. Utility work planned between Iron River Rd and Lynnwood Rd for 2.8 km (4 to 7 km south of Campbell River). Starting Tue Sep 16 at 9:00 AM PDT until Tue Sep 16 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Thu Aug 28 at 10:07 AM PDT. (DBC-80982) |
Highway 1A |
Highway 1A. Construction work at Pattullo Bridge (New Westminster). Activities related to Pattullo Bridge replacement project. Watch for crews. Road closures to be posted as they are confirmed. Visit https://www.Pattullobridgereplacement.Ca/ or call the 24/7 hotline at 1-844-815-6149 for more info. Next update time Wed Oct 1 at 12:00 PM PDT. Last updated Thu Aug 7 at 8:31 AM PDT. (DBC-80168) |
Highway 20 |
Highway 20. Utility work between Wr Graham Road and Smokey Lake FSR. Until Wed Sep 17. From 8:00 AM to 4:00 PM PDT on weekdays. Please watch for traffic control personnel. Expect minor delays of up to five minutes. Last updated Mon Aug 25 at 11:31 AM PDT. (DBC-80853) |
Highway 20 |
Highway 20. Limited visibility with smoke between Hunlen Falls Turner Lakes Trailhead and Sawmill Creek Rd for 136.7 km (39 km west of Anahim Lake to Tatla Lake). Last updated Wed Sep 3 at 1:20 AM PDT. (DBCRCON-223448) |
Highway 20 |
Highway 20. Utility work between Thompson Rd and Lyle Rd for 1.6 km (19 to 18 km east of Anahim Lake). Until Wed Sep 17. From 8:00 AM to 4:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Please watch for traffic control personnel. Expect minor delays of up to five minutes. Last updated Mon Aug 25 at 11:20 AM PDT. (DBC-80852) |
Highway 20 Both Directions |
Highway 20, in both directions. Watch for livestock between Elsey Rd and Chipman Rd for 143.1 km (39 km east of Tatla Lake to 6 km west of Anahim Lake). Last updated Wed Sep 3 at 1:19 AM PDT. (DBC-78509) |
Highway 23 Both Directions |
Highway 23, in both directions. Electrical maintenance planned between 5 Mile Boat Launch and St. Cyr Bridge for 5.1 km (1 to 6 km north of Revelstoke). Starting Mon Sep 29 until Fri Oct 3. From 8:00 AM to 4:00 PM PDT on weekdays. Road will be closed intermittently. Last updated Fri Aug 29 at 3:33 PM PDT. (DBC-81033) |
Highway 23 Northbound |
Highway 23, northbound. Utility work between Downie Ck. Bridge and Big Mouth Ck. Bridge for 54.0 km (59 km north of Revelstoke to 25 km south of Mica Dam). Until Fri Sep 5. From 10:00 AM to 4:00 PM PDT daily. Right lane closed. Last updated Thu Aug 14 at 4:18 PM PDT. (DBC-80490) |
Highway 23 Southbound |
Highway 23, southbound. Electrical maintenance planned between Mica Dam Avalanche Gates and Canoe St - Mica Village (1 km south of Mica Dam). Starting Wed Sep 17 at 7:00 AM PDT until Thu Sep 18 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT on Wednesday and Thursday. Shoulder will be closed. Last updated Sat Aug 30 at 5:55 PM PDT. (DBC-81058) |
Highway 24 |
Highway 24. Utility work between Wavey Lake Forest Service Rd and Machete Lake Rd 37 km east of Lone Butte. Until Fri Sep 12 at 4:00 PM PDT. Single lane alternating traffic. Monday through Friday. Watch for signage and personnel. Speed reduction to 50km/hr. Delays of 5 minutes. Last updated Tue Jul 22 at 9:26 AM PDT. (DBC-79573) |
Highway 26 |
Highway 26. Utility work planned between Aird Rd and Quesnel Canyon Rd for 0.8 km (2 km east of Quesnel). Starting Sun Sep 14 until Sat Sep 20. From 5:00 AM to 6:00 PM PDT daily. Single lane alternating traffic will be in effect. Please watch for traffic control. Expect minor delays of up to five minutes. Last updated Tue Sep 2 at 11:12 AM PDT. (DBC-81103) |
Highway 29 Both Directions |
Highway 29, in both directions. Bridge maintenance between Monkman Way and Bullmoose Rd for 0.6 km (Tumbler Ridge). Until Wed Oct 1. From 12:00 AM to 12:00 AM MST on weekdays and Saturday. Single lane alternating traffic will be in effect 24 hours a day. Watch out for crews and equipment. A minimum lane width of 4.6m will be maintained throughout the duration of the works. Last updated Mon Jul 7 at 8:05 AM MST. (DBC-78833) |
Highway 29 |
Highway 29. Utility work between 46th St NE and Lakeshore Dr for 24.6 km (Chetwynd). Until Fri Sep 12. From 7:00 AM to 7:00 PM MST on weekdays. Single lane alternating traffic. Shoulder closed. Watch for traffic control. Last updated Fri Aug 22 at 10:36 AM MST. (DBC-78429) |
Highway 29 Northbound |
Highway 29, northbound. Utility work between Lemieux St and Kyllo St for 0.1 km (Hudson's Hope). Until Fri Sep 5. From 9:00 AM to 5:00 PM MST daily. Right lane closed. Last updated Thu Aug 21 at 9:19 AM MST. (DBC-80720) |
Highway 29 Northbound |
Highway 29, northbound. Utility work between Farrell Creek Rd and Donis Rd for 49.3 km (12 to 61 km north of Hudson's Hope). Until Fri Oct 17. From 8:00 AM to 4:00 PM MST daily. Right lane is blocked. Last updated Wed Aug 13 at 9:32 AM MST. (DBC-80418) |
Highway 29 Southbound |
Highway 29, southbound. Electrical maintenance between Halfway River Bridge and Farrell Creek Bridge (35 km north of Hudson's Hope). Until Fri Sep 5. From 9:00 AM to 5:00 PM MST daily. Right lane closed. Last updated Wed Aug 13 at 9:31 AM MST. (DBC-80420) |
Highway 29 |
Highway 29. Road maintenance work between Halfway River Bridge and Upper Cache Rd for 1.8 km (42 to 40 km north of Hudson's Hope). Until Wed Sep 3 at 4:00 PM MST. From 7:00 AM to 4:00 PM MST on Tuesday and Wednesday. Single lane alternating traffic. Please slow down for crews and equipment. Last updated Tue Sep 2 at 9:04 AM MST. (DBC-81095) |
Highway 29 |
Highway 29. Road construction work planned between Szoo Rd and Cache Creek Bridge for 7.9 km (46 to 53 km north of Hudson's Hope). Starting Wed Sep 3 at 8:00 AM MST until Wed Sep 3 at 5:00 PM MST. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Reduce speeds to 10KM per hour. Last updated Tue Sep 2 at 8:11 PM MST. (DBC-81138) |
Highway 29 Southbound |
Highway 29, southbound. Utility work between Tompkins Frtg and Bennett Rd for 8.4 km (73 to 64 km north of Hudson's Hope). Until Mon Sep 15. From 8:00 AM to 6:00 PM MST daily. Single lane alternating traffic. Watch for traffic control. Last updated Fri Aug 29 at 9:05 AM MST. (DBC-81017) |
Highway 3 Eastbound |
Highway 3 (Crowsnest Highway), eastbound. Utility work between Exit 173: Old Hope Princeton Way and First Avalanche Gate for 5.2 km (Hope). Until Fri Sep 5. From 8:00 AM to 4:00 PM PDT daily. Speed reduction to 70km/h. Last updated Fri Aug 8 at 11:27 AM PDT. (DBC-80226) |
Highway 3 Eastbound |
Highway 3 (Crowsnest Highway), eastbound. Construction work between First Avalanche Gate and Sunshine Valley for 3.9 km (14 to 17 km east of Hope). Until Mon Sep 15. From 7:00 AM to 7:00 PM PDT daily. Right lane closed. Last updated Thu Aug 21 at 10:03 AM PDT. (DBC-80723) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Road maintenance work planned between Second Avalanche Gate and Allison Pass Summit for 29.6 km (25 to 54 km east of Hope). Starting Wed Sep 3 at 9:00 AM PDT until Wed Sep 3 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Tue Sep 2 at 4:18 PM PDT. (DBC-81131) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Construction work between Second Avalanche Gate and Allison Pass Summit for 7.9 km (33 to 40 km east of Hope). Until Mon Dec 1 at 7:00 PM PDT. From 6:00 AM to 7:00 PM PDT on weekdays. Expect delays. Lane Closure. Temporary detour at Snass Creek Bridge. Last updated Mon Apr 21 at 12:32 PM PDT. (DBC-74724) |
Highway 3 Westbound |
Highway 3 (Crowsnest Highway), westbound. Utility work between Allison Pass Summit and Second Avalanche Gate for 14.8 km (54 to 40 km east of Hope). Until Fri Sep 5. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic. Last updated Tue Aug 12 at 11:30 AM PDT. (DBC-80363) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Road construction work between Garret Rd and Sunday Summit for 11.3 km (43 to 32 km west of Princeton). Until Fri Oct 31. Single lane alternating traffic. Watch for traffic control. Minimum width to be maintained through project zone is 4.4 meters. Last updated Thu Aug 21 at 2:00 PM PDT. (DBC-77799) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Maintenance between Vermilion Ave and Copper Mountain Rd for 0.4 km (Princeton). Lane Closure. Centre lane closed. Centre eastbound and centre westbound lane closed until further notice for repairs. Last updated Mon Aug 11 at 1:48 PM PDT. (DBC-80312) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Paving operations between Sunday Summit and Copper Mountain Rd for 34.2 km (Princeton). Until Sat Oct 4 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Watch for traffic control. Width limit 5.00 m. Height limit 5.00 m. Project parameters are from Sunday Summit to Princeton. Expect delays of up to 20 minutes. Last updated Thu Aug 21 at 11:49 AM PDT. (DBC-78739) |
Highway 3 Eastbound |
Highway 3 (Crowsnest Highway), eastbound. Road maintenance work planned between Maguire Rd and Long Joe Rd for 0.7 km (10 to 11 km east of Osoyoos). Starting Thu Sep 4 at 7:30 AM PDT until Thu Sep 4 at 12:00 PM PDT. Westbound lane will be closed. Watch for traffic control personnel. Last updated Tue Sep 2 at 7:04 AM PDT. (DBC-81091) |
Highway 3 |
Highway 3 (Crowsnest Highway). Watch for falling rocks between Wilgress Lake Rest Area and Granby Rd for 26.1 km (2 km west of Eholt Summit to Grand Forks). Last updated Tue Apr 1 at 4:26 AM PDT. (DBC-73820) |
Highway 3 |
Highway 3 (Crowsnest Highway). Watch for falling rocks between East Lake Dr and Highway 3B for 39.8 km (Christina Lake to 24 km west of Castlegar). Last updated Tue Apr 1 at 4:26 AM PDT. (DBC-73822) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Construction work planned at Porto Rico Rd (2 km east of Moyie). Starting Fri Sep 5 at 7:00 AM MDT until Sat Nov 1 at 5:00 PM MDT. From 7:00 AM to 5:00 PM MDT on weekdays and Saturday. Right lane will be closed. Shoulder will be closed. Grading and paving upgrades for new sign installation. Last updated Tue Sep 2 at 11:13 AM MDT. (DBC-81097) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Construction work planned at Peavine Bridge (9 km east of Moyie). Starting Fri Sep 5 at 7:00 AM MDT until Sat Nov 1 at 5:00 PM MDT. From 7:00 AM to 5:00 PM MDT on weekdays and Saturday. Right turn lane will be closed. Shoulder will be closed. Grading and paving upgrades for sign installation. Last updated Tue Sep 2 at 11:12 AM MDT. (DBC-81098) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Paving operations at Cedar Ave (Fernie). Until Mon Sep 15. From 9:00 AM to 3:00 PM MDT daily. Road maintenance work. Work on shoulders. Watch for crews and traffic control. Last updated Tue Jul 15 at 6:50 PM MDT. (DBC-79287) |
Highway 31 |
Highway 31. Road construction work between Sutton St and Cody Caves Rd for 3.7 km (13 km north of Balfour to 16 km south of Kaslo). For a month. Single lane alternating traffic. Next update time Mon Sep 8. Last updated Tue Aug 26 at 3:05 PM PDT. (DBC-80896) |
Highway 33 Both Directions |
Highway 33, in both directions. Utility work between Beaverdell Station Rd and Carmi Station for 5.2 km (Beaverdell). Until Fri Sep 5. From 7:00 AM to 5:00 PM PDT daily. Single lane alternating traffic. Watch for traffic control. Speed reduction to 60 km/h. 7am-2pm Aug 29. No work Aug 30-Sept 1. September 2 Noon-5pm. Last updated Wed Aug 20 at 9:15 AM PDT. (DBC-79106) |
Highway 37 |
Highway 37. Construction work planned between Water Lily Bay Rd and Krumm Ave for 13.5 km (56 to 43 km north of Kitimat). Starting Mon Sep 8 until Tue Sep 30. From 7:30 AM to 5:30 PM PDT daily. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Tue Sep 2 at 11:56 AM PDT. (DBC-81104) |
Highway 37 Both Directions |
Highway 37, in both directions. Bridge construction at Hanna North Bridge (7 km north of Meziadin). Until Fri Oct 31. Single lane alternating traffic. Width limit 4.00 m. EOL approvals up to 85 tonnes with no centre line crossing restriction. Expect minor delays. Next update time Tue Sep 30 at 8:00 AM PDT. Last updated Fri Aug 29 at 7:59 AM PDT. (DBC-76204) |
Highway 37A Both Directions |
Highway 37A, in both directions. Paving operations between Bitter Cr. Bridge and Windy Point Bridge for 29.4 km (11 km east of Stewart to 18 km west of Meziadin). Until Sat Sep 13. Single lane alternating traffic. Expect delays up to 20 minutes. Watch for traffic control. Last updated Sat Jul 26 at 3:54 PM PDT. (DBC-78756) |
Highway 37A Both Directions |
Highway 37A, in both directions. Watch for falling rocks between Bitter Cr. Bridge and Surprise Pullout/Windy Chain Up for 34.6 km (13 km west of Meziadin to 11 km east of Stewart). Last updated Wed Sep 3 at 1:19 AM PDT. (DBC-74957) |
Highway 3A Southbound |
Highway 3A, southbound. Utility work planned between Birch Rd and Smith Rd for 0.4 km (15 km south of Kootenay Bay Ferry Landing). Starting Fri Sep 5 at 9:00 AM PDT until Fri Sep 5 at 12:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Tue Aug 26 at 3:48 PM PDT. (DBC-80901) |
Highway 3A Both Directions |
Highway 3A, in both directions. Blasting between Kuskonook Rest Area and Bathie Rd for 0.3 km (4 km south of Kuskonook). Until Fri Oct 31. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. Expect delays. Up to 20 min delays throughout the day, with scheduled 1 hour closures from 0930-1030 and from and from 1430-1530. Last updated Tue Sep 2 at 8:27 AM PDT. (DBC-80874) |
Highway 3A Southbound |
Highway 3A, southbound. Utility work planned between Elsie Holmes Rd and Lachat Rd for 0.4 km (6 to 7 km north of Creston). Starting Wed Sep 3 at 9:00 AM PDT until Wed Sep 3 at 12:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Tue Aug 26 at 3:53 PM PDT. (DBC-80900) |
Highway 4 Both Directions |
Highway 4, in both directions. Road construction work between Maltby Rd and Radar Hill for 0.7 km (1 km east of Tofino to 1 km east of North Boundary of Pacific Rim National Park in Tofino). Until Tue Sep 30. Single lane alternating traffic. Expect delays. Watch for traffic control. Hwy 4 Base Repair - 24/7 Single Lane alternating traffic - Up to 20 min delays. Slow down and watch for work crews. Last updated Thu Aug 7 at 12:08 PM PDT. (DBC-79852) |
Highway 4 Both Directions |
Highway 4, in both directions. Construction work between Hydro Hill West Creek and Kennedy River Rest Area for 2.3 km (25 km west of Sutton Pass Summit to 23 km east of Southern Boundary of Pacific Rim National Park). Until Fri Oct 31. Single lane alternating traffic. Watch for speed reduction and Trucks turning. Next update time Fri Oct 31 at 9:00 AM PDT. Last updated Wed Aug 20 at 9:36 AM PDT. (DBC-78891) |
Highway 4 Both Directions |
Highway 4, in both directions. Construction work between Stuart Ave and Wattys Rd for 0.1 km (3 to 2 km west of Port Alberni). Until Fri Sep 12 at 4:00 PM PDT. Single lane alternating traffic. Expect minor delays. Watch for traffic control. Slow down and watch for work crews. Last updated Mon Aug 25 at 8:40 AM PDT. (DBC-80843) |
Highway 4 Eastbound |
Highway 4, eastbound. Utility work between Margaret St and Adelaide St for 0.2 km (Port Alberni). Until Fri Sep 19 at 4:00 PM PDT. Watch for traffic control. TELUS Pole work - PARKING LANE CLOSURE. Slow down and watch for work crews. Last updated Fri Aug 8 at 2:56 PM PDT. (DBC-80251) |
Highway 4 Both Directions |
Highway 4, in both directions. Maintenance between Port Alberni Summit and Chalet Rd for 9.5 km (Cathedral Grove). Vehicles/loads over 3.2m in width must contact Permit Centre for instructions at 1-800-559-9688. Daytime travel restriction, must travel between 9pm-5am. Next update time Fri Nov 14 at 10:00 AM PDT. Last updated Fri Aug 1 at 10:04 AM PDT. (DBC-52953) |
Highway 5 Northbound |
Highway 5 (Coquihalla South), northbound. Construction work between Exit 183: Othello Rd and Exit 195 for 12.5 km (6 km north of Hope to 16 km south of Great Bear Snowshed). Until Fri Sep 12 at 6:00 PM PDT. Right lane closed. Construction/Rehabilitation work of Exit 195/Carolin Mine Rd between Jessica Bridge and Ladner Creek Bridge. Last updated Mon Jul 14 at 2:54 PM PDT. (DBC-79223) |
Highway 5 Northbound |
Highway 5 (Coquihalla South), northbound. Bridge maintenance at Exit 183: Othello Rd (6 km north of Hope). From 5:00 AM to 7:30 PM PDT on Tuesday, Wednesday and Thursday. Right lane closed. Last updated Mon Jul 28 at 10:39 AM PDT. (DBC-79808) |
Highway 5 Both Directions |
Highway 5 (Coquihalla South), in both directions. Construction work between Exit 202: Portia and Exit 217: Zopkios Brake Check for 14.0 km (3 km south of Coquihalla Summit to 11 km south of Great Bear Snowshed). Left lane is closed in both directions. 24/7 barrier work. Please obey signage and slow down for workers. RCMP-enforced speed reduction. Next update time Mon Sep 15 at 12:00 PM PDT. Last updated Wed Aug 20 at 12:16 PM PDT. (DBC-79196) |
Highway 5 Both Directions |
Highway 5 (Coquihalla South), in both directions. Paving operations between Exit 221: Falls Lake Rd and Exit 231: Mine Creek Rd for 6.3 km (3 to 10 km north of Coquihalla Summit). Until Tue Sep 30 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Lane closures in both directions in effect. Watch for traffic control. Dry Gulch Bridge to Henning Bridge. Delays up to 15 minutes for paving. Last updated Mon Jul 21 at 9:19 AM PDT. (DBC-79513) |
Highway 5 Southbound |
Highway 5 (Coquihalla South), southbound. Electrical maintenance planned between Exit 228: Coquihalla Lakes Rd and Exit 221: Falls Lake Rd (3 km north of Coquihalla Summit). Starting Thu Sep 4 at 11:00 AM PDT until Thu Sep 4 at 12:00 PM PDT. Right lane will be closed. Watch for traffic control personnel. Right lane will be closed at Dry Gulch Bridge for replacement of streetlight. Speed reduction will be in effect. Last updated Tue Sep 2 at 2:12 PM PDT. (DBC-81114) |
Highway 5 Northbound |
Highway 5 (Coquihalla South), northbound. Electrical maintenance planned between Exit 221: Falls Lake Rd and Exit 228: Coquihalla Lakes Rd (5 km north of Coquihalla Summit). Starting Thu Sep 4 at 1:00 PM PDT until Thu Sep 4 at 3:00 PM PDT. Right lane will be closed. Watch for traffic control personnel. Right lane will be closed at Old Toll Plaza for replacement of streetlight. Speed reduction will be in effect. Last updated Tue Sep 2 at 2:12 PM PDT. (DBC-81115) |
Highway 5 |
Highway 5 (Coquihalla North). Construction work between Exit 286: Merritt - 97C and Exit 315: Helmer Rd for 12.8 km (Merritt). Until Tue Sep 30 at 6:00 PM PDT. Lane Closure. Watch for traffic control. Last updated Wed Jun 25 at 9:23 AM PDT. (DBC-78512) |
Highway 5 |
Highway 5 (Coquihalla North). Construction work between Exit 315: Helmer Rd and Exit 336: Walloper Interchange for 20.7 km (Surrey Lake Summit). Until Tue Sep 30 at 6:00 PM PDT. Lane Closure. Watch for traffic control. Last updated Wed Jun 25 at 9:28 AM PDT. (DBC-78513) |
Highway 5 Northbound |
Highway 5, northbound. Shoulder maintenance planned between Oka Trail and Chief Louis Way for 1.5 km (Kamloops). Starting Wed Sep 3 at 7:00 PM PDT until Thu Sep 4 at 5:00 AM PDT. Right lane will be closed. Watch for traffic control personnel. Last updated Thu Aug 21 at 10:55 AM PDT. (DBC-80730) |
Highway 5 Northbound |
Highway 5, northbound. Utility work between Kealty Rd and Walterdale Rd for 2.0 km (15 to 17 km north of Kamloops). Until Thu Sep 4. From 7:00 AM to 5:00 PM PDT daily. Lane Closure. Single lane alternating traffic. Watch for traffic control. Last updated Wed Aug 27 at 11:07 AM PDT. (DBC-80728) |
Highway 5 Both Directions |
Highway 5, in both directions. Electrical maintenance planned between Hoirup Rd and Skinner Rd for 3.5 km (7 to 10 km north of Vavenby). Starting Wed Sep 3 at 8:00 AM PDT until Thu Sep 4 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Tue Aug 26 at 11:31 AM PDT. (DBC-80765) |
Highway 5 Northbound |
Highway 5, northbound. Ditching between Albreda Pit Rd and Camp Creek Rest Area for 14.3 km (23 to 9 km south of Valemount). Southbound lane closure. Watch for traffic control. Truck speed limit 70 km/h. Ditching work, North Bound lane reduced to 70 kilometers per hour. Next update time Tue Sep 30 at 8:30 AM PDT. Last updated Mon Jul 21 at 5:47 PM PDT. (DBC-79542) |
Highway 5 Both Directions |
Highway 5, in both directions. Road construction work between Whiskeyfill Rd and Tete Jaune Access Rd for 24.1 km (5 km south of Valemount to 1 km south of Tete Jaune). Until Mon Oct 20. From 12:00 AM to 12:00 AM PDT daily. Paving operations. Single lane alternating traffic. Pilot car controlled. Last updated Tue Sep 2 at 7:50 AM PDT. (DBC-81092) |
Highway 5 Northbound |
Highway 5, northbound. Paving operations between Cedarside Rd; Cranberry Lake Rd and Tete Jaune Access Rd for 22.3 km (2 km south of Valemount to 1 km south of Tete Jaune). Until Sat Sep 27 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Pilot car controlled. Roadside barriers removed. Watch for crews on highway. Last updated Sun Jul 13 at 8:26 PM PDT. (DBC-79166) |
Highway 6 EW Both Directions |
Highway 6 EW, in both directions. Tree pruning between Monashee Summit and Ferrie Rd for 7.3 km (18 to 10 km west of Needles). Until Fri Oct 31. From 7:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. No work on Statutory Holidays. Last updated Mon Aug 18 at 9:50 AM PDT. (DBC-80590) |
Highway 6 NS Both Directions |
Highway 6 NS, in both directions. Construction work planned between Storbo Rd and Pass Creek Rd for 6.9 km (5 km south of Passmore to 2 km west of Playmor Junction). Starting Mon Sep 8 until Sat Oct 25. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic will be in effect. Last updated Fri Aug 22 at 3:16 PM PDT. (DBC-80787) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 272 St for 0.5 km (Maple Ridge). From 7:00 AM to 5:00 PM PDT daily. Watch for traffic control. September 2-6, 8-13, 15-20, 22-27. Construction speed zone 50km/hr. Next update time Mon Sep 22 at 5:00 PM PDT. Last updated Tue Sep 2 at 7:07 AM PDT. (DBC-70968) |
Highway 7 Westbound |
Highway 7 (Lougheed Highway), westbound. Utility work planned between Waring Rd and Rowan Rd for 1.1 km (5 to 6 km east of Mission). Starting Thu Sep 11 at 9:00 AM PDT until Thu Sep 11 at 3:00 PM PDT. Watch for traffic control personnel. Last updated Wed Aug 27 at 2:37 PM PDT. (DBC-80946) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Road maintenance work between Taylor Rd and Harrison Bay Rd for 8.1 km (13 km east of Mission to 6 km west of Kent). Until Tue Sep 30. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays. Last updated Sat Aug 30 at 11:48 PM PDT. (DBC-79598) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Utility work between Beach Camp Rd and Harrison Mills Bridge for 1.3 km (Kent). Until Fri Sep 19. From 9:00 AM to 3:00 PM PDT daily. Lane Closure. Watch for traffic control. Expect delays. No lane closures from 12pm Aug 29th - 12pm Sept 2nd. Last updated Thu Aug 28 at 10:58 AM PDT. (DBC-80938) |
Highway 77 Both Directions |
Highway 77, in both directions. Seal coating between Junction Highway 97 and Maxhamish Lake Rd for 55.5 km (137 to 81 km south of British Columbia and Northwest Territory Border). From 7:00 AM to 5:00 PM MST daily. Single lane alternating traffic. Piloting will be in effect 24/7. Watch for crews. No long weekend work Fri Aug 29-Sept 1. 70km/h speed zone. Next update time Fri Sep 5 at 10:00 AM MST. Last updated Thu Aug 28 at 8:45 AM MST. (DBC-79976) |
Highway 7B Westbound |
Highway 7B (Mary Hill Bypass), westbound. Construction work between Coast Meridian Rd and Broadway St for 0.6 km (Port Coquitlam). Until Fri Oct 31. From 9:00 AM to 3:00 PM PDT daily. Lane Closure. Bus Stop Improvement project. Last updated Wed Jun 18 at 1:02 PM PDT. (DBC-78197) |
Highway 7B Westbound |
Highway 7B (Mary Hill Bypass), westbound. Construction work between Kingsway Ave and Coast Meridian Rd for 0.5 km (Port Coquitlam). Until Wed Dec 31 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on weekdays. Right lane closed. Bus Stop Improvement project. Next update time Mon Dec 15 at 10:00 AM PDT. Last updated Wed Jul 16 at 10:00 AM PDT. (DBC-78829) |
Highway 8 Both Directions |
Highway 8, in both directions. Construction work between Start of Highway 8 and Porcupine Ridge Rd 6 km east of Spences Bridge. Until Sat Nov 15. Single lane alternating traffic. Watch for traffic control. Expect delays. SITE 16, 17, 18, 19. Last updated Tue Aug 26 at 5:25 PM PDT. (DBC-80660) |
Highway 8 |
Highway 8. Watch for falling rocks between the start of Highway 8 and Dot Ranch Cut-Off Rd West for 34.8 km (Spences Bridge to 29 km west of Merritt). There is debris on the road. Last updated Wed Sep 3 at 1:20 AM PDT. (DBC-72877) |
Highway 8 |
Highway 8. Construction work between the start of Highway 8 and Porcupine Ridge Rd for 2.6 km (Spences Bridge). Until Fri Sep 5 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. Site 20/21. Last updated Fri Aug 29 at 1:25 PM PDT. (DBC-79173) |
Highway 8 |
Highway 8. Construction work planned between the start of Highway 8 and Porcupine Ridge Rd for 0.3 km (Spences Bridge). Starting Wed Sep 3 at 7:00 AM PDT until Sat Sep 13 at 5:00 PM PDT. Site 22. Single lane alternating traffic will be in effect 24 hrs. Watch for traffic control personnel and obey traffic signals. Expect delays of 5 to 30-min closures between 7AM to 5PM. Last updated Fri Aug 29 at 1:19 PM PDT. (DBC-80709) |
Highway 8 |
Highway 8. Construction work between the start of Highway 8 and Porcupine Ridge Rd for 3.3 km (5 to 8 km east of Spences Bridge). Until Sat Sep 6 at 4:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. Site 12 to 15. Last updated Fri Aug 29 at 1:24 PM PDT. (DBC-80708) |
Highway 8 |
Highway 8. Construction work between the start of Highway 8 and 14 Mile Ranch Rd for 2.7 km (9 to 12 km east of Spences Bridge). Until Mon Sep 15. Single lane alternating traffic. SITE 9/10. 30-min closures between 10am and 2pm daily. Traffic flushed between closures. Emergency vehicles accommodated. Next update time Mon Sep 15 at 9:00 AM PDT. Last updated Mon Aug 25 at 3:42 PM PDT. (DBC-74796) |
Highway 91A Westbound |
Highway 91A, westbound. Roadside brushing between Boyd St and the start of Highway 91A for 2.0 km (New Westminster). Until Wed Sep 3 at 4:00 AM PDT. Left lane is closed. Watch for traffic control. Vegetation removal. Last updated Wed Sep 3 at 12:16 AM PDT. (DBC-81142) |
Highway 93 Both Directions |
Highway 93, in both directions. Special event planned between Eager Hill-Fort Steele Rd and Kelly Rd for 1.8 km (3 to 1 km south of Fort Steele). Starting Sat Sep 13 at 7:00 AM MDT until Sat Sep 13 at 7:00 PM MDT. 2025 Kootenay Rockies Gran Fondo. Expect delays. Watch for cyclists. Last updated Tue Sep 2 at 3:41 PM MDT. (DBC-81119) |
Highway 93 Both Directions |
Highway 93, in both directions. Special event planned between Kelly Rd and Ft Steele Cemetery Rd for 2.6 km (Fort Steele). Starting Sat Sep 13 at 7:00 AM MDT until Sat Sep 13 at 7:00 PM MDT. 2025 Kootenay Rockies Gran Fondo. Expect delays. Watch for cyclists. Last updated Tue Sep 2 at 3:41 PM MDT. (DBC-81118) |
Highway 93 Both Directions |
Highway 93, in both directions. Special event planned between Moan Rd and Farstad Way for 9.0 km (5 km north of Wasa to 2 km south of Skookumchuck). Starting Sat Sep 13 at 7:00 AM MDT until Sat Sep 13 at 7:00 PM MDT. 2025 Kootenay Rockies Gran Fondo. Expect delays. Watch for cyclists. Last updated Tue Sep 2 at 3:43 PM MDT. (DBC-81122) |
Highway 93 Both Directions |
Highway 93, in both directions. Special event between Kootenay No 3 Rd and Windermere Rd for 14.4 km (1 km north of Fairmont Hot Springs to Windermere). Until Wed Sep 3 at 12:00 PM MDT. Speed reduction in place. Watch for signage. Last updated Thu Aug 28 at 9:38 AM MDT. (DBC-80976) |
Highway 93 Both Directions |
Highway 93, in both directions. Construction work between Radium Hill Rd and Stanley St for 3.1 km (Radium Hot Springs). Until Tue Sep 30. From 6:00 AM to 5:00 PM MDT on weekdays. Southbound shoulder closed. Traffic reduced from 70 km/hr to 50 km/hr 24/7 on weekdays and Saturdays. Last updated Mon Aug 18 at 3:02 PM MDT. (DBC-73931) |
Highway 95A Both Directions |
Highway 95A, in both directions. Special event planned between Collinson Rd and Kennedy Rd for 1.8 km (Cranbrook). Starting Sat Sep 13 at 7:00 AM MDT until Sat Sep 13 at 7:00 PM MDT. 2025 Kootenay Rockies Gran Fondo. Expect delays. Watch for cyclists. Last updated Tue Sep 2 at 3:42 PM MDT. (DBC-81120) |
Highway 95A Both Directions |
Highway 95A, in both directions. Special event planned between Airport Access Rd and Porteous Rd for 7.3 km (3 km south of Kimberley to 1 km north of Cranbrook). Starting Sat Sep 13 at 7:00 AM MDT until Sat Sep 13 at 7:00 PM MDT. 2025 Kootenay Rockies Gran Fondo. Expect delays. Watch for cyclists. Last updated Tue Sep 2 at 3:41 PM MDT. (DBC-81116) |
Highway 95A Both Directions |
Highway 95A, in both directions. Special event planned between Stirton Rd and 317th Ave for 1.0 km (Kimberley). Starting Sat Sep 13 at 7:00 AM MDT until Sat Sep 13 at 7:00 PM MDT. 2025 Kootenay Rockies Gran Fondo. Expect delays. Watch for cyclists. Last updated Tue Sep 2 at 3:41 PM MDT. (DBC-81117) |
Highway 95A |
Highway 95A. Construction work between 305th Ave and 304th Ave (Kimberley). Until Fri Sep 5. From 7:00 AM to 3:30 PM MDT daily. Parking lane closed. Watch for traffic control. Last updated Fri Aug 29 at 9:27 AM MDT. (DBC-81016) |
Highway 97 |
Highway 97. Utility work between Soda Creek Substation and Pinnel Road. Until Wed Sep 3. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic. Please watch for traffic control signage and personnel. Expect minor delays of up to five minutes. Last updated Wed Aug 13 at 2:28 PM PDT. (DBC-80435) |
Highway 97 |
Highway 97. Bridge construction at Tetsa River #1 Bridge. Until Mon Sep 15. From 7:00 AM to 7:00 PM MST daily. Single lane alternating traffic. Tetsa River #1 Substructure Rehabilitation. Width restriction of 3.8m OAW. Last updated Tue Aug 19 at 3:12 PM MST. (DBC-80654) |
Highway 97 |
Highway 97 . Paving operations at Lakeside Motel. Until Sat Sep 6. From 6:00 AM to 6:00 PM PDT daily. Southbound right lane will be closed. Please watch for signage and traffic control personnel. Last updated Mon Aug 25 at 11:12 AM PDT. (DBC-80735) |
Highway 97 Northbound |
Highway 97, northbound. Utility work at 100 Mile House. Until Fri Sep 5 at 5:00 PM PDT. Lane Closure. Slow down and obey all traffic control personnel and signage. Delays of 5 minutes. Last updated Tue Aug 26 at 8:56 AM PDT. (DBC-80883) |
Highway 97 Both Directions |
Highway 97, in both directions. Shoulder maintenance between 100th Ave and 13th Ave for 40.1 km (Okanagan Falls to 1 km north of Osoyoos). Until Wed Oct 1 at 5:00 PM PDT. Mowing. Watch for slow moving vehicles. Last updated Tue Sep 2 at 6:04 AM PDT. (DBC-81088) |
Highway 97 Northbound |
Highway 97, northbound. Road construction work between Pineview Dr and Sandhill Rd (1 km south of Penticton). Until Wed Oct 29. From 7:00 AM to 5:00 PM PDT on weekdays. Lane Closure. Shoulder closed. Highway extension work. Constructing new intersection and installing new traffic lights. Last updated Mon Aug 11 at 4:45 PM PDT. (DBC-71783) |
Highway 97 Southbound |
Highway 97, southbound. Road maintenance work between Sage Mesa Dr and Green Lake Rd for 22.0 km (Okanagan Falls to 2 km north of Penticton). From 7:30 AM to 4:30 PM PDT on Wednesday and Thursday. Right lane will be closed. Watch for crew & equipment. Use caution & reduce speed when passing. Last updated Mon Aug 25 at 11:14 AM PDT. (DBC-80142) |
Highway 97 Both Directions |
Highway 97, in both directions. There is a wildfire between Hardy St and Renfrew Rd for 2.1 km (Peachland). Watch for crews and equipment working. Last updated Wed Sep 3 at 1:19 AM PDT. (DBC-80931) |
Highway 97 Westbound |
Highway 97, westbound. Tree pruning between Duck Range Rd and Monte Creek for 5.6 km (Monte Creek). Until Fri Sep 5 at 4:00 PM PDT. Right lane closed. Last updated Thu Aug 14 at 2:20 PM PDT. (DBC-80486) |
Highway 97 |
Highway 97 (Cariboo Connector). Utility work planned between Stephenson Rd and Stage Rd for 0.2 km (Cache Creek). Starting Wed Sep 10 at 8:00 AM PDT until Wed Sep 10 at 4:00 PM PDT. Shoulder will be closed. Please watch for traffic control signage and personnel. Expect minor delays of up to five minutes. Last updated Tue Sep 2 at 10:52 AM PDT. (DBC-81101) |
Highway 97 Northbound |
Highway 97 (Cariboo Connector), northbound. Utility work between Scottie Creek Rd and Loon Lake Rd for 2.5 km (17 km south of Clinton to 18 km north of Cache Creek). Until Tue Sep 16. From 8:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic. Please watch for traffic control. Expect minor delays of up to five minutes. Last updated Mon Aug 25 at 11:41 AM PDT. (DBC-80856) |
Highway 97 Southbound |
Highway 97 (Cariboo Connector), southbound. Vehicle incident between Meadow Lake Rd and Chasm Rd for 1.4 km (13 km north of Clinton to 14 km south of 70 Mile House). Single lane alternating traffic. Last updated Wed Sep 3 at 1:19 AM PDT. (DBC-81066) |
Highway 97 |
Highway 97 (Cariboo Connector). Utility work between Canim-Hendrix Lake Rd and Dawson Rd for 5.3 km (100 Mile House). Until Wed Sep 3. From 8:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic. Please watch for traffic control. Expect minor delays of up to five minutes. Last updated Mon Aug 25 at 11:38 AM PDT. (DBC-80854) |
Highway 97 |
Highway 97 (Cariboo Connector). Utility work planned between Clear Rd N and Kragbak Rd for 7.7 km (Wildwood). Starting Thu Sep 11 until Thu Oct 9. From 8:00 AM to 4:00 PM PDT on weekdays. Please watch for traffic control signage and personnel. Expect minor delays of up to five minutes. Shoulder lane will be closed. Last updated Tue Sep 2 at 11:06 AM PDT. (DBC-81102) |
Highway 97 Northbound |
Highway 97 (Cariboo Connector), northbound. Shoulder maintenance between Ewing Rd and Carver Rd for 2.4 km (11 to 9 km north of Hixon). Until Sat Sep 6 at 8:00 PM PDT. From 6:00 AM to 8:00 PM PDT on weekends, Monday, Wednesday, Thursday and Friday. Speed reduction of 70km/h as required. Last updated Tue Aug 5 at 12:20 PM PDT. (DBC-80111) |
Highway 97 |
Highway 97 (Cariboo Connector). Utility work between Ewing Rd and Kolling Rd for 9.1 km (18 to 9 km north of Hixon). Until Sat Sep 6. From 6:00 AM to 8:00 PM PDT daily. Please watch for personnel and obey all signage. Speed reductions of 70 km/hour. Last updated Fri Aug 8 at 9:31 AM PDT. (DBC-79907) |
Highway 97 |
Highway 97 (Cariboo Connector). Rest area closed between Charles Rd and Anderson Rd (15 km south of Pineview). Next update time Tue Sep 30 at 10:00 AM PDT. Last updated Mon Jun 30 at 10:04 AM PDT. (DBC-71474) |
Highway 97 Both Directions |
Highway 97 (Cariboo Connector), in both directions. Paving operations between Sintich Rd E and Ferry Ave for 5.3 km (Prince George). Until Wed Sep 10. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Watch for traffic control. Expect delays. Additional paving on Sintich Rd, Johnson Rd, and Old Cariboo Hwy. Last updated Sat Jul 26 at 8:12 PM PDT. (DBC-79761) |
Highway 97 |
Highway 97. Utility work planned between Noranda Rd and Collins Rd for 0.6 km (Prince George). Starting Wed Sep 17 at 6:00 AM PDT until Sat Sep 20 at 6:00 PM PDT. Right lane will be closed. Last updated Tue Aug 5 at 8:12 AM PDT. (DBC-80093) |
Highway 97 Both Directions |
Highway 97, in both directions. Paving operations between Austin Rd and Nordic Dr for 0.2 km (Prince George). Until Fri Sep 5 at 6:00 PM PDT. Right turn lane closed. Left turn lane closed. Closing right and left turn lanes off Highway 97 to Handlen Road. Last updated Thu Aug 21 at 1:49 PM PDT. (DBC-80736) |
Highway 97 Southbound |
Highway 97, southbound. Utility work between Nordic Dr and Austin Rd for 0.7 km (Prince George). Until Fri Sep 5 at 6:00 AM PDT. Right turn lane closed. Last updated Tue Aug 19 at 11:00 AM PDT. (DBC-80644) |
Highway 97 Both Directions |
Highway 97, in both directions. Bridge construction between Wright Creek Rd and Kinney Rd for 0.5 km (8 to 7 km north of Prince George). Until Sat Nov 15. Single lane alternating traffic. Last updated Tue Apr 15 at 3:44 PM PDT. (DBC-75426) |
Highway 97 |
Highway 97. Road construction work planned between Azu Sub Rd and Powder King Rd (4 km south of Pine Pass Summit). Starting Wed Sep 3 at 6:00 AM PDT until Sun Sep 7 at 6:00 PM PDT. Roadway will be reduced to one lane. Slow down while passing the work zone, follow all traffic control direction. Last updated Tue Sep 2 at 10:26 AM PDT. (DBC-81094) |
Highway 97 |
Highway 97. Utility work between Powder King Rd and Old Hasler Rd for 26.5 km (Pine Pass Summit). Until Tue Sep 30. From 7:00 AM to 7:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. Last updated Fri Aug 22 at 10:38 AM PDT. (DBC-80768) |
Highway 97A |
Highway 97A. Bridge maintenance between 2nd Ave and Enderby Grindrod Rd for 0.1 km (10 to 9 km north of Enderby). Until Thu Sep 4. From 9:00 AM to 3:00 PM PDT on Tuesday, Wednesday and Thursday. Single lane alternating traffic. Watch for traffic control. Last updated Mon Aug 25 at 3:40 PM PDT. (DBC-80478) |
Highway 97A |
Highway 97A. Maintenance planned between Hutchison Rd and Davidson Dr for 4.7 km (6 to 10 km south of Sicamous). Starting Wed Sep 10 until Thu Sep 11. From 8:00 AM to 4:00 PM PDT on Wednesday and Thursday. Single lane alternating traffic will be in effect. Last updated Tue Sep 2 at 10:13 AM PDT. (DBC-81099) |
Highway 97C Both Directions |
Highway 97C (Okanagan Connector), in both directions. Maintenance planned between Brenda Mine Rd and Pennask Summit (2 km east of Pennask Summit). Starting Tue Sep 9 until Tue Sep 23. From 7:00 AM to 5:00 PM PDT on weekdays. Centre lane will be closed in both directions. Watch for traffic control personnel. Last updated Tue Sep 2 at 12:58 PM PDT. (DBC-81106) |
Highway 99 Northbound |
Highway 99, northbound. Road maintenance work planned between 112 St and Exit 26 for 5.1 km (Delta). Starting Mon Sep 8 until Fri Oct 3. From 12:00 AM to 12:00 PM PDT on weekdays. Watch for traffic control personnel. Last updated Wed Aug 27 at 2:34 PM PDT. (DBC-80945) |
Highway 99 Both Directions |
Highway 99, in both directions. Utility work between Exit 20 and Exit 28 for 3.4 km (Delta). Until Sat Sep 6. From 8:00 AM to 6:00 AM PDT daily. No traffic control or lane closures. Last updated Fri Aug 8 at 9:38 AM PDT. (DBC-80222) |
Highway 99 Both Directions |
Highway 99, in both directions. Construction work at Exit 32: Steveston Hwy (Richmond). Until Sat Sep 6 at 5:30 AM PDT. Watch for traffic control. Periods of lane shifts and left turn restrictions. Plan for additional travel time through the detours and consider using alternate exits where possible. Last updated Tue Sep 2 at 10:38 AM PDT. (DBC-81100) |
Highway 99 Northbound |
Highway 99, northbound. Utility work planned between Denman St and Lost Lagoon Rd for 0.5 km (Vancouver). Starting Tue Sep 9 at 10:00 PM PDT until Wed Sep 10 at 5:00 AM PDT. Right lane will be blocked. Last updated Thu Aug 28 at 6:00 PM PDT. (DBC-80999) |
Highway 99 Northbound |
Highway 99, northbound. Road construction work planned at Keith Rd (West Vancouver). Starting Tue Sep 16 at 8:30 PM PDT until Tue Sep 16 at 11:30 PM PDT. Lane Closure. Watch for traffic control personnel. Last updated Tue Aug 26 at 4:58 PM PDT. (DBC-80904) |
Highway 99 Northbound |
Highway 99, northbound. Road sweeping between Brunswick Beach Rd and Stawamus Rd for 28.0 km (1 km north of Lions Bay to Squamish). Until Wed Sep 3 at 5:00 AM PDT. Left lane is blocked. Watch for traffic control. Last updated Tue Sep 2 at 10:48 PM PDT. (DBC-81141) |
Highway 99 Both Directions |
Highway 99, in both directions. Utility work at Scott Cres (Squamish). Until Tue Sep 30 at 4:00 PM PDT. Right turn lane closed. Last updated Mon Aug 18 at 2:47 PM PDT. (DBC-80603) |
Highway 99 Northbound |
Highway 99, northbound. Paving operations planned between Alice Lake Rd and Daisy Lake Rd for 3.4 km (Squamish). Starting Wed Sep 3 at 4:00 AM PDT until Wed Sep 3 at 6:00 PM PDT. Right lane will be closed. Last updated Fri Aug 29 at 2:57 PM PDT. (DBC-81031) |
Highway 99 Northbound |
Highway 99, northbound. Paving operations planned between Alice Lake Rd and Daisy Lake Rd for 3.3 km (Squamish). Starting Thu Sep 4 at 4:00 AM PDT until Thu Sep 4 at 6:00 PM PDT. Left lane will be closed. Last updated Fri Aug 29 at 2:57 PM PDT. (DBC-81032) |
Highway 99 Both Directions |
Highway 99, in both directions. Road maintenance work between Lil'wat Pl and Seton Lake Rd (14 km south of Lillooet). Until Sat Sep 6. From 7:00 AM to 7:00 PM PDT on Wednesday, Thursday, Friday and Saturday. Watch for traffic control. Last updated Fri Aug 29 at 2:23 PM PDT. (DBC-81028) |
Highway 99 |
Highway 99. Utility work between Hat Creek Rd and Old Cariboo Rd for 19.7 km (70 to 50 km north of Lillooet). Until Tue Sep 30. From 7:00 AM to 6:00 PM PDT on weekdays. Single lane alternating traffic. Please watch for traffic control personnel and crews working. Expect minor delays of up to five minutes. Last updated Mon Aug 11 at 9:59 AM PDT. (DBC-80308) |
Highway 99A Northbound |
Highway 99A, northbound. Paving operations planned between 58A Ave and 144A St 1 km north of Surrey. Starting Sun Sep 7 until Fri Sep 12. From 8:00 PM to 6:00 AM PDT daily. Lane Closure. Last updated Thu Aug 28 at 9:38 AM PDT. (DBC-80978) |
Little Fort Ferry Both Directions |
Little Fort Ferry, in both directions. Maintenance planned between the start of Little Fort Ferry and the end of Little Fort Ferry for 0.1 km (Little Fort). Starting Wed Sep 3 at 7:00 AM PDT until Thu Sep 4 at 4:30 PM PDT. From 7:00 AM to 4:30 PM PDT on Wednesday and Thursday. Intermittent short ferry closres for maintenance. Please call Argo Road Maintenance for more information. Last updated Wed Aug 27 at 4:37 PM PDT. (DBC-80952) |
McLure Ferry Both Directions |
McLure Ferry, in both directions. Maintenance planned between McLure Ferry and the end of McLure Ferry for 0.1 km (McLure). Starting Wed Sep 3 at 7:00 AM PDT until Thu Sep 4 at 4:30 PM PDT. From 7:00 AM to 4:30 PM PDT on Wednesday and Thursday. Intermittent short ferry closures for maintenance. For more information, please call Argo Road Maintenance. Last updated Wed Aug 27 at 4:39 PM PDT. (DBC-80951) |
Nisga'a Hwy |
Nisga'a Hwy (Highway 113). Road construction work between Dump Rd and Spruce Dr for 28.0 km (Laxgalts'ap to 1 km east of Gingolx). Until Mon Sep 15 at 5:00 PM PDT. Single lane alternating traffic. Last updated Mon Aug 25 at 10:40 AM PDT. (DBC-80587) |
Other Roads |
Old Alaska Highway. Geotechnical investigation at Kiskatinaw Curved Bridge 30 km north of Dawson Creek. Bridge is closed. Slide impacting bridge structure, assessment underway. Next update time Fri Jan 2, 2026 at 10:00 AM MST. Last updated Wed Jul 2 at 10:05 AM MST. (DBC-30093) |
Other Roads Both Directions |
Fulford Ganges Road, in both directions. Road construction work between Seaview Avenue and Cranberry Road. From 7:00 AM to 5:00 PM PDT on weekdays and Sunday. Single lane alternating traffic. No work on long weekends. Next update time Fri Sep 12 at 5:00 PM PDT. Last updated Fri Aug 15 at 1:33 PM PDT. (DBC-68621) |
Other Roads Both Directions |
Colleymount Rd, in both directions. Washout at 53.5km near Burns Lake. Single lane alternating traffic. Partial road washout, obey signage. Next update time Fri Sep 26 at 10:00 AM PDT. Last updated Fri Aug 29 at 9:47 AM PDT. (DBC-71008) |
Other Roads Both Directions |
Kitsuksis Rd., in both directions. Utility work between Short st. And Spruce St. Until Fri Oct 31 at 5:00 PM PDT. Single lane alternating traffic. Expect minor delays. Watch for traffic control. Watermain installation. Last updated Mon Jun 30 at 8:23 AM PDT. (DBC-73760) |
Other Roads Both Directions |
Boys Rd, in both directions. Utility work between Highway 1 and Mission Rd. Until Fri Oct 31. From 7:00 AM to 7:00 PM PDT daily. Shoulder closed. Last updated Thu Jun 12 at 12:11 PM PDT. (DBC-77927) |
Other Roads Eastbound |
Marine Dr, eastbound. Road construction work between Highway 99 and Capilano Rd in North Vancouver - District. Until Wed Oct 15 at 8:00 PM PDT. From 9:00 AM to 5:00 PM PDT on Saturday and from 7:00 AM to 8:00 PM PDT on weekdays. Right lane closed. Shoulder closed. Lane closure to remain overnight. No work on Sundays or holidays. Last updated Fri Aug 29 at 4:17 PM PDT. (DBC-78434) |
Other Roads Both Directions |
Carolin Mine Rd, in both directions. Construction work between Siwash Creek Rd and Shylock Rd. Until Fri Sep 12 at 6:00 PM PDT. Road closed. Construction/Rehabilitation work of Exit 195/Carolin Mine Rd between Siwash Creek Rd and Shylock Rd. Last updated Mon Jul 14 at 3:00 PM PDT. (DBC-79224) |
Other Roads Both Directions |
Ladner Trunk Rd, in both directions. Construction work between 61 St and 62 St. Until Fri Sep 12. From 7:00 AM to 3:00 PM PDT daily. Lane Closure. Watch for traffic control. Last updated Thu Jul 24 at 11:38 AM PDT. (DBC-79693) |
Other Roads Southbound |
Mountain Hwy, southbound. Utility work between Oxford Street and Main Street in North Vancouver - City. Until Mon Sep 8. From 7:00 PM to 6:00 AM PDT daily. Last updated Mon Jul 28 at 9:42 AM PDT. (DBC-79801) |
Other Roads Both Directions |
Shuswap Road, in both directions. Construction work between Sun Rivers Drive and Harper Ranch Pinantan near Kamloops. Until Tue Sep 30 at 5:00 PM PDT. Single lane alternating traffic. Expect minor delays. Last updated Mon Jul 28 at 3:37 PM PDT. (DBC-79824) |
Other Roads Southbound |
Erickson Rd, southbound. Utility work between 11 Ave S and 16 Ave S in Creston. Until Sat Sep 20. From 7:00 AM to 5:00 PM PDT on weekdays. Watch for traffic control. Expect delays. Last updated Wed Jul 30 at 12:46 PM PDT. (DBC-79911) |
Other Roads Both Directions |
Holden Corso Rd, in both directions. Utility work between Rugg Rd and Barnes Rd. Until Fri Oct 31 at 5:00 PM PDT. Single lane alternating traffic. Expect delays. Watch for traffic control. Watermain and Road works. Watch for work crews. Last updated Wed Jul 30 at 2:59 PM PDT. (DBC-79923) |
Other Roads Both Directions |
Fraser Hwy, in both directions. Construction work at Hwy 10 in Langley - City. Until Fri Jan 30, 2026 at 8:00 PM PDT. Fraser Hwy left turn lane onto Hwy 10 closed in both directions. Last updated Tue Aug 5 at 9:37 AM PDT. (DBC-80099) |
Other Roads Both Directions |
Lochside Dr, in both directions. Utility work between Captains Walk and Ocean Avenue. Until Fri Nov 21. From 6:00 AM to 6:00 PM PDT daily. Single lane alternating traffic. Watch for traffic control. Last updated Thu Aug 7 at 4:21 PM PDT. (DBC-80205) |
Other Roads |
Chopaka Rd. Maintenance at Henry Cres. Until Wed Sep 10. From 7:00 AM to 5:00 PM PDT daily. Single lane alternating traffic. Lane Closure. Detour in effect. Expect minor delays. Culvert Replacement - Two Locations Single Lane Alternating Traffic in effect during work hours.
Lane Closure, yield to oncoming traffic in effect outside of working hours. Last updated Wed Aug 20 at 8:23 AM PDT. (DBC-80365) |
Other Roads |
Iron Mtn Road. Road construction work between Start and 3K. Until Thu Sep 3, 2026. From 7:00 AM to 3:30 PM PDT on Monday, Tuesday, Wednesday and Thursday. Expect minor delays. Last updated Thu Aug 21 at 8:12 AM PDT. (DBC-80398) |
Other Roads Both Directions |
Fulford Ganges Road, in both directions. Bridge construction between Blackburn Rd and Horel Rd. From 7:00 AM to 5:00 PM PDT on weekdays. Construction speed zone in effect. Watch for traffic control. Next update time Mon Sep 8 at 3:00 PM PDT. Last updated Mon Aug 18 at 12:55 PM PDT. (DBC-80598) |
Other Roads |
Summers Creek Rd. Bridge maintenance planned between 17km and 17km. Starting Mon Sep 8 until Thu Sep 18. From 8:00 AM to 5:00 PM PDT on Monday, Tuesday, Wednesday and Thursday. Bridge will be closed. Detour will not be available. Bridge will be fully open outside of working hours. Procedures in place to accommodate emergency personnel during closures. Last updated Tue Aug 19 at 10:33 AM PDT. (DBC-80642) |
Other Roads |
Leighton Lane. Utility work between Lundy Lane and Williams Place. Until Fri Sep 5. From 9:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Last updated Thu Aug 21 at 8:57 AM PDT. (DBC-80718) |
Other Roads Both Directions |
Main Rd, in both directions. Utility work planned between Peninsula Rd and Helen Rd. Starting Wed Sep 3 at 7:00 AM PDT until Wed Sep 3 at 5:00 PM PDT. Road closure planned. Detour planned. Expect minor delays. Watch for traffic control personnel. Water pipe install. Watch for work crews. Last updated Mon Aug 25 at 8:42 AM PDT. (DBC-80737) |
Other Roads Both Directions |
Mission Mtn Rd, in both directions. Maintenance between Road 40 and Shalath 48 km west of Lillooet. Until Fri Sep 26 at 4:00 PM PDT. From 7:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic. Expect 20 Minute Delays between Gabiens and surge road entrance. Watch for equipment and crews working. Last updated Fri Aug 22 at 10:26 AM PDT. (DBC-80766) |
Other Roads |
Laidlaw Road. Utility work planned between Francher Road and Dent Road near Hope. Starting Tue Sep 9 until Fri Sep 19. From 9:00 AM to 4:00 PM PDT on weekdays. Lane Closure. Last updated Mon Aug 25 at 11:09 AM PDT. (DBC-80849) |
Other Roads Westbound |
Dollarton Hwy On-ramp, westbound. Maintenance planned between Highway 1 and Seymour Blvd in North Vancouver - District. Starting Tue Sep 9 at 10:00 AM PDT until Wed Sep 10 at 3:00 PM PDT. Right lane of entrance ramp closed. Pass with caution and watch for crews. Last updated Fri Aug 29 at 12:10 PM PDT. (DBC-81021) |
Other Roads Both Directions |
Sun Peaks Rd, in both directions. Road construction work between Cahilty Cres and Sun Peaks Municipal Boundary. Until Wed Sep 10. From 6:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Last updated Fri Aug 29 at 1:23 PM PDT. (DBC-81026) |
Other Roads Both Directions |
Airport Access Road, in both directions. Special event planned between Carlisle Rd and Canadian Rockies International Airport. Starting Sat Sep 13 at 7:00 AM MDT until Sat Sep 13 at 7:00 PM MDT. 2025 Kootenay Rockies Gran Fondo. Expect delays. Watch for cyclists. Last updated Tue Sep 2 at 3:42 PM MDT. (DBC-81121) |
Other Roads Both Directions |
Beaver Valley Rd, in both directions. Maintenance between George Lake and McCauley Lake near Horsefly. Until Fri Sep 5. From 8:00 AM to 12:00 PM PDT on Wednesday, Thursday and Friday. Road closed. Cattle guard replacement will be taking place. Wednesday 8km from Likely Rd, Thursday 12 km from Likely Rd, Friday 14 km from Likely Rd. Last updated Tue Sep 2 at 3:53 PM PDT. (DBC-81130) |
Upper Arrow Lake Ferry |
Upper Arrow Lake Ferry. Departure delayed between Shelter Bay and Galena Bay. From 8:45 AM to 11:00 AM PST on Wednesday. Departure delayed every Wednesday for fueling purposes. Next update time Wed Dec 31 at 10:00 AM PST. Last updated Tue Jan 7 at 12:16 PM PST. (DBC-71712) |
Usk Ferry |
Usk Ferry. Ferry is currently out of service between Usk Ferry and the end of Usk Ferry (Usk). Due to low river level. Cable car in service. Last updated Thu Aug 28 at 5:18 PM PDT. (DBC-80996) |