• All Events
  • Harrop Ferry Harrop Ferry. Ferry will be out of service at Harrop Ferry. Starting Sun May 25 at 11:45 PM PDT until Mon May 26 at 2:00 AM PDT. Due to required maintenance. Next update time Mon May 26 at 2:00 AM PDT. Last updated Sun May 25 at 2:39 PM PDT. (DBC-77003)
    Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Vehicle incident between Westport Rd and Exit 4: Headland Dr (West Vancouver). Lane Closure. Expect delays. Next update time Sun May 25 at 3:30 PM PDT. Last updated Sun May 25 at 3:02 PM PDT. (DBC-77054)
    Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Industrial traffic may slow or block regular traffic. Between Exit 37: Gaglardi Way and Exit 40: Brunette Ave for 3.2 km (Burnaby to Coquitlam). Starting Fri Jun 6 at 9:30 PM PDT until Sat Jun 7 at 7:00 AM PDT. Lane Closure. Loading of material to and from Millennium Line for project. Next update time Sat Jun 7 at 7:00 AM PDT. Last updated Fri May 23 at 9:12 PM PDT. (DBC-76898)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Construction work at Exit 73 (Langley - District). Until Wed Dec 31 at 7:00 AM PDT. Exit ramp is closed. Current Westbound off-ramp loop will be closed. A new off-ramp will be opened before the overpass. The traveling public will exit the highway and turn left or right onto 264th Street. Next update time Wed Dec 31 at 7:00 AM PDT. Last updated Thu May 22 at 2:58 PM PDT. (DBC-76914)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work at Exit 165: Flood Rd (Hope). Lane Closure. Exit ramp is closed. Expect delays. Eastbound exit 165 closed, use exit 168. Next update time Fri May 30 at 9:00 AM PDT. Last updated Fri May 9 at 9:28 AM PDT. (DBC-73987)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Road construction work between Gladwin Rd and Nicomen River Rd for 1.1 km (10 to 11 km east of Lytton). From 7:00 AM to 5:30 PM PDT daily. Single lane alternating traffic. Expect up to 40 minute delays due to railway crossing and construction activities. Closure in effect May 28 and 29 7:00pm-5:00am. Next update time Mon Sep 15 at 10:00 AM PDT. Last updated Sat May 24 at 10:24 AM PDT. (DBC-75637)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Coburn St and Shuswap Ave for 0.7 km (Chase). From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. May 13 - Aug 16 7am-5pm Monday to Saturday 60km/h. 80km/h outside construction hours. Watch for traffic control. Next update time Sat Aug 16 at 10:00 AM PDT. Last updated Sun May 18 at 2:19 PM PDT. (DBC-64961)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Ford Rd and Bolton Rd for 4.5 km (Tappen). Until Wed Dec 31. From 7:00 AM to 5:00 PM PST on weekdays and Saturday. Expect up to 20 min delays. Reduced speed through work zone to 60 km/hr. Intermittent minor stoppages and single lane alternating traffic. Watch for traffic control. Next update time Mon Dec 1 at 9:00 AM PST. Last updated Thu Feb 27 at 1:35 PM PST. (DBC-72306)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Blasting between Tappen Beach Rd and 65 Ave NW for 2.6 km (Salmon Arm to 2 km east of Tappen). Until Sat May 31. From 7:00 AM to 5:00 PM PST on weekdays and Saturday. 20 minute closure at 1 PM. Intermittent 5 minute closures and single lane alternating traffic may be required. Next update time Mon May 26 at 9:00 AM PST. Last updated Thu Feb 27 at 1:27 PM PST. (DBC-72305)
    Highway 1 Highway 1 (TransCanada Highway). Construction work between Old Sicamous Rd and Solsqua-Sicamous Rd for 2.0 km (Sicamous). From 9:00 AM to 3:00 PM PDT on weekdays and Saturday. Road closed. Alternate route Hwy 97A and 97B. No closure on Wednesday, May 28. Single lane alternating traffic nightly 8P-6AM Mon-Sat. Next update time Sun Jun 1 at 12:00 PM PDT. Last updated Sun May 25 at 10:46 AM PDT. (DBC-70490)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Illecillewaet Brake Check and MacDonald Snowshed for 3.0 km (5 to 2 km west of West Boundary of Glacier National Park). Travelers should expect 30 min closures 7PM-8AM and 2 hour closures 230am-430am, Mon to Sun morning. Stoppages at any time. Next update time Sun Jun 29 at 12:00 PM PDT. Last updated Wed May 21 at 10:49 PM PDT. (DBC-73974)
    Highway 13 Southbound Highway 13, southbound. Construction work between the end of Highway 13 and 52 Ave for 0.9 km (Langley - District). Until Thu Jul 31. Entrance ramp closed. Eastbound Highway 1 entrance loop is closed. Eastbound exit ramp from Highway 1 onto 264th is open. Through lane after the exit loop is closed. In effect 24/7. Next update time Thu Jul 31 at 12:00 PM PDT. Last updated Sun Apr 13 at 6:26 AM PDT. (DBC-74478)
    Highway 17 Both Directions Highway 17 (Patricia Bay Highway), in both directions. Construction work at Exit 18: Keating Cross Rd (Central Saanich). Until Fri Aug 1. Nighttime lane closures both directions. Access to Barbara Drive from Keating Cross Road and access to East Saanich, Martindale and Danica from Highway 17 permanently closed. Keating Cross Road southbound onramp to Highway 17 closed. Next update time Tue Jul 15 at 12:00 PM PDT. Last updated Tue Mar 11 at 7:06 AM PDT. (DBC-54341)
    Other Roads Kersley-Dale Landing Rd. Landslide at 500 metres in from Highway 97 Intersection. Road closed. A temporary Single Lane Gravel Road for Local Traffic via Arnoldus Road. Next update time Tue Apr 14, 2026 at 9:00 AM PDT. Last updated Mon Apr 14 at 9:09 AM PDT. (DBC-23443)
    Other Roads Both Directions Durrell Road, in both directions. Landslide at 700m from Highway 97. Road closed. Detour in effect. Detour available via Highway 97 and Dale Lake Road. Next update time Wed Oct 22 at 2:00 PM PDT. Last updated Wed Apr 23 at 3:19 PM PDT. (DBC-27390)
    Other Roads Both Directions Quesnel-Hixon Road, in both directions. Landslide at Cottonwood bridge. Road closed. Next update time Fri Apr 17, 2026 at 2:00 PM PDT. Last updated Thu Apr 17 at 3:40 PM PDT. (DBC-28386)
    Other Roads Johnston Bridge. Travel advisory in effect at Front St. In Quesnel. Johnston Bridge. Bridge is open to vehicles with gross vehicle weight rating of 10,000 kilograms or lower. Industrial traffic and heavy commercial traffic must detour via Plywood Rd and Maple Drive. Industrial traffic is not allowed to detour through Johnston Subdivision. Next update time Wed Apr 8, 2026 at 9:00 AM PDT. Last updated Thu Oct 17 at 6:39 AM PDT. (DBC-47311)
    Other Roads Both Directions McKay Road, in both directions. Flooding at McKay Road. Road closed. Next update time Thu Apr 9, 2026 at 9:00 AM PDT. Last updated Thu Apr 10 at 9:28 AM PDT. (DBC-53013)
    Other Roads Both Directions Canal Rd, in both directions. Construction work at Mt Norman Access Rd. Watch for traffic control. Expect delays. Full closures10am-2pm. Single lane alternating traffic will be in place outside of these hours. Next update time Mon May 26 at 9:00 AM PDT. Last updated Tue May 20 at 9:09 AM PDT. (DBC-61149)
    Other Roads Both Directions Cave Road, in both directions. Landslide at Cave Road. Road closed. Landslide on Cave Road. Next update time Wed Apr 8, 2026 at 10:00 AM PDT. Last updated Wed Apr 9 at 10:42 PM PDT. (DBC-67913)
    Atlin Hwy Atlin Hwy. Frost heaves between Discovery Ave and Yukon Border for 50.8 km (Atlin to British Columbia and Yukon Border). Last updated Sun May 25 at 6:50 AM PDT. (DBCRCON-223121)
    Blackwater Rd Both Directions Blackwater Rd, in both directions. Road construction work between West Lake Rd and Dayton FSR. Until Fri May 30 at 5:00 PM PDT. Road closed for repairs. Detour in effect. Last updated Tue May 13 at 1:27 PM PDT. (DBC-76587)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Utility work planned between Roderick St and Culduthel Rd for 0.6 km (Saanich). Starting Mon Jul 7 at 10:00 PM PST until Tue Sep 30 at 5:00 AM PST. Right lane will be closed. Left lane will be closed. Expect minor delays. Watch for traffic control personnel. Last updated Wed Feb 19 at 11:59 AM PST. (DBC-72994)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Tillicum Rd and Exit 6: McKenzie Ave for 1.1 km (Saanich). Until Wed Dec 24, 2025. From 8:00 PM to 5:30 AM PST on weekdays and Sunday. Lane closures in both directions in effect. Traffic reduced to single lane both directions. Maximum width 4m. No maximum height change. Speed limit 50km/h. Last updated Fri Dec 20 at 9:03 AM PST. (DBC-71006)
    Highway 1 Highway 1 (TransCanada Highway). Road construction work between Exit 6: McKenzie Ave and Exit 10: Burnside Rd W for 3.8 km (View Royal to Saanich). Construction work at Colwood Interchange, Helmcken Interchange, and McKenzie Interchange until Fall 2027. Expect speed changes, traffic pattern changes, and overnight work. Next update time Fri Jun 13 at 10:00 AM PDT. Last updated Tue Mar 25 at 4:46 PM PDT. (DBC-73856)
    Highway 1 Southbound Highway 1 (TransCanada Highway), southbound. Utility work planned between Shawnigan-Mill Bay Rd and Butterfield Rd for 3.5 km (Mill Bay). Starting Wed May 28 at 8:00 AM PDT until Wed May 28 at 4:00 PM PDT. Shoulder will be closed. Last updated Thu May 15 at 11:06 AM PDT. (DBC-76679)
    Highway 1 Highway 1 (TransCanada Highway). Utility work between Trunk Rd and York Rd for 0.6 km (Duncan). Until Sat Jun 14 at 4:00 PM PDT. Coronation Avenue bike lanes project. Work is on Coronation Avenue. Last updated Mon May 5 at 7:25 AM PDT. (DBC-74880)
    Highway 1 Highway 1 (TransCanada Highway). Utility work planned between Somenos Rd and Mt Sicker Rd for 1.5 km (2 to 4 km south of Chemainus). Starting Wed May 28 at 8:30 AM PDT until Wed May 28 at 3:30 PM PDT. Lane will be blocked. Last updated Thu May 15 at 10:08 AM PDT. (DBC-76672)
    Highway 1 Northbound Highway 1 (TransCanada Highway), northbound. Construction work between Finlayson St and Nicol St for 0.3 km (Nanaimo). Until Thu May 29 at 3:00 PM PDT. Right lane closed. Expect minor delays. Watch for traffic control. Construction work - Highway 1 Northbound between Crace St. And Esplanade. Right lane closed. Watch for work crews. Last updated Mon Apr 21 at 11:59 AM PDT. (DBC-70846)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Tree pruning planned between Dawes St and Chestnut St for 1.7 km (Nanaimo). Starting Tue May 27 at 9:00 AM PDT until Fri May 30 at 3:00 PM PDT. Right lane will be closed. Expect minor delays. Watch for traffic control personnel. Watch for work crews. Last updated Thu May 22 at 11:53 AM PDT. (DBC-76958)
    Highway 1 Highway 1 (TransCanada Highway). Bridge maintenance planned at Exit 2: Eagleridge Dr (West Vancouver). Starting Wed May 28 at 10:00 PM PDT until Thu May 29 at 5:00 AM PDT. Right lane will be blocked. Left lane will be blocked. Watch for traffic control personnel. Overpass washing. Last updated Fri May 23 at 5:05 PM PDT. (DBC-77022)
    Highway 1 Highway 1 (TransCanada Highway). Bridge maintenance between Exit 3 and Westport Rd (West Vancouver). Until Tue May 27 at 5:00 AM PDT. From 10:00 PM to 5:00 AM PDT on Sunday and Monday. Right lane closed. Bridge Washing. Westbound work: May 25th 10 PM to 5 AM. Eastbound work: May 26th 10 PM to 5 AM. Last updated Fri May 23 at 5:18 PM PDT. (DBC-77020)
    Highway 1 Highway 1 (TransCanada Highway). Bridge maintenance planned between Exit 4: Headland Dr and Almondel Rd (West Vancouver). Starting Thu May 29 at 10:00 PM PDT until Fri May 30 at 5:00 AM PDT. Right lane will be blocked. Left lane will be blocked. Watch for traffic control personnel. Overpass washing. Last updated Fri May 23 at 5:14 PM PDT. (DBC-77023)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Road construction work between 216th St and Exit 73 for 9.3 km (Langley - District). Until Mon Jun 30. From 8:30 PM to 8:00 AM PDT on weekends and from 8:30 PM to 5:30 AM PDT on weekdays. Night time construction work. Lane closures in both directions in effect. No work on long weekends. Last updated Fri May 23 at 11:09 PM PDT. (DBC-74277)
    Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Road construction work at Exit 73 (Langley - District). Until Sat May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT on weekdays and Saturday. Shoulder maintenance. Exit ramp work on shoulder. Last updated Tue Apr 1 at 4:32 PM PDT. (DBC-74748)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Maintenance at Exit 73 (Langley - District). Until Sat May 31 at 7:00 AM PDT. From 9:00 PM to 7:00 AM PDT on Saturday and from 9:00 PM to 5:30 AM PDT on weekdays. Shoulder closed. Last updated Tue Apr 1 at 4:43 PM PDT. (DBC-74751)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Rest area closed at Bradner Rd (Abbotsford). Construction work. For more information on the closure, please refer to Highway 1 Project page: gov.Bc.Ca/264toHighway11#bradner. Next update time Sat Jul 26, 2025 at 9:00 AM PDT. Last updated Thu Sep 26 at 7:34 PM PDT. (DBC-66582)
    Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Maintenance planned between Exit 120: Young Rd and Gibson Rd Uturn for 3.2 km (Chilliwack). Starting Wed May 28 until Thu May 29 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on Wednesday and Thursday. Right lane will be blocked. Last updated Fri May 23 at 4:19 PM PDT. (DBC-77014)
    Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Maintenance planned between Exit 123: Prest Rd and Gibson Rd Uturn for 3.2 km (Chilliwack). Starting Mon May 26 until Fri Jun 27 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays. Shoulder will be closed. Last updated Fri May 23 at 4:28 PM PDT. (DBC-77015)
    Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Maintenance planned between Exit 138: Bridal Falls Rd and Wahleach Access Rd for 1.2 km (7 to 9 km east of Chilliwack). Starting Mon Jun 30 at 9:00 AM PDT until Fri Jul 11 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on weekdays. Right lane will be closed. Shoulder will be closed. Speed limit reduced to 80km/h. No work permitted on Fridays or Mondays of a long weekend. Last updated Fri May 23 at 4:18 PM PDT. (DBC-77013)
    Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Utility work between Nicomen River Rd and Junction Hwy 8 for 1.7 km (14 to 12 km west of Spences Bridge). Until Fri Jun 20 at 6:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Last updated Thu May 22 at 2:00 PM PDT. (DBC-76568)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Utility work planned between Juniper Beach Prov Park Access Rd and Back Valley Rd for 3.2 km (14 to 17 km east of Cache Creek). Starting Wed Jun 4 at 7:00 AM PDT until Wed Jun 4 at 6:00 PM PDT. Lane Closure. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Tue May 20 at 2:33 PM PDT. (DBC-76829)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Geotechnical investigation planned between Ballou Rd and Tunkwa Lake Rd for 0.5 km (30 km west of Kamloops). Starting Thu Jun 5 at 7:00 AM PDT until Thu Jun 5 at 7:00 PM PDT. Lane closures in both directions planned. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Thu May 22 at 3:50 PM PDT. (DBC-76971)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Paving operations between Pat Rd and Miners Bluff Rd for 17.7 km (Kamloops). Until Fri Jun 27 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Lane Closure. Watch for traffic control. Last updated Tue May 20 at 7:02 AM PDT. (DBC-76609)
    Highway 1 Highway 1 (TransCanada Highway). Mowing between Old Ferry Rd and Des Fosses Rd for 44.2 km (7 km east of Kamloops to 14 km east of Chase). Starting Mon May 26 until Mon Jun 9. From 7:00 AM to 3:30 PM PDT on weekdays. Watch for slow moving equipment and shadow trucks. Last updated Thu May 22 at 12:29 PM PDT. (DBC-76962)
    Highway 1 Highway 1 (TransCanada Highway). Pavement patching is planned. Between Old Ferry Rd and Des Fosses Rd for 44.1 km (7 km east of Kamloops to 14 km east of Chase). Starting Mon May 26 until Mon Jun 9. From 7:00 AM to 3:30 PM PDT on weekdays. Lane Closure. Patching - Moving work zone, expect intermittent lane closures. Last updated Thu May 22 at 12:27 PM PDT. (DBC-76961)
    Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Construction work planned between Stoney Flats Rd and Chief Neskonlith Dr for 8.0 km (13 to 5 km west of Chase). Starting Mon Jun 9 at 8:00 AM PDT until Fri Jun 13 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Expect minor delays. Last updated Thu May 15 at 1:28 PM PDT. (DBC-76683)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work planned between Stoney Flats Rd and Chief Neskonlith Dr for 8.0 km (5 to 13 km west of Chase). Starting Tue May 27 at 8:00 AM PDT until Fri May 30 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Expect minor delays. Last updated Wed May 14 at 1:05 PM PDT. (DBC-76630)
    Highway 1 Highway 1 (TransCanada Highway). Maintenance planned between Silver Sands Rd and Seed Frtg for 0.8 km (Sicamous). Starting Mon May 26 at 5:30 AM PDT until Mon May 26 at 10:00 AM PDT. Watch for traffic control personnel. Catch basin cleaning - Moving work zone, be prepared for short intermittent lane closures. Last updated Thu May 22 at 12:51 PM PDT. (DBC-76963)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Utility work planned between 19 Mile OH Bridge and Enchanted Forest Ftg Rd for 1.9 km (27 to 29 km west of Revelstoke). Starting Mon May 26 until Fri May 30. From 10:30 AM to 2:30 PM PDT on weekdays. Watch for traffic control personnel. Last updated Thu May 22 at 9:21 AM PDT. (DBC-76943)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Rock slope stabilization between Three Valley Avalanche Gate and Three Valley Frtg Rd for 2.1 km (18 to 16 km west of Revelstoke). Until Mon May 26 at 5:00 PM PDT. From 5:00 AM to 5:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays of 20 minutes. Work scheduled 12pm to 7pm Thursday May 22. Work returns to 5am-5pm daily starting Friday May 23. Last updated Wed May 21 at 7:01 PM PDT. (DBC-74730)
    Highway 1 Westbound Highway 1 (TransCanada Highway), westbound. Maintenance planned between Pine Rd and Clanwilliam OH Bridge for 6.2 km (2 to 9 km west of Revelstoke). Starting Thu May 29 at 7:30 AM PDT until Thu May 29 at 5:00 PM PDT. Watch for traffic control personnel. Environmental cleanup work will be taking place. Last updated Thu May 22 at 9:47 AM PDT. (DBC-76946)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Woods OH Bridge and Boulder Mtn Avalanche Gate for 4.2 km (8 to 12 km west of Revelstoke). Until Sun Aug 31. From 7:00 PM to 7:00 AM PDT daily. Single lane alternating traffic with a 4 meter width restriction. Speed reduction to 30km/h during construction. Last updated Tue May 20 at 5:08 PM PDT. (DBC-75826)
    Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Utility work planned between Back Rd and Pine Rd for 0.5 km (3 to 2 km west of Revelstoke). Starting Mon May 26 until Thu May 29. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic will be in effect. Last updated Thu May 15 at 3:02 PM PDT. (DBC-76629)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Bridge construction at Meadows in the Sky Pkwy (Revelstoke). Until Fri Oct 31. Watch for traffic control. Lane Closure. Expect speed reductions to 50km/hr. No work on long weekends. Last updated Tue May 13 at 2:27 PM PDT. (DBC-76584)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Utility work planned between Townley St and Greely Rd for 6.1 km (Revelstoke). Starting Tue May 27 at 8:00 AM PDT until Tue May 27 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Wed May 21 at 8:50 AM PDT. (DBC-76881)
    Highway 1 Highway 1 (TransCanada Highway). Rest area closed at Redgrave Rest Area (14 km east of East Boundary of Glacier National Park). Redgrave rest area is permanently closed. New rest area will be built just west of the current location. Stay tuned for more updates as construction progresses. Last updated Wed May 21 at 10:39 AM MDT. (DBC-73964)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Maintenance between Redgrave Rest Area and Anderson Rd for 39.9 km (14 km east of East Boundary of Glacier National Park to 1 km west of Golden). From 8:00 AM to 3:30 PM MDT on Monday and Tuesday. Last updated Mon May 5 at 8:18 AM MDT. (DBC-76164)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Road construction work between Redgrave Rest Area and Wiseman Rd for 6.0 km (15 to 21 km east of East Boundary of Glacier National Park). Until Mon Oct 27. From 7:00 AM to 7:00 PM MDT daily. Construction zone reduced speed limit in effect. Lane widths are 5 metres each direction. Watch for crews and expect delays. Next update time Tue Jul 15 at 12:00 PM MDT. Last updated Tue Apr 15 at 9:05 PM MDT. (DBC-75437)
    Highway 1 Both Directions Highway 1 (Kicking Horse Pass), in both directions. Watch for falling rocks between Golden Donald Upper Rd and Yoho Bridge (5 km east of Golden). Debris on roadway. Last updated Sun May 25 at 3:33 PM MDT. (DBC-44269)
    Highway 10 Both Directions Highway 10, in both directions. Utility work at 72 Ave (Langley - District). Until Sun Jun 15 at 4:00 PM PDT. From 8:00 AM to 4:00 PM PDT daily. Shoulder maintenance. On and off-ramps from 232nd street will be impacted by work. Watch for crews and pass with caution. Last updated Fri Mar 21 at 1:27 PM PDT. (DBC-74278)
    Highway 101 Westbound Highway 101, westbound. Electrical maintenance planned between Hallowell Rd and Egmont Rd for 5.2 km (40 to 45 km west of Sechelt). Starting Mon May 26 at 8:00 AM PDT until Mon May 26 at 5:00 PM PDT. Utility work planned. Right lane will be blocked. Last updated Tue May 13 at 9:47 AM PDT. (DBC-76576)
    Highway 101 Westbound Highway 101, westbound. Utility work planned between Nestman Rd and Selma Park Rd for 0.9 km (Sechelt). Starting Thu Jul 3 until Sat Jul 19 at 4:00 PM PDT. From 8:00 AM to 4:00 PM PDT daily. Right lane will be closed. Single lane alternating traffic will be in effect. Last updated Mon Apr 21 at 12:10 PM PDT. (DBC-72411)
    Highway 101 Both Directions Highway 101, in both directions. Utility work planned between Field Rd and McCullough Rd (Sechelt). Starting Tue Jun 3 at 7:30 AM PDT until Tue Jun 3 at 5:00 PM PDT. Lane Closure. Watch for traffic control personnel. Expect delays. Last updated Fri May 16 at 4:31 PM PDT. (DBC-76735)
    Highway 11 Both Directions Highway 11, in both directions. Utility work planned between McConnell Rd and McClary Ave for 0.7 km (Abbotsford). Starting Mon Jun 2 until Tue Jun 17 at 4:00 PM PDT. From 8:00 AM to 4:00 PM PDT daily. Right lane will be closed. Last updated Wed May 21 at 4:26 PM PDT. (DBC-76909)
    Highway 11 Northbound Highway 11, northbound. Bridge maintenance between Riverside St and London Ave Overpass for 1.9 km (Abbotsford to Mission). Until Fri May 30. From 9:00 PM to 6:30 AM PDT on weekends and from 9:00 PM to 5:30 AM PDT on weekdays. Alternating lane closures. Watch for traffic control and expect delays. Last updated Thu May 1 at 9:13 AM PDT. (DBC-76050)
    Highway 11 Southbound Highway 11, southbound. Bridge maintenance between London Ave Overpass and Riverside St for 2.6 km (Mission to Abbotsford). Until Fri May 30 at 5:30 AM PDT. From 9:00 PM to 6:30 AM PDT on Saturday and from 9:00 PM to 5:30 AM PDT on weekdays. Alternating lane closures. Watch for traffic control and expect delays. Last updated Wed May 21 at 8:08 AM PDT. (DBC-76875)
    Highway 13 Both Directions Highway 13, in both directions. Construction work at 56 Ave (Langley - District). Until Thu Jul 31 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT daily. Detour in effect. Entrance ramp closed. Last updated Mon Apr 21 at 12:10 PM PDT. (DBC-74197)
    Highway 14 Westbound Highway 14, westbound. Utility work planned between Croce Rd and Grant Rd W (Sooke). Starting Tue May 27 at 7:00 PM PDT until Wed May 28 at 6:00 AM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Fri May 23 at 9:49 AM PDT. (DBC-76997)
    Highway 14 Highway 14. Special event planned between Croce Rd and Brooks Rd for 0.9 km (Sooke). Starting Sat Jun 7 at 11:00 AM PDT until Sat Jun 7 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Tue Apr 29 at 8:59 AM PDT. (DBC-75941)
    Highway 14 Both Directions Highway 14, in both directions. Utility work planned between Atherly Close and Shields Rd for 0.1 km (Sooke). Starting Mon May 26 at 9:00 AM PDT until Thu May 29 at 3:00 PM PDT. Shoulder will be closed. Last updated Wed May 21 at 9:28 AM PDT. (DBC-76887)
    Highway 14 Both Directions Highway 14, in both directions. Utility work between Church Rd and Phillips Rd for 1.1 km (Sooke). Until Wed Dec 31 at 12:00 PM PDT. Lane Closure. Watch for traffic control. Last updated Mon May 5 at 7:43 AM PDT. (DBC-75277)
    Highway 14 Westbound Highway 14, westbound. Paving operations planned between Meaford Ave and Langford Pky for 0.2 km (Langford to Colwood). Starting Mon May 26 until Fri May 30. Right turn lane will be closed. Shoulder will be closed. Work on shoulder from 7AM-4PM and 7PM-2AM until May 30. Last updated Tue May 20 at 4:30 PM PDT. (DBC-76841)
    Highway 14 Both Directions Highway 14, in both directions. Utility work between Station Ave and Danbrook Ave for 0.2 km (Langford). Until Fri May 30. From 9:00 AM to 3:00 PM PDT daily. Right lane closed. Last updated Tue May 20 at 10:11 AM PDT. (DBC-76810)
    Highway 15 Southbound Highway 15 (Pacific Highway), southbound. Utility work between 60 Ave and 58 Ave for 0.1 km (Surrey). Until Mon Jun 30 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT daily. Shoulder closed. Right lane closed. Southbound sidewalk closed. Pedestrians must cross at 60 Ave or 58 Ave. Last updated Mon Apr 21 at 12:17 PM PDT. (DBC-75355)
    Highway 15 Both Directions Highway 15 (Pacific Highway), in both directions. Road construction work at 60 Ave (Surrey). Until Tue May 27 at 6:00 AM PDT. From 8:00 PM to 6:00 AM PDT daily. Right turn lane closed. Left turn lane closed. Last updated Wed May 14 at 1:20 PM PDT. (DBC-76631)
    Highway 15 Northbound Highway 15 (Pacific Highway), northbound. Construction work between 68A Ave and Fraser Hwy for 1.1 km (Surrey). Until Mon Jun 30. From 9:30 PM to 5:30 AM PDT daily. Right lane closed. Shoulder closed. Watch for traffic control. Last updated Fri May 23 at 3:09 PM PDT. (DBC-77008)
    Highway 16 Westbound Highway 16 (on Haida Gwaii), westbound. Construction work at Nadu Rd (16 km west of Port Clements). Expect delays. Watch for traffic control. Reduce speed, obey signage. Next update time Mon May 26. Last updated Thu May 22 at 1:25 PM PDT. (DBC-76845)
    Highway 16 Both Directions Highway 16 (on Haida Gwaii), in both directions. Bridge maintenance between E Cedar Ave and Beitush Rd for 6.3 km (7 km west of Tlell to 5 km east of Port Clements). Bridge construction. Bridge repairs in effect at Woodpile Bridge. Speed reduction, reduce speed. Next update time Mon May 26 at 12:30 PM PDT. Last updated Fri May 23 at 12:17 PM PDT. (DBC-74895)
    Highway 16 Westbound Highway 16 (Yellowhead Highway), westbound. Utility work between Estate Rd and Nautley Rd for 6.5 km (Fort Fraser). Until Fri May 30 at 4:00 PM PDT. Lane Closure. Single lane alternating traffic. Watch for traffic control. Last updated Mon May 12 at 10:44 AM PDT. (DBC-76515)
    Highway 16 Eastbound Highway 16 (Yellowhead Highway), eastbound. Bridge maintenance planned between Moose Lake Boat Launch and Moose River Bridge for 0.1 km (5 km east of Moose Lake). Starting Tue May 27 at 7:00 AM PDT until Fri Jun 20 at 7:00 AM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Sun May 25 at 9:35 AM PDT. (DBC-77051)
    Highway 17 Northbound Highway 17 (Patricia Bay Highway), northbound. Utility work planned between McKenzie Ave and Exit 9: Quadra St for 2.2 km (Saanich). Starting Thu Jun 12 until Tue Jun 17 at 4:30 PM PDT. From 8:00 AM to 4:30 PM PDT daily. Shoulder will be closed. Last updated Mon May 12 at 10:45 AM PDT. (DBC-76514)
    Highway 17 Northbound Highway 17 (Patricia Bay Highway), northbound. Utility work planned between Haliburton Rd and Gliddon Rd for 4.2 km (Saanich to Central Saanich). Starting Thu Jul 17 at 10:00 PM PDT until Fri Jul 18 at 6:00 AM PDT. Crews will be flushing hydrants with a rolling right shoulder closure. Possible intermittent lane closures as required. Last updated Thu May 22 at 11:14 AM PDT. (DBC-76944)
    Highway 17 Southbound Highway 17 (Patricia Bay Highway), southbound. Utility work planned between Gliddon Rd and Haliburton Rd for 4.8 km (Central Saanich to Saanich). Starting Thu Jul 24 at 10:00 PM PDT until Fri Jul 25 at 6:00 AM PDT. Crews will be flushing hydrants with a rolling right shoulder closure. Possible intermittent lane closures as required. Last updated Thu May 22 at 11:12 AM PDT. (DBC-76953)
    Highway 17 Southbound Highway 17 (Patricia Bay Highway), southbound. Special event planned between Lands End Rd and Exit 31 (North Saanich). Starting Wed Jul 23 at 6:00 PM PDT until Wed Jul 23 at 7:30 PM PDT. Victoria Wheelers Cycling Club Bike Race - watch for cyclists at Wain Rd off ramp. Last updated Tue Mar 25 at 9:50 AM PDT. (DBC-74423)
    Highway 17 Westbound Highway 17, westbound. Construction work planned between Grace Rd and Highway 91 Connector for 0.2 km (Delta to Surrey). Starting Tue May 27 until Wed May 28. From 8:00 AM to 2:00 PM PDT on Tuesday and Wednesday. Right turn lane will be closed. Shoulder will be closed. Last updated Thu May 15 at 2:48 PM PDT. (DBC-76687)
    Highway 18 Eastbound Highway 18, eastbound. Utility work planned between North Shore Rd E and Somenos Rd for 25.5 km (Lake Cowichan). Starting Mon May 26 at 8:30 AM PDT until Mon May 26 at 3:30 PM PDT. Shoulder will be closed. Last updated Thu May 15 at 10:52 AM PDT. (DBC-76677)
    Highway 18 Highway 18. Utility work planned between MacDonald Rd and Cowichan Lake Rd for 0.2 km (Lake Cowichan). Starting Mon Jun 2 at 7:00 AM PDT until Mon Jun 2 at 11:45 PM PDT. Road will be closed intermittently. Watch for traffic control personnel. Audio Comment: Road will be closed for up to 5 minutes at some point during the day. Last updated Tue May 20 at 3:42 PM PDT. (DBC-76835)
    Highway 19 Southbound Highway 19 (Island Highway), southbound. Utility work between Barge Terminal Rd and Timberwest Mainline for 0.9 km (Campbell River). Until Mon May 26 at 4:00 PM PDT. Telus Poles - Aerial drops and HWY crossing. Last updated Mon May 12 at 2:26 PM PDT. (DBC-76526)
    Highway 19 Northbound Highway 19 (Inland Island Highway), northbound. Special event planned between Dawson Rd and NW Bay Logging Rd for 0.7 km (2 to 3 km south of Parksville). Starting Sat May 31 at 6:30 AM PDT until Sat May 31 at 5:30 PM PDT. Right lane will be closed. Expect delays. Watch for traffic control personnel. FOAM FEST - Watch for speed reduction. Last updated Thu May 22 at 3:21 PM PDT. (DBC-76968)
    Highway 19 Both Directions Highway 19 (Inland Island Highway), in both directions. Utility work between Kinghorn Rd and Northwest Bay Rd for 0.4 km (6 km south of Parksville). Until Mon May 26 at 6:00 AM PDT. Right lane is closed in both directions. Expect minor delays. Watch for traffic control. Watch for work crews. Last updated Mon May 12 at 8:27 AM PDT. (DBC-76408)
    Highway 19 Both Directions Highway 19 (Inland Island Highway), in both directions. Utility work planned between Hillview Rd and Rumming Rd for 0.1 km (8 km north of Nanaimo). Starting Thu Jun 5 at 9:00 AM PDT until Thu Jun 5 at 3:00 PM PDT. Shoulder will be closed. Work on Shoulder only - Watch for work crews. Last updated Wed May 21 at 12:14 PM PDT. (DBC-76894)
    Highway 19A Northbound Highway 19A (Island Highway), northbound. Utility work planned between Lalum Rd and Ployart Rd for 0.4 km (15 to 16 km south of Campbell River). Starting Wed May 28 at 11:00 PM PDT until Thu May 29 at 6:00 AM PDT. Single lane alternating traffic will be in effect. Rogers - Run communication line. Last updated Wed May 7 at 1:48 PM PDT. (DBC-76326)
    Highway 19A Highway 19A (Island Highway). Construction work planned between Henry Rd and Heard Rd for 2.8 km (4 to 1 km south of Campbell River). Starting Wed Jun 4 at 7:00 AM PDT until Fri Jan 30, 2026 at 7:00 PM PDT. Multiple locations. Work at each location done within 3 hrs. Last updated Tue Apr 8 at 2:45 PM PDT. (DBC-75100)
    Highway 20 Highway 20. Utility work between MacK Rd and Walker Park Rd for 0.9 km (9 to 10 km east of Bella Coola). Until Fri May 30 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT daily. Single lane alternating traffic. Watermain Installation. Please watch for signage and personnel. Expect minor delays of up to ten minutes. Last updated Mon Apr 21 at 12:22 PM PDT. (DBC-75347)
    Highway 20 Highway 20. Frost heaves between Olsen Dr and Sawmill Creek Rd for 214.3 km (16 km east of Bella Coola to Tatla Lake). Last updated Sun May 25 at 2:56 PM PDT. (DBCRCON-223171)
    Highway 20 Both Directions Highway 20, in both directions. Road maintenance work between Hunlen Falls Turner Lakes Trailhead and Christensen Rd for 51.5 km (43 km east of Firvale to Anahim Lake). Until Fri May 30 at 3:00 PM PDT. Single lane alternating traffic. Last updated Tue May 20 at 8:55 AM PDT. (DBC-76798)
    Highway 23 Both Directions Highway 23, in both directions. Watch for falling rocks between Maley Rd and Mica Dam for 147.7 km (Revelstoke to 5 km north of Mica Dam). Last updated Sun May 25 at 2:33 PM PDT. (DBC-77050)
    Highway 26 Highway 26. Road maintenance work at Stanley Rd (12 km west of Wells). Single lane alternating traffic. Last updated Thu May 22 at 7:16 PM PDT. (DBC-76011)
    Highway 28 Both Directions Highway 28, in both directions. Bridge maintenance at Western Mine Rd (37 km west of Campbell River). Until Fri May 30 at 7:30 PM PDT. From 7:30 AM to 6:00 PM PDT daily. Single lane alternating traffic. Watch for traffic control. Active working hours 7:30am to 6:00pm. This is a 24hr 7 day a week operation at Buttle Narrows. Last updated Mon Mar 24 at 12:32 PM PDT. (DBC-74354)
    Highway 28 Both Directions Highway 28, in both directions. Ditching between Muchalat Pl and Western Mine Rd for 39.8 km (37 km west of Campbell River to Gold River). Until Fri May 30 at 5:00 PM PDT. From 8:00 AM to 5:00 PM PDT on weekdays and Saturday. Watch for traffic control. SLOW MOVING OPERATION. Last updated Tue May 13 at 3:18 PM PDT. (DBC-76199)
    Highway 29 Highway 29. Utility work between MacKenzie Way and Bullmoose Rd for 10.4 km (Tumbler Ridge). Until Fri Jun 27. From 8:00 AM to 6:00 PM MST on weekdays. Single lane alternating traffic. Watch for traffic control. Last updated Tue May 13 at 11:35 AM MST. (DBC-76581)
    Highway 29 Highway 29. Utility work between Nicholson Rd and Lakeshore Dr for 24.9 km (Chetwynd). Until Fri May 30. From 8:00 AM to 6:00 PM MST on weekdays. Single lane alternating traffic. Last updated Tue May 20 at 11:37 AM MST. (DBC-76108)
    Highway 29 Highway 29. Bridge maintenance planned between Reschke Rd and Thompson Rd for 55.9 km (59 to 3 km north of Hudson's Hope). Starting Mon May 26 at 8:00 AM MST for the next two weeks. From 8:00 AM to 4:30 PM MST on Monday, Tuesday, Wednesday and Thursday. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Wed May 14 at 3:58 PM MST. (DBC-76645)
    Highway 3 Highway 3 . Maintenance planned at Newton Road 5 km east of Keremeos. Starting Mon Jun 2 at 7:00 AM PST until Fri Jun 6 at 4:00 PM PST. Shoulder will be closed. Work taking place on Newton Road. Last updated Mon Jan 27 at 4:23 PM PST. (DBC-72315)
    Highway 3 Both Directions Highway 3 (Crowsnest Highway), in both directions. Construction work between Second Avalanche Gate and Allison Pass Summit for 7.9 km (33 to 40 km east of Hope). Until Mon Dec 1 at 7:00 PM PDT. From 6:00 AM to 7:00 PM PDT on weekdays. Expect delays. Lane Closure. Temporary detour at Snass Creek Bridge. Last updated Mon Apr 21 at 12:32 PM PDT. (DBC-74724)
    Highway 3 Both Directions Highway 3 (Crowsnest Highway), in both directions. Utility work planned between Barcelo Rd and Chopaka Rd for 6.5 km (11 to 18 km east of Keremeos). Starting Mon May 26 at 8:00 AM PDT until Mon May 26 at 5:00 PM PDT. Speed reduction to 50km/hour. Last updated Tue May 20 at 11:53 AM PDT. (DBC-76819)
    Highway 3 Highway 3 (Crowsnest Highway). Watch for falling rocks between Wilgress Lake Rest Area and Granby Rd for 26.1 km (2 km west of Eholt Summit to Grand Forks). Last updated Tue Apr 1 at 4:26 AM PDT. (DBC-73820)
    Highway 3 Highway 3 (Crowsnest Highway). Watch for falling rocks between East Lake Dr and Highway 3B for 39.8 km (Christina Lake to 24 km west of Castlegar). Last updated Tue Apr 1 at 4:26 AM PDT. (DBC-73822)
    Highway 3 Highway 3 (Crowsnest Highway). Watch for falling rocks between Junction Hwy 6NS and West Creston Rd for 55.4 km (14 km east of Salmo to 10 km west of Creston). Last updated Tue Apr 1 at 4:26 AM PDT. (DBC-73304)
    Highway 3 Both Directions Highway 3 (Crowsnest Highway), in both directions. Watch for falling rocks between West Avalanche Gate and East Avalanche Gate for 18.0 km (Kootenay Pass). Next update time Mon Jun 2 at 11:30 AM PDT. Last updated Thu Apr 10 at 11:53 AM PDT. (DBC-75211)
    Highway 3 Both Directions Highway 3 (Crowsnest Highway), in both directions. Road construction work planned between Alexander Bridge and BC/AB Border for 20.3 km (Sparwood to British Columbia and Alberta Border). Starting Mon May 26 until Sat Jul 5 at 7:00 PM MDT. From 7:00 AM to 7:00 PM MDT on weekdays and Saturday. Single lane alternating traffic will be in effect. Last updated Thu May 22 at 10:36 AM MDT. (DBC-76938)
    Highway 31 Highway 31. Watch for falling rocks between Cascade Creek Mainline and Junction Hwy 23 for 57.5 km (Trout Lake). Last updated Tue Apr 1 at 4:27 AM PDT. (DBC-74515)
    Highway 33 Both Directions Highway 33, in both directions. Paving operations between Kettle Valley Rail Trail and Beaverdell Station Rd for 34.7 km (Beaverdell to Westbridge). Until Fri Jul 11. From 6:30 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Watch for traffic control. Watch for uneven pavement and milled surfaces. No work on long weekends. Last updated Thu Apr 24 at 12:47 PM PDT. (DBC-75739)
    Highway 37 Both Directions Highway 37, in both directions. Bridge construction at Hanna North Bridge (7 km north of Meziadin). Until Fri Oct 31. Single lane alternating traffic. Width limit 4.00 m. EOL approvals up to 85 tonnes with no centre line crossing restriction. Expect minor delays. Next update time Mon Jun 2 at 12:00 PM PDT. Last updated Tue May 20 at 10:07 AM PDT. (DBC-76204)
    Highway 37 Highway 37. Frost heaves between Bob Quinn Camp and the end of Highway 37 for 422.9 km (Bob Quinn to British Columbia and Yukon Border). Last updated Sun May 25 at 6:50 AM PDT. (DBCRCON-223167)
    Highway 37A Both Directions Highway 37A, in both directions. Watch for falling rocks between Bitter Cr. Bridge and Surprise Pullout/Windy Chain Up for 34.6 km (13 km west of Meziadin to 11 km east of Stewart). There is debris on the road. Last updated Sun May 25 at 2:54 PM PDT. (DBC-74957)
    Highway 3A Highway 3A. Watch for falling rocks between Kootenay Bay Ferry and Junction Hwy 3 for 78.0 km (1 km north of Kootenay Bay Ferry Landing to Creston). Last updated Tue Apr 1 at 4:26 AM PDT. (DBC-73148)
    Highway 4 Both Directions Highway 4, in both directions. Bridge maintenance between Sutton Pass Summit and Merrifield St for 45.2 km (3 km west of Sutton Pass Summit to Port Alberni). Until Wed May 28 at 4:00 PM PDT. From 9:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. Last updated Tue May 20 at 7:12 AM PDT. (DBC-76729)
    Highway 4 Both Directions Highway 4, in both directions. Maintenance between Port Alberni Summit and Chalet Rd for 9.5 km (Cathedral Grove). Vehicles/loads over 3.2m in width must contact Permit Centre for instructions at 1-800-559-9688. Next update time Fri Aug 1 at 10:00 AM PDT. Last updated Wed Apr 2 at 10:13 AM PDT. (DBC-52953)
    Highway 5 Northbound Highway 5 (Coquihalla South), northbound. Road sweeping between Exit 231: Mine Creek Rd and Exit 250: Larson Hill for 18.6 km (12 to 31 km north of Coquihalla Summit). Until Sun May 25 at 5:00 PM PDT. Please watch for slow moving traffic. Last updated Sun May 25 at 6:00 AM PDT. (DBC-77049)
    Highway 5 Both Directions Highway 5, in both directions. Material spill between Clemina Overhead Bridge and Albreda Pit Rd for 5.5 km (23 to 29 km south of Valemount). Until Fri May 30 at 4:00 PM PDT. From 7:30 AM to 6:00 PM PDT on Wednesday, Thursday and Friday. Single lane alternating traffic. Watch for traffic control. Last updated Sun May 25 at 9:28 AM PDT. (DBC-76876)
    Highway 5A Both Directions Highway 5A, in both directions. Paving operations between Douglas Lake Rd and Exit 290 for 19.2 km (30 km north of Merritt to 33 km south of Kamloops). Until Sat Jun 28. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Delays up to 10 minutes. Last updated Tue May 20 at 5:57 AM PDT. (DBC-76778)
    Highway 6 NS Both Directions Highway 6 NS, in both directions. Watch for falling rocks between Summit Lake Rd and Memphis Creek for 50.2 km (7 km north of Slocan to Summit Lake). Last updated Tue Apr 1 at 4:27 AM PDT. (DBC-73130)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 287 St for 3.9 km (Maple Ridge). Until Sat May 31 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT daily. Watch for traffic control. May 20 - May 24, May 26 - May 31. Construction speed zone 50km/hr. WB right turn to 272nd St closed. Detour at 263rd. Last updated Thu May 22 at 5:09 AM PDT. (DBC-70968)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Construction work between Madaris Rd and Rowan Rd for 2.1 km (2 to 4 km east of Mission). Until Sat May 31. From 7:00 PM to 6:00 AM PDT daily. Watch for traffic control. Last updated Thu Apr 24 at 7:52 AM PDT. (DBC-75710)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Utility work between Madaris Rd and Rowan Rd for 2.0 km (4 to 2 km east of Mission). Until Sat May 31 at 3:00 PM PDT. Watch for traffic control. No work during the long weekend. Last updated Mon May 5 at 4:09 PM PDT. (DBC-76211)
    Highway 7B Highway 7B (Mary Hill Bypass). Construction work between Broadway St and Coast Meridian Rd (Port Coquitlam). Until Thu Jul 31. Lane Closure. Bus Stop Improvement project. Last updated Mon May 12 at 3:38 PM PDT. (DBC-76533)
    Highway 7B Both Directions Highway 7B (Mary Hill Bypass), in both directions. Construction work between Kingsway Ave and the end of Highway 7B (Mary Hill Bypass) for 0.8 km (Port Coquitlam). Until Fri Jun 13 at 2:00 PM PDT. From 9:00 AM to 2:00 PM PDT daily. Lane closures in both directions in effect. Bus stop improvement project. Last updated Wed May 7 at 11:38 AM PDT. (DBC-76317)
    Highway 8 Highway 8. Watch for falling rocks between the start of Highway 8 and Dot Ranch Cut-Off Rd West for 34.8 km (Spences Bridge to 29 km west of Merritt). There is debris on the road. Last updated Wed May 14 at 2:58 AM PDT. (DBC-72877)
    Highway 8 Both Directions Highway 8, in both directions. Construction work between the start of Highway 8 and Porcupine Ridge Rd for 0.5 km (8 to 9 km east of Spences Bridge). Until Wed May 28 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. SITE 11. Next update time Wed May 28 at 5:00 PM PDT. Last updated Fri May 23 at 8:54 AM PDT. (DBC-76366)
    Highway 8 Highway 8. Construction work between the start of Highway 8 and 14 Mile Ranch Rd for 2.4 km (9 to 11 km east of Spences Bridge). Until Sat May 31 at 5:00 PM PDT. Single lane alternating traffic. SITE 9/10. 45-min closures Mon, May 26 and Tues, May 27 9am-2pm. A 15-minute traffic flush will occur between each closure on the hour every hour. Emergency vehicles accommodated. Next update time Tue May 27 at 2:00 PM PDT. Last updated Fri May 23 at 2:29 PM PDT. (DBC-74796)
    Highway 8 Highway 8. Construction work between Porcupine Ridge Rd and 14 Mile Ranch Rd for 0.5 km (11 to 12 km east of Spences Bridge). Until Fri May 30 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. SITE 8. Next update time Fri May 30 at 5:00 PM PDT. Last updated Fri May 23 at 8:48 AM PDT. (DBC-74599)
    Highway 8 Highway 8. Construction work between Porcupine Ridge Rd and 14 Mile Ranch Rd for 0.7 km (17 km east of Spences Bridge). Until Fri May 30 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. SITE 6. Next update time Fri May 30 at 5:00 PM PDT. Last updated Fri May 23 at 8:47 AM PDT. (DBC-74597)
    Highway 9 Northbound Highway 9, northbound. Utility work planned between Morrow Rd and Park St for 0.3 km (Kent). Starting Wed Jun 4 at 9:00 AM PDT until Wed Jun 4 at 3:00 PM PDT. Right lane will be closed. Last updated Thu May 15 at 9:47 AM PDT. (DBC-76670)
    Highway 9 Both Directions Highway 9, in both directions. Paving operations planned between Bristol Dr and Morrow Rd for 0.3 km (Kent). Starting Fri Jun 20 until Mon Jun 30 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT daily. Lane Closure. Last updated Thu May 22 at 10:41 AM PDT. (DBC-76950)
    Highway 93 Both Directions Highway 93, in both directions. Construction work between Radium Hill Rd and Stanley St for 3.1 km (Radium Hot Springs). Until Thu Jul 10 at 7:00 PM MDT. From 7:00 AM to 7:00 PM MDT on weekdays and Saturday. Watch for traffic control. Expect delays. Singe lane alternating traffic May 26 to May 29 between 6:00am to 7:00pm. Expect major delays. Last updated Sat May 24 at 3:00 PM MDT. (DBC-73931)
    Highway 97 Highway 97. Utility work planned between Cody Road and Highway 99 11 km north of Cache Creek. Starting Mon May 26 until Tue Jun 3. From 8:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic will be in effect. Please watch for signage and personnel. Expect minor delays of up to five minutes. Last updated Thu May 22 at 8:53 AM PDT. (DBC-76942)
    Highway 97 Southbound Highway 97, southbound. Road construction work between Sandhill Rd and Pineview Dr (1 km south of Penticton). Until Fri Oct 24. Lane Closure. Shoulder closed. Industrial traffic may slow or block regular traffic. Highway extension work. Constructing new intersection and installing new traffic lights. Last updated Tue Jan 14 at 9:05 PM PST. (DBC-71783)
    Highway 97 Both Directions Highway 97, in both directions. Construction work between N Beach Rd and Hardy St for 41.4 km (2 km north of Summerland to Kelowna). Until Fri May 30 at 3:00 PM PDT. Expect delays. Lane Closure. Utility work. Last updated Mon May 12 at 11:27 AM PDT. (DBC-76517)
    Highway 97 Southbound Highway 97, southbound. Construction work between Hardy St and Park Ave for 4.9 km (5 km south of Peachland to Peachland). Until Fri May 30 at 6:00 AM PDT. Utility work. Expect minor delays. Lane Closure. Last updated Mon May 12 at 11:34 AM PDT. (DBC-76518)
    Highway 97 Both Directions Highway 97, in both directions. Electrical maintenance at Bartley Rd (West Kelowna). Until Wed May 28. From 7:00 PM to 3:00 AM PDT on Sunday, Monday, Tuesday and Wednesday. Lane Closure. Watch for traffic control. Last updated Sun May 25 at 1:01 PM PDT. (DBC-77052)
    Highway 97 Both Directions Highway 97, in both directions. Maintenance planned between Hudson Rd and William R Bennett Bridge for 5.5 km (West Kelowna to Kelowna). Starting Mon May 26 at 9:00 PM PDT until Sat May 31 at 6:00 AM PDT. Catch basin cleaning nightly from 9:00pm to 6:00am from May 26th to May 30th. Watch for crews and slow moving vehicles. Last updated Fri May 23 at 9:17 AM PDT. (DBC-76992)
    Highway 97 Both Directions Highway 97, in both directions. Paving operations between Gatzke Rd and Clerke Rd for 15.9 km (Coldstream to 13 km north of Kelowna). Until Mon Jun 30 at 6:00 AM PDT. From 3:00 PM to 6:00 AM PDT on weekdays and Sunday. Lane Closure. Watch for traffic control. Last updated Mon Apr 21 at 12:39 PM PDT. (DBC-75276)
    Highway 97 Both Directions Highway 97, in both directions. Utility work planned at Range Rd (16 km east of Falkland). Starting Tue Jun 3 at 9:30 AM PDT until Tue Jun 3 at 2:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Tue May 20 at 3:55 PM PDT. (DBC-76839)
    Highway 97 Both Directions Highway 97, in both directions. Utility work planned between Cedar Hill Rd and Shaw Rd for 4.9 km (9 to 4 km east of Falkland). Starting Mon Jun 9 at 8:00 AM PDT until Fri Jun 13 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Wed May 21 at 10:37 AM PDT. (DBC-76892)
    Highway 97 Highway 97 (Cariboo Connector). Utility work planned between Scottie Creek Rd and Mound Rd for 26.1 km (18 km north of Cache Creek to 3 km north of Clinton). Starting Mon May 26 until Tue Jun 3. From 8:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic will be in effect. Please watch for signage and personnel. Expect minor delays of up to five minutes. Last updated Thu May 22 at 3:54 PM PDT. (DBC-76972)
    Highway 97 Highway 97 (Cariboo Connector). Utility work between Soda Creek-MacAlister Rd and Kersley-Dale Landing Rd for 42.7 km (17 km south of Quesnel to 39 km north of Wildwood). Until Sat May 31. From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Vegetation maintenance along roadside. Please watch for signage and personnel. Expect minor delays of up to five minutes. Last updated Thu May 1 at 8:37 AM PDT. (DBC-76046)
    Highway 97 Southbound Highway 97 (Cariboo Connector), southbound. Construction work between Umiti Pit Rd and Pollard Rd (13 km north of Quesnel). Until Tue Sep 30. From 7:00 AM to 5:00 PM PDT daily. Lane Closure. Expect delays up to 5 minutes. Last updated Fri May 2 at 2:09 PM PDT. (DBC-76097)
    Highway 97 Highway 97 (Cariboo Connector). Rest area closed between Charles Rd and Anderson Rd (15 km south of Pineview). Next update time Mon Jun 30 at 10:00 AM PDT. Last updated Tue Apr 29 at 10:52 AM PDT. (DBC-71474)
    Highway 97 Both Directions Highway 97 (Cariboo Connector), in both directions. Utility work planned between Terminal Blvd and Ferry Ave for 1.6 km (Prince George). Starting Tue Jun 17 at 7:00 AM PDT until Tue Jun 17 at 4:00 PM PDT. Right lane will be closed. Last updated Thu May 22 at 12:54 PM PDT. (DBC-76964)
    Highway 97 Southbound Highway 97, southbound. Construction work between 15th Ave and 18th Ave for 0.2 km (Prince George). Until Fri Jun 13 at 11:45 PM PDT. From 9:00 AM to 4:00 PM PDT and from 7:00 PM to 6:00 AM PDT on weekdays and Saturday. Right lane closed. Watch for traffic control. Next update time Thu Jun 12 at 9:00 AM PDT. Last updated Mon May 12 at 9:52 AM PDT. (DBC-76466)
    Highway 97 Northbound Highway 97, northbound. Utility work between Christopher Dr and Grizzly Ave for 56.5 km (Prince George to 57 km north of Prince George). Until Fri May 30 at 4:00 PM PDT. Lane Closure. Watch for traffic control. Last updated Fri May 16 at 2:08 PM PDT. (DBC-76730)
    Highway 97 Both Directions Highway 97, in both directions. Bridge construction between Wright Creek Rd and Kinney Rd for 0.5 km (8 to 7 km north of Prince George). Until Sat Nov 15. Single lane alternating traffic. Last updated Tue Apr 15 at 3:44 PM PDT. (DBC-75426)
    Highway 97 Southbound Highway 97, southbound. Special event planned between Carp Lake Rd and Haight Rd for 6.0 km (McLeod Lake). Starting Wed Aug 6 at 9:00 AM PDT until Wed Aug 6 at 12:00 PM PDT. Lane Closure. Watch for traffic control personnel. Single lane alternating traffic will be in effect. Last updated Thu Apr 10 at 2:54 PM PDT. (DBC-75226)
    Highway 97 Highway 97. Geotechnical investigation planned between Kennedy Rd and Azu Sub Rd for 2.3 km (26 to 24 km south of Pine Pass Summit). Starting Tue May 27 until Fri May 30. From 8:30 AM to 5:30 AM PDT on weekdays. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Tue May 20 at 12:10 PM PDT. (DBC-74907)
    Highway 97 Southbound Highway 97, southbound. Bridge construction between Old Hasler Rd and Powder King Rd for 1.9 km (50 to 48 km south of Chetwynd). Until Mon Jun 30. Expect minor delays. Watch for crews and equipment working along the side of the road. Last updated Wed Mar 12 at 2:49 PM MST. (DBC-73850)
    Highway 97 Southbound Highway 97, southbound. Garbage pickup between 253 Rd and 265 Rd for 9.8 km (37 to 28 km south of Dawson Creek). Until Sun May 25 at 5:00 PM MST. Watch for groups picking up garbage along the highway. Last updated Fri May 23 at 1:43 PM MST. (DBC-77004)
    Highway 97 Highway 97 (Alaska Highway). Maintenance at Taylor Bridge (Taylor). Until Thu Jun 26 at 3:30 AM MST. From 7:00 PM to 3:30 AM MST on weekdays. Single lane alternating traffic. Loads exceeding 3.85 m in width will wait until 3:30 am to cross. Avoid lengthy delays, schedule oversized loads within 7 pm - 3:30 am time frame. Questions/concerns, email acrawford@dawsonroadmaintenance.Ca. Last updated Wed May 7 at 10:52 PM MST. (DBC-76270)
    Highway 97 Southbound Highway 97 (Alaska Highway), southbound. Utility work between Cartier Rd and 259 Rd for 0.8 km (2 to 3 km south of Fort St John). Until Thu May 29. From 7:00 AM to 7:00 PM MST daily. Shoulder closed. Last updated Wed May 21 at 2:11 PM MST. (DBC-76901)
    Highway 97A Southbound Highway 97A, southbound. Utility work planned between Stanley Ave and Mill Ave (Enderby). Starting Mon May 26 until Fri May 30 at 6:00 PM PDT. From 8:00 AM to 6:00 PM PDT on weekdays. Left turn lane will be closed. Watch for traffic control personnel. Last updated Fri May 23 at 3:28 PM PDT. (DBC-77010)
    Highway 97C Both Directions Highway 97C (Okanagan Connector), in both directions. Road sweeping between Trepanier Rd and Brenda Mine Rd for 16.3 km (3 km west of Peachland to 10 km east of Pennask Summit). Until Fri May 30. From 7:00 AM to 4:00 PM PDT on weekdays. Please watch for slow moving vehicles and crews. Last updated Wed May 21 at 7:29 AM PDT. (DBC-76861)
    Highway 99 Southbound Highway 99, southbound. Utility work between Exit 26 and 112 St for 4.9 km (Delta). Until Mon Jun 16. From 12:00 AM to 12:00 AM PDT daily. Right turn lane closed. Watch for traffic control. Expect delays. No closures on the long weekend. Last updated Wed May 14 at 4:13 PM PDT. (DBC-76647)
    Highway 99 Southbound Highway 99, southbound. Construction work between Exit 26 and Exit 20 for 1.8 km (Delta). Until Mon Jun 16. Right lane is blocked. Last updated Thu May 1 at 2:28 PM PDT. (DBC-76066)
    Highway 99 Southbound Highway 99, southbound. Construction work planned between Exit 28 and Exit 26 for 1.5 km (Delta). Starting Mon May 26 at 9:30 PM PDT until Wed May 28 at 5:30 AM PDT. Right lane will be closed. Last updated Wed May 7 at 3:15 PM PDT. (DBC-76330)
    Highway 99 Northbound Highway 99, northbound. Paving operations planned between Exit 28 and Massey Tunnel for 2.2 km (Richmond to Delta). Starting Sun May 25 at 10:00 PM PDT until Mon May 26 at 5:00 AM PDT. Lane Closure. Watch for traffic control personnel. Last updated Fri May 23 at 1:29 PM PDT. (DBC-77001)
    Highway 99 Northbound Highway 99, northbound. Paving operations planned between Blundell Rd and Exit 36: Westminster Hwy for 1.6 km (Richmond). Starting Mon May 26 at 10:00 PM PDT until Tue May 27 at 5:00 AM PDT. Right lane will be closed. Exit ramp will be closed. Detour planned. Watch for traffic control personnel. Last updated Fri May 23 at 1:33 PM PDT. (DBC-77002)
    Highway 99 Southbound Highway 99, southbound. Bridge maintenance planned at Exit 3: Horseshoe Bay Junction (West Vancouver). Starting Tue May 27 at 10:00 PM PDT until Wed May 28 at 5:00 AM PDT. Left lane will be closed. Overpass washing. Last updated Fri May 23 at 5:01 PM PDT. (DBC-77021)
    Highway 99 Northbound Highway 99, northbound. Utility work planned between Spring Creek Dr and Alta Lake Rd for 1.6 km (Whistler). Starting Mon May 26 at 9:00 AM PDT until Fri May 30 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT daily. BC Hydro equipment inspection and pole replacement. Watch for crews working. Last updated Fri May 9 at 4:45 PM PDT. (DBC-76439)
    Highway 99 Both Directions Highway 99, in both directions. Utility work planned between Lorimer Rd and Nancy Greene Dr for 0.6 km (Whistler). Starting Mon May 26 at 9:00 AM PDT until Fri May 30 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT daily. BC Hydro equipment inspection and pole replacement. Watch for crews working. Last updated Fri May 9 at 4:45 PM PDT. (DBC-76437)
    Highway 99 Both Directions Highway 99, in both directions. Construction work between Park St and Portage Rd for 0.5 km (Pemberton). Until Sat Aug 30. From 7:30 AM to 4:30 PM PST daily. Right turn lane off Hwy 99 and left turn lane onto Hwy 99 from existing access road are affected. Construction access and heavy truck access. Last updated Tue Mar 4 at 10:48 AM PST. (DBC-73529)
    Highway 99 Southbound Highway 99, southbound. Maintenance planned between Seymour Rd and Portage Rd for 11.5 km (Pemberton). Starting Thu Jun 5 until Fri Jun 13. From 7:00 AM to 4:00 PM PDT daily. Right lane will be closed. Last updated Fri May 23 at 4:36 PM PDT. (DBC-77017)
    Highway 99 Southbound Highway 99, southbound. Maintenance planned between XitOlacw Rd and Rancheree St for 6.5 km (Pemberton to 7 km north of Pemberton). Starting Thu Jun 5 until Fri Jun 13. From 7:00 AM to 4:00 PM PDT daily. Left lane will be closed. Last updated Fri May 23 at 4:42 PM PDT. (DBC-77018)
    Highway 99 Southbound Highway 99, southbound. Maintenance planned between Dyke Rd and Seymour Rd for 2.2 km (8 to 6 km north of Pemberton). Starting Thu Jun 5 until Fri Jun 13. From 7:00 AM to 4:00 PM PDT daily. Southbound lane will be closed. Last updated Fri May 23 at 4:42 PM PDT. (DBC-77019)
    Highway 99 Southbound Highway 99, southbound. Maintenance planned between Seton Lake Rd and XitOlacw Rd for 4.5 km (11 to 7 km north of Pemberton). Starting Thu Jun 5 until Fri Jun 13. From 7:00 AM to 4:00 PM PDT daily. Right lane will be closed. Last updated Fri May 23 at 4:36 PM PDT. (DBC-77016)
    Highway 99 Both Directions Highway 99, in both directions. Rock slope stabilization between Lil'wat Pl and Seton Lake Rd for 0.6 km (15 km south of Lillooet). Until Sat Jun 21 at 5:30 PM PDT. From 7:30 AM to 5:30 PM PDT on weekdays and Saturday. Single lane alternating traffic. The work is 1 KM north of the Cottonwood Rec Site. Rock scaling and slope mesh installation. Last updated Thu Apr 24 at 1:40 PM PDT. (DBC-75530)
    Highway 99 Highway 99. Bridge maintenance between Lil'wat Pl and Texas Creek Rd for 43.0 km (Lillooet). From 6:00 AM to 3:00 PM PDT on Monday, Tuesday and Wednesday. Lane Closure. Expect Bridge Cleaning between Lillooet and Blowdown. Short Delays possible. Last updated Fri Apr 25 at 1:19 PM PDT. (DBC-75810)
    Other Roads Old Alaska Highway. Geotechnical investigation at Kiskatinaw Curved Bridge 30 km north of Dawson Creek. Bridge closed. Slide impacting bridge structure, assessment underway. Next update time Wed Jul 2 at 10:00 AM MST. Last updated Thu Jan 2 at 11:37 AM MST. (DBC-30093)
    Other Roads Both Directions Youngsberg Road, in both directions. Bridge construction at Youngsberg Bridge near Princeton. Road closed. Estimated time of opening not available. No vehicle or pedestrian crossing available. Next update time Mon Jun 30 at 10:00 AM PDT. Last updated Tue Apr 1 at 8:55 AM PDT. (DBC-35978)
    Other Roads Both Directions Fulford Ganges Road, in both directions. Road construction work between Seaview Avenue and Cranberry Road. From 7:00 AM to 5:00 PM PDT on weekdays and Sunday. Single lane alternating traffic. Watch for traffic control. No work on long weekends. Next update time Mon Jun 30 at 9:00 AM PDT. Last updated Wed May 7 at 11:52 AM PDT. (DBC-68621)
    Other Roads Both Directions Colleymount Rd, in both directions. Washout at 53.5km near Burns Lake. Single lane alternating traffic. Expect delays. Partial road washout, obey signage. Next update time Thu Jun 19 at 8:30 AM PDT. Last updated Mon May 19 at 8:16 AM PDT. (DBC-71008)
    Other Roads Both Directions Ravine Way, in both directions. Construction work between Highway 1 and Highway 17 near Victoria. Night Work from 7 pm to 7 am, Construction work between Highway 17 and Ravine Way near Victoria. Expect delays and traffic interruptions on Hwy 17, Ravine Way and Carey Rd both directions. Construction zone in effect 24/7. Next update time Thu Jun 5 at 10:00 AM PDT. Last updated Mon May 5 at 8:38 AM PDT. (DBC-71339)
    Other Roads Both Directions Fairbanks Rd, in both directions. Utility work between 1110 Fairbanks Rd and 1108 Fairbanks Rd. Until Sat May 31 at 5:00 PM PDT. Single lane alternating traffic. Expect minor delays. Watch for traffic control. Utility Work - Pipe installation. Watch for work crews. Last updated Tue Apr 15 at 4:20 PM PDT. (DBC-73197)
    Other Roads Both Directions Kitsuksis Rd., in both directions. Utility work between Short st. And Spruce St. Until Fri Oct 31 at 5:00 PM PDT. Single lane alternating traffic. Expect minor delays. Watch for traffic control. WATERMAIN INSTALL - Watch for work crews. Last updated Tue Mar 18 at 11:57 AM PDT. (DBC-73760)
    Other Roads Both Directions 56th Ave, in both directions. Night time construction work between 256th St and Gloucester Way. Until Sat May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT daily. Geotechnical investigation. Lane Closure. Watch for traffic control. Last updated Tue Apr 1 at 4:11 PM PDT. (DBC-74742)
    Other Roads Both Directions 264th Street, in both directions. Night time construction work between 48 Ave and 58 Ave. Until Sat May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT daily. Geotechnical investigation. Lane Closure. Watch for traffic control. Last updated Tue Apr 1 at 4:22 PM PDT. (DBC-74747)
    Other Roads Both Directions Riverside Rd, in both directions. Roadway obstruction between 233 Riverside Rd and 136 Riverside Rd. Road closed. Sinkhole blocking both lanes. All properties are accessible on either side of the closure. Next update time Mon Jun 9 at 10:00 AM PDT. Last updated Sun May 25 at 10:49 AM PDT. (DBC-75092)
    Other Roads Hardy Bay Rd. Special event planned between Market St and Coal Harbour Rd 1 km north of Port Hardy. Starting Sun Jun 1 at 7:00 AM PDT until Sun Jun 1 at 2:00 PM PDT. Hardy Hussle June 1 7am to 2pm. Last updated Tue Apr 8 at 3:23 PM PDT. (DBC-75103)
    Other Roads Both Directions Fisher Rd, in both directions. Special event planned between Holland Ave and Watson Ave. Starting Sat Aug 23 at 7:00 AM PDT until Sat Aug 23 at 5:00 PM PDT. Road closure planned. Cobble Hill Fair. Last updated Mon Apr 14 at 9:51 AM PDT. (DBC-75349)
    Other Roads Westbound University Blvd, westbound. Geotechnical investigation between Blanca St and Wesbrook Mall 1 km north of Vancouver. Until Fri Jun 6. From 7:30 AM to 7:00 PM PDT daily. Left shoulder closed. Geotechnical investigation on median. Watch for traffic control. Last updated Fri Apr 25 at 11:42 AM PDT. (DBC-75801)
    Other Roads Southbound Bradner Rd, southbound. Utility work between Downes Rd and Highway 1 in Abbotsford. Until Sat May 31. From 7:00 AM to 5:00 PM PDT daily. Work taking place underneath Highway 1 from Downes Rd to Downes Rd on Bradner. Last updated Fri Apr 25 at 1:23 PM PDT. (DBC-75811)
    Other Roads Both Directions Cypress Bowl Road, in both directions. Road maintenance work between Uplands Way and Cypress Place 1 km north of West Vancouver. Until Sat May 31. From 7:30 AM to 4:00 PM PDT on weekdays. Expect minor delays. Last updated Fri Apr 25 at 4:47 PM PDT. (DBC-75820)
    Other Roads Both Directions Deloume Rd, in both directions. Utility work between Lodge Pole Rd and Lilmac Rd. Until Sat May 31 at 6:00 PM PDT. Single lane alternating traffic. Last updated Wed May 7 at 11:32 AM PDT. (DBC-76316)
    Other Roads Mission Mountain Road. Special event between Carpenter Lake Road and Shalalth Road 85 km west of Lillooet. Until Fri May 30. From 7:00 AM to 5:00 PM PDT daily. Lane closures in both directions in effect. Helicopter in use will be harvesting timber. Expect delays of up to 30 minutes. Traffic to be let through when safe to do so. Please obey all signage and personnel. Last updated Tue May 13 at 8:05 AM PDT. (DBC-76376)
    Other Roads Both Directions Summers Creek Rd, in both directions. Utility work between Highway 5A and Prospect Dr 16 km north of Princeton. Until Thu Jun 19 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT daily. Expect single lane traffic in multiple work zones. Last updated Fri May 9 at 6:21 AM PDT. (DBC-76392)
    Other Roads Both Directions Main St, in both directions. Utility work planned between Mountain Highway and Phibbs Exchange 1 km north of North Vancouver - District. Starting Tue Jun 3 at 10:00 AM PDT until Tue Jun 3 at 2:00 PM PDT. Right turn lane will be closed. Centre lane will be closed. Watch for traffic control personnel. Last updated Fri May 9 at 4:51 PM PDT. (DBC-76440)
    Other Roads Both Directions Youbou Rd, in both directions. Utility work between Indian Rd and Tsu Aggregates Quarry 1 km west of Lake Cowichan. Until Fri Jun 6. From 8:30 AM to 3:30 PM PDT daily. Shoulder closed. 5 min single lane alternating traffic may occur. Last updated Mon May 12 at 8:53 AM PDT. (DBC-76510)
    Other Roads Both Directions Allenby Road, in both directions. Utility work planned between Boys Road and Indian Road in Duncan. Starting Mon May 26 at 8:00 AM PDT until Mon May 26 at 4:00 PM PDT. Road closure planned. Watch for traffic control personnel. Last updated Mon May 12 at 3:55 PM PDT. (DBC-76535)
    Other Roads Ryan Rd. Utility work planned at Lerwick Rd. Starting Mon May 26 at 8:00 PM PDT until Thu May 29 at 6:00 AM PDT. Urgent Valve Replacement. Intersection will be 4 way stop with traffic control. Last updated Wed May 14 at 8:48 AM PDT. (DBC-76616)
    Other Roads Eastbound Chancellor Blvd, eastbound. Utility work between Western Pkwy and Acadia Rd in Vancouver. Until Mon Jun 16. From 7:00 AM to 5:00 PM PDT daily. Shoulder maintenance. Watch for traffic control. Last updated Wed May 14 at 3:06 PM PDT. (DBC-76641)
    Other Roads Both Directions S Shore Rd, in both directions. Utility work planned between Mesachie Lake and Beaver Lake Resort Entrance in Lake Cowichan. Starting Mon May 26 at 8:00 AM PDT until Mon May 26 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Thu May 15 at 10:48 AM PDT. (DBC-76676)
    Other Roads Eastbound Moray Bridge, eastbound. Bridge maintenance at Sea Island Way in Richmond. Until Fri Jun 6 at 2:30 PM PDT. From 6:00 AM to 2:30 PM PDT on weekdays. Lane Closure. Watch for traffic control. Last updated Wed May 21 at 3:25 PM PDT. (DBC-76715)
    Other Roads Westbound Mountain Hwy, westbound. Utility work between Oxford St and Main St. Until Mon Jun 2 at 6:00 AM PDT. From 7:00 PM to 6:00 AM PDT daily. Centre lane blocked. Left turn lane closed. Last updated Tue May 20 at 10:08 AM PDT. (DBC-76805)
    Other Roads West Fraser Road. Utility work between Marguerite Ferry West Rd and Ruutan Road 30 km south of Quesnel. Until Fri Jun 6. From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Tree pruning. Vegetation Maintenance along roadside for 35km. Please watch for signage and personnel. Last updated Tue May 20 at 11:55 AM PDT. (DBC-76820)
    Other Roads 003 Rolla. Ditching between Blackfoot Rd and 205 Rd. Until Fri May 30 at 4:00 PM MST. From 6:30 AM to 4:00 PM MST on weekdays. Single lane alternating traffic. Please slow down, watch for crew and equipment working in the area. Last updated Wed May 21 at 8:59 AM MST. (DBC-76882)
    Other Roads Both Directions Squilax Anglemoint , in both directions. Mowing between Highway 1 and Fern Glen Rd. Starting Mon May 26 until Mon Jun 9. From 7:00 AM to 3:30 PM PDT on weekdays. Entire length of Squilax Anglemont from HWY 1 to St Ives. Watch for slow moving equipment and shadow vehicles. Last updated Wed May 21 at 2:38 PM PDT. (DBC-76902)
    Other Roads Westbound Brechin Rd, westbound. Tree pruning planned between Beach Dr and Beach Dr. Starting Tue May 27 at 9:00 AM PDT until Fri May 30 at 3:00 PM PDT. Right lane will be closed. Expect minor delays. Watch for traffic control personnel. Watch for work crews. Last updated Thu May 22 at 11:58 AM PDT. (DBC-76960)
    Other Roads Both Directions Golden Ears Connector, in both directions. Paving operations planned at 177A St. Starting Mon May 26 at 7:00 PM PDT until Fri May 30 at 6:00 AM PDT. From 7:00 AM to 6:00 AM PDT on weekdays. Right lane will be closed in both directions. Last updated Fri May 23 at 9:38 AM PDT. (DBC-76995)
    Other Roads Both Directions Golden Ears Connector, in both directions. Paving operations planned between 177A St. And 179 St. Starting Mon May 26 at 7:00 PM PDT until Fri May 30 at 6:00 AM PDT. From 7:00 PM to 6:00 AM PDT on weekdays. Right lane will be closed in both directions. Last updated Fri May 23 at 9:47 AM PDT. (DBC-76996)
    Other Roads Deltaport Way. Bridge maintenance planned between 41b St and 27b Ave. Starting Sun May 25 at 11:00 PM PDT until Mon May 26 at 5:00 AM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Bridge cleaning on Roberts Bank Overhead bridge structure. Last updated Fri May 23 at 2:50 PM PDT. (DBC-77007)
    Other Roads Southbound Copper Mine Rd, southbound. Paving operations planned between East Sooke Rd and Andover Rd. Starting Thu May 29 at 7:00 AM PDT until Mon Jun 30 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Work will be done on two different days, within the time period specified. Last updated Fri May 23 at 3:07 PM PDT. (DBC-77009)
    Upper Arrow Lake Ferry Upper Arrow Lake Ferry. Departure delayed between Shelter Bay and Galena Bay. From 8:45 AM to 11:00 AM PST on Wednesday. Departure delayed every Wednesday for fueling purposes. Next update time Wed Dec 31 at 10:00 AM PST. Last updated Tue Jan 7 at 12:16 PM PST. (DBC-71712)