• Events for Rocky Mountain East Kootenay
  • Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Illecillewaet Brake Check and MacDonald Snowshed for 3.0 km (5 to 2 km west of West Boundary of Glacier National Park). Expect 30-min closures from 7pm-8am and 2-hour closures from 2:30am-4:30am, Monday night to Saturday night. Intermittent stoppages may occur. Next update time Fri Aug 1 at 12:00 PM PDT. Last updated Sun Jun 29 at 7:07 AM PDT. (DBC-73974)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Construction work between Woods OH Bridge and Boulder Mtn Avalanche Gate for 4.2 km (8 to 12 km west of Revelstoke). Until Sun Aug 31. From 7:00 PM to 7:00 AM PDT daily. Single lane alternating traffic with a 4 meter width restriction. Speed reduction to 30km/h during construction. Last updated Tue May 20 at 5:08 PM PDT. (DBC-75826)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Bridge construction at Meadows in the Sky Pkwy (Revelstoke). Until Fri Oct 31. Watch for traffic control. Lane Closure. Expect speed reductions to 50km/hr. Lane width restricted to 4m. No work on long weekends. Last updated Thu Jun 12 at 1:18 PM PDT. (DBC-76584)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Road maintenance work planned between Oak Dr and Greely Rd for 5.3 km (Revelstoke). Starting Mon Jul 21 at 8:00 PM PDT until Tue Jul 22 at 6:00 AM PDT. Single lane alternating traffic will be in effect. Last updated Wed Jul 16 at 10:01 AM PDT. (DBC-79322)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Road construction work between Hemlock Grove Boardwalk and Illecillewaet Campground for 0.6 km (8 to 9 km east of West Boundary of Glacier National Park). Until Fri Oct 31. From 7:00 AM to 7:00 PM PDT daily. Culvert replacement work. Speed limit 50km/h at all times due to narrowing/realignment requirements. Last updated Fri Jul 11 at 4:20 PM PDT. (DBC-79076)
    Highway 1 Highway 1 (TransCanada Highway). Rest area closed at Redgrave Rest Area (14 km east of East Boundary of Glacier National Park). Redgrave rest area is permanently closed. New rest area will be built just west of the current location. Stay tuned for more updates as construction progresses. Last updated Wed May 21 at 10:39 AM MDT. (DBC-73964)
    Highway 1 Both Directions Highway 1 (TransCanada Highway), in both directions. Road construction work between Redgrave and Wiseman Rd for 6.0 km (15 to 21 km east of East Boundary of Glacier National Park). Until Sat Nov 15. Watch for traffic control. Expect minor delays. Construction zone reduced speed limit in effect. Lane widths are 5 metres each direction. Watch for crews and expect delays. Next update time Fri Aug 22 at 10:00 AM MDT. Last updated Sat Jul 5 at 10:01 AM MDT. (DBC-75437)
    Highway 23 Both Directions Highway 23, in both directions. Special event planned between Junction Highway 1 and Cleland Rd for 0.5 km (Revelstoke). Starting Wed Jul 30 at 11:00 AM PDT until Wed Jul 30 at 2:30 PM PDT. Traffic control training. Expect minor delays. Last updated Fri Jun 20 at 11:28 AM PDT. (DBC-78321)
    Highway 23 Both Directions Highway 23, in both directions. Utility work planned between Maley Rd and Revelstoke Dam Avalanche Gates for 0.2 km (Revelstoke). Starting Mon Jul 28 until Fri Aug 1. From 8:00 AM to 8:00 PM PDT daily. Right lane will be closed. Work will continue after the long weekend from August 5-8. Last updated Sat Jul 19 at 11:03 PM PDT. (DBC-79390)
    Highway 23 Both Directions Highway 23, in both directions. Utility work planned between Wallis Rd and Goldstream River Bridge for 23.9 km (47 km south of Mica Dam to 68 km north of Revelstoke). Starting Mon Jul 21 until Fri Jul 25. From 8:00 AM to 6:00 PM PDT daily. Single lane alternating traffic will be in effect. Speed reduction to 50km/h. Last updated Tue Jul 8 at 8:38 AM PDT. (DBC-78898)
    Highway 3 Highway 3 (Crowsnest Highway). Maintenance planned between Peavine Bridge and Jim Smith Lake Rd for 19.0 km (9 km east of Moyie to Cranbrook). Starting Mon Jul 21 at 6:00 AM MDT until Tue Jul 22 at 7:00 PM MDT. Single lane alternating traffic will be in effect. Last updated Mon Jul 14 at 9:57 AM MDT. (DBC-79189)
    Highway 3 Both Directions Highway 3 (Crowsnest Highway), in both directions. Paving operations at Cedar Ave (Fernie). Until Mon Sep 15. From 9:00 AM to 3:00 PM MDT daily. Road maintenance work. Work on shoulders. Watch for crews and traffic control. Last updated Tue Jul 15 at 6:50 PM MDT. (DBC-79287)
    Highway 93 Both Directions Highway 93, in both directions. Construction work between Radium Hill Rd and Stanley St for 3.1 km (Radium Hot Springs). Until Sat Jul 26 at 7:00 AM MDT. Traffic reduced from 70 km/hr to 50 km/hr 24/7 on weekdays and Saturdays. Single lane alternating traffic July 21st to 25th from 7PM to 7AM. Last updated Sun Jul 20 at 1:22 PM MDT. (DBC-73931)
    Highway 95A Southbound Highway 95A, southbound. Road construction work planned between Jennings Ave and St. Marys Ave for 0.1 km (Kimberley). Starting Fri Jul 25 until Mon Jul 28. From 7:00 AM to 6:00 PM MDT on Monday and Friday. Watch for traffic control personnel. New curb installation. Last updated Tue Jul 15 at 2:40 PM MDT. (DBC-79274)
    Upper Arrow Lake Ferry Upper Arrow Lake Ferry. Departure delayed between Shelter Bay and Galena Bay. From 8:45 AM to 11:00 AM PST on Wednesday. Departure delayed every Wednesday for fueling purposes. Next update time Wed Dec 31 at 10:00 AM PST. Last updated Tue Jan 7 at 12:16 PM PST. (DBC-71712)