• Events for West Kootenay
  • Highway 3A Both Directions Highway 3A, in both directions. Blasting between Kuskonook Rest Area and Bathie Rd for 0.3 km (4 km south of Kuskonook). Until Fri Oct 31. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. Expect delays. Up to 20 min delays throughout the day, with scheduled 1 hour closures from 0930-1030 and from and from 1430-1530. Next update time Wed Oct 1 at 10:00 AM PDT. Last updated Wed Sep 3 at 7:05 AM PDT. (DBC-80874)
    Highway 3 Highway 3 (Crowsnest Highway). Watch for falling rocks between Wilgress Lake Rest Area and Granby Rd for 26.1 km (2 km west of Eholt Summit to Grand Forks). Last updated Tue Apr 1 at 4:26 AM PDT. (DBC-73820)
    Highway 3 Highway 3 (Crowsnest Highway). Watch for falling rocks between East Lake Dr and Highway 3B for 39.8 km (Christina Lake to 24 km west of Castlegar). Last updated Tue Apr 1 at 4:26 AM PDT. (DBC-73822)
    Highway 31 Highway 31. Road construction work between Sutton St and Cody Caves Rd for 3.7 km (13 km north of Balfour to 16 km south of Kaslo). For a month. Single lane alternating traffic. Next update time Mon Sep 8. Last updated Tue Aug 26 at 3:05 PM PDT. (DBC-80896)
    Highway 33 Both Directions Highway 33, in both directions. Utility work between Beaverdell Station Rd and Carmi Station for 5.2 km (Beaverdell). Until Fri Sep 12. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. Speed reduction to 60 km/h. Last updated Wed Sep 3 at 11:49 AM PDT. (DBC-79106)
    Highway 3A Both Directions Highway 3A, in both directions. Utility work planned between Riondel Rd and Hemlock Rd for 0.7 km (4 km south of Kootenay Bay Ferry Landing). Starting Tue Sep 9 at 8:00 AM PDT until Tue Sep 9 at 3:30 PM PDT. Single lane alternating traffic will be in effect. Last updated Wed Sep 3 at 2:08 PM PDT. (DBC-81171)
    Highway 3A Southbound Highway 3A, southbound. Utility work planned between Birch Rd and Smith Rd for 0.4 km (15 km south of Kootenay Bay Ferry Landing). Starting Fri Sep 5 at 9:00 AM PDT until Fri Sep 5 at 12:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Tue Aug 26 at 3:48 PM PDT. (DBC-80901)
    Highway 6 EW Both Directions Highway 6 EW, in both directions. Tree pruning between Monashee Summit and Ferrie Rd for 7.3 km (18 to 10 km west of Needles). Until Fri Oct 31. From 7:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. No work on Statutory Holidays. Last updated Mon Aug 18 at 9:50 AM PDT. (DBC-80590)
    Highway 6 NS Both Directions Highway 6 NS, in both directions. Construction work planned between Storbo Rd and Pass Creek Rd for 6.9 km (5 km south of Passmore to 2 km west of Playmor Junction). Starting Mon Sep 8 until Sat Oct 25. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic will be in effect. Last updated Fri Aug 22 at 3:16 PM PDT. (DBC-80787)
    Other Roads Southbound Erickson Rd, southbound. Utility work between 11 Ave S and 16 Ave S in Creston. Until Sat Sep 20. From 7:00 AM to 5:00 PM PDT on weekdays. Watch for traffic control. Expect delays. Last updated Wed Jul 30 at 12:46 PM PDT. (DBC-79911)