• Events for Thompson Nicola
  • Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Road construction work between Gladwin Rd and Nicomen River Rd for 1.1 km (10 to 11 km east of Lytton). Single lane alternating traffic. Work will take place from 6:00am-4:30pm PT daily. Expect up to 40 minute delays due to railway crossing / construction activities. Next update time Mon Sep 15 at 10:00 AM PDT. Last updated Tue Aug 19 at 12:24 AM PDT. (DBC-75637)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Blue Lake Rd and Jackass Summit for 7.8 km (Jackass Mountain Summit). Until Fri Sep 5 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on Wednesday, Thursday and Friday. Speed limit 60 km/h. Lane shift will be implemented. Last updated Thu Aug 28 at 10:38 AM PDT. (DBC-80984)
    Highway 1 Eastbound Highway 1 (TransCanada Highway), eastbound. Tree pruning planned between Holman Rd and Miners Bluff Rd for 18.3 km (Kamloops). Starting Tue Sep 9 until Sat Sep 13. From 8:00 AM to 4:00 PM PDT daily. Right lane will be closed. Watch for traffic control personnel. Last updated Fri Aug 29 at 1:09 PM PDT. (DBC-81025)
    Highway 5 Both Directions Highway 5 (Coquihalla South), in both directions. Construction work between Exit 202: Portia and Exit 217: Zopkios Brake Check for 14.0 km (3 km south of Coquihalla Summit to 11 km south of Great Bear Snowshed). Left lane is closed in both directions. 24/7 barrier work. Please obey signage and slow down for workers. RCMP-enforced speed reduction. Next update time Mon Sep 15 at 12:00 PM PDT. Last updated Wed Aug 20 at 12:16 PM PDT. (DBC-79196)
    Highway 5 Both Directions Highway 5 (Coquihalla South), in both directions. Paving operations between Exit 221: Falls Lake Rd and Exit 231: Mine Creek Rd for 6.3 km (3 to 10 km north of Coquihalla Summit). Until Tue Sep 30 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Lane closures in both directions in effect. Watch for traffic control. Dry Gulch Bridge to Henning Bridge. Delays up to 15 minutes for paving. Last updated Mon Jul 21 at 9:19 AM PDT. (DBC-79513)
    Highway 5 Highway 5 (Coquihalla North). Construction work between Exit 286: Merritt - 97C and Exit 315: Helmer Rd for 12.8 km (Merritt). Until Tue Sep 30 at 6:00 PM PDT. Lane Closure. Watch for traffic control. Last updated Wed Jun 25 at 9:23 AM PDT. (DBC-78512)
    Highway 5 Highway 5 (Coquihalla North). Construction work between Exit 315: Helmer Rd and Exit 336: Walloper Interchange for 20.7 km (Surrey Lake Summit). Until Tue Sep 30 at 6:00 PM PDT. Lane Closure. Watch for traffic control. Last updated Wed Jun 25 at 9:28 AM PDT. (DBC-78513)
    Highway 5 Northbound Highway 5 (Coquihalla North), northbound. Road sweeping between Inks Lake Rd and Exit 362: Afton Interchange for 7.7 km (Kamloops). Until Thu Sep 4 at 4:00 PM PDT. Sweeping right side CRB/curbs/bridge decks. Last updated Thu Sep 4 at 6:04 AM PDT. (DBC-81188)
    Highway 5 Northbound Highway 5, northbound. Utility work between Kealty Rd and Walterdale Rd for 2.0 km (15 to 17 km north of Kamloops). Until Thu Sep 4. From 7:00 AM to 5:00 PM PDT daily. Lane Closure. Single lane alternating traffic. Watch for traffic control. Last updated Wed Aug 27 at 11:07 AM PDT. (DBC-80728)
    Highway 5 Both Directions Highway 5, in both directions. Electrical maintenance between Hoirup Rd and Skinner Rd for 3.5 km (7 to 10 km north of Vavenby). Until Thu Sep 4 at 4:00 PM PDT. Single lane alternating traffic. Last updated Tue Aug 26 at 11:31 AM PDT. (DBC-80765)
    Highway 8 Both Directions Highway 8, in both directions. Construction work between Start of Highway 8 and Porcupine Ridge Rd 6 km east of Spences Bridge. Until Sat Nov 15. Single lane alternating traffic. Watch for traffic control. Expect delays. SITE 16, 17, 18, 19. Last updated Tue Aug 26 at 5:25 PM PDT. (DBC-80660)
    Highway 8 Highway 8. Watch for falling rocks between the start of Highway 8 and Dot Ranch Cut-Off Rd West for 34.8 km (Spences Bridge to 29 km west of Merritt). There is debris on the road. Last updated Thu Sep 4 at 2:27 AM PDT. (DBC-72877)
    Highway 8 Highway 8. Construction work between the start of Highway 8 and Porcupine Ridge Rd for 2.6 km (Spences Bridge). Until Fri Sep 5 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. Site 20/21. Last updated Fri Aug 29 at 1:25 PM PDT. (DBC-79173)
    Highway 8 Highway 8. Construction work between the start of Highway 8 and Porcupine Ridge Rd for 0.3 km (Spences Bridge). Until Sat Sep 13 at 5:00 PM PDT. Site 22. Single lane alternating traffic will be in effect 24 hrs. Watch for traffic control personnel and obey traffic signals. Expect delays of 5 to 30-min closures between 7AM to 5PM. Last updated Fri Aug 29 at 1:19 PM PDT. (DBC-80709)
    Highway 8 Highway 8. Construction work between the start of Highway 8 and Porcupine Ridge Rd for 3.3 km (5 to 8 km east of Spences Bridge). Until Sat Sep 6 at 4:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. Site 12 to 15. Last updated Fri Aug 29 at 1:24 PM PDT. (DBC-80708)
    Highway 8 Highway 8. Construction work between the start of Highway 8 and 14 Mile Ranch Rd for 2.7 km (9 to 12 km east of Spences Bridge). Until Mon Sep 15. Single lane alternating traffic. SITE 9/10. 30-min closures between 10am and 2pm daily. Traffic flushed between closures. Emergency vehicles accommodated. Next update time Mon Sep 15 at 9:00 AM PDT. Last updated Mon Aug 25 at 3:42 PM PDT. (DBC-74796)
    Little Fort Ferry Both Directions Little Fort Ferry, in both directions. Maintenance between the start of Little Fort Ferry and the end of Little Fort Ferry for 0.1 km (Little Fort). Until Thu Sep 4 at 4:30 PM PDT. From 7:00 AM to 4:30 PM PDT on Wednesday and Thursday. Intermittent short ferry closres for maintenance. Please call Argo Road Maintenance for more information. Last updated Wed Aug 27 at 4:37 PM PDT. (DBC-80952)
    McLure Ferry Both Directions McLure Ferry, in both directions. Maintenance between McLure Ferry and the end of McLure Ferry for 0.1 km (McLure). Until Thu Sep 4 at 4:30 PM PDT. From 7:00 AM to 4:30 PM PDT on Wednesday and Thursday. Intermittent short ferry closures for maintenance. For more information, please call Argo Road Maintenance. Last updated Wed Aug 27 at 4:39 PM PDT. (DBC-80951)
    Other Roads Both Directions Shuswap Road, in both directions. Construction work between Sun Rivers Drive and Harper Ranch Pinantan near Kamloops. Until Tue Sep 30 at 5:00 PM PDT. Single lane alternating traffic. Expect minor delays. Last updated Mon Jul 28 at 3:37 PM PDT. (DBC-79824)
    Other Roads Iron Mtn Road. Road construction work between Start and 3K. Until Thu Sep 10, 2026. From 7:00 AM to 3:30 PM PDT on Monday, Tuesday, Wednesday and Thursday. Expect minor delays. Last updated Wed Sep 3 at 6:07 AM PDT. (DBC-80398)
    Other Roads Both Directions Sun Peaks Rd, in both directions. Road construction work between Cahilty Cres and Sun Peaks Municipal Boundary. Until Wed Sep 10. From 6:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Last updated Fri Aug 29 at 1:23 PM PDT. (DBC-81026)
    Other Roads Both Directions Rey Lake Road, in both directions. Utility work between Highway 97C and End of Road. Until Fri Oct 31 at 7:00 AM PDT. Road closed. Full closure for powerline upgrades to Highland Valley Mine. Last updated Wed Sep 3 at 12:01 PM PDT. (DBC-81166)