Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between Gladwin Rd and Nicomen River Rd for 1.1 km (10 to 11 km east of Lytton). Single lane alternating traffic. Work will take place from 4:00am-4:30pm and 6:00pm-4:00am PT daily. Expect up to 40 minute delays due to railway crossing / construction activities. Next update time Mon Sep 15 at 10:00 AM PDT. Last updated Tue Jul 8 at 10:09 AM PDT. (DBC-75637) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work planned between Gladwin Rd and Nicomen River Rd (10 km east of Lytton). Starting Tue Jul 22 at 10:00 PM PDT until Wed Jul 23 at 9:00 AM PDT. Road closure planned. Watch for traffic control personnel. Tank Hill Project. Emergency vehicles accommodated as required. Next update time Wed Jul 23 at 9:00 AM PDT. Last updated Fri Jul 18 at 8:27 AM PDT. (DBC-79324) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work planned between Tunkwa Lake Rd and Six Mile Hill Rd for 1.7 km (23 to 25 km west of Kamloops). Starting Tue Aug 19 until Fri Aug 22. From 8:00 AM to 4:00 PM PDT daily. Lane closures in both directions planned. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Thu Jul 17 at 1:34 PM PDT. (DBC-79389) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Crack sealing is underway between Summit Dr and Valleyview Dr for 3.9 km (Kamloops). Until Tue Jul 22 at 7:00 AM PDT. From 7:00 PM to 7:00 AM PDT on weekdays and Saturday. Lane closures in both directions in effect. Watch for traffic control. Expect delays. Last updated Wed Jul 16 at 1:40 PM PDT. (DBC-79331) |
Highway 5 Both Directions |
Highway 5 (Coquihalla South), in both directions. Construction work between Exit 202: Portia and Exit 217: Zopkios Brake Check for 14.0 km (3 km south of Coquihalla Summit to 11 km south of Great Bear Snowshed). Left lane is closed in both directions. 24/7 barrier work. Please obey signage and slow down for workers. RCMP-enforced speed reduction. Next update time Wed Aug 20 at 12:00 PM PDT. Last updated Mon Jul 14 at 10:47 AM PDT. (DBC-79196) |
Highway 5 |
Highway 5 (Coquihalla North). Construction work between Exit 286: Merritt - 97C and Exit 315: Helmer Rd for 12.8 km (Merritt). Until Tue Sep 30 at 6:00 PM PDT. Lane Closure. Watch for traffic control. Last updated Wed Jun 25 at 9:23 AM PDT. (DBC-78512) |
Highway 5 |
Highway 5 (Coquihalla North). Construction work between Exit 315: Helmer Rd and Exit 336: Walloper Interchange for 20.7 km (Surrey Lake Summit). Until Tue Sep 30 at 6:00 PM PDT. Lane Closure. Watch for traffic control. Last updated Wed Jun 25 at 9:28 AM PDT. (DBC-78513) |
Highway 5 Both Directions |
Highway 5, in both directions. Construction work between River St and Paul Lake Rd for 4.9 km (Kamloops). Until Mon Sep 1. City of Kamloops bridge work on Overlanders Bridge. Expect delays due to congestion. Last updated Tue Jul 15 at 11:13 AM PDT. (DBC-79234) |
Highway 5 |
Highway 5. Construction work between Webb Rd and Mount Olie St for 1.9 km (Little Fort). Until Thu Jul 31. From 7:00 AM to 5:30 PM PDT on weekdays. Lane closures in both directions in effect. Single lane alternating traffic. Watch for traffic control. Last updated Wed Jul 9 at 11:43 AM PDT. (DBC-79014) |
Highway 8 |
Highway 8. Watch for falling rocks between the start of Highway 8 and Dot Ranch Cut-Off Rd West for 34.8 km (Spences Bridge to 29 km west of Merritt). There is debris on the road. Last updated Tue Jul 15 at 3:38 AM PDT. (DBC-72877) |
Highway 8 |
Highway 8. Construction work between the start of Highway 8 and Porcupine Ridge Rd for 12.8 km (Spences Bridge). Until Thu Jul 31. Single lane alternating traffic. SITE 9/10. Up to 30-min closures may occur between 10am-2pm daily. Next update time Thu Jul 31 at 2:00 PM PDT. Last updated Wed Jul 2 at 4:02 PM PDT. (DBC-74796) |
Highway 8 |
Highway 8. Construction work between the start of Highway 8 and Porcupine Ridge Rd for 2.6 km (Spences Bridge). Until Fri Jul 25. From 5:00 AM to 3:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. Expect delays. Site 20/21. Last updated Sat Jul 19 at 7:21 PM PDT. (DBC-79173) |
Highway 97C Both Directions |
Highway 97C (Okanagan Connector), in both directions. Paving operations between Loon Lake Rd and Kane Valley Rd for 12.0 km (22 to 34 km east of Merritt). Until Tue Aug 26. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Watch for traffic control. Expect delays up to 15 min. Last updated Wed Jul 2 at 3:13 PM PDT. (DBC-78753) |