Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Industrial traffic may slow or block regular traffic. Between Exit 37: Gaglardi Way and Exit 40: Brunette Ave for 3.2 km (Burnaby to Coquitlam). Starting Fri Jun 6 at 9:30 PM PDT until Sat Jun 7 at 7:00 AM PDT. Lane Closure. Loading of material to and from Millennium Line for project. Next update time Sat Jun 7 at 7:00 AM PDT. Last updated Fri May 23 at 9:12 PM PDT. (DBC-76898) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Construction work at Exit 73 (Langley - District). Until Wed Dec 31 at 7:00 AM PDT. Exit ramp is closed. Current Westbound off-ramp loop will be closed. A new off-ramp will be opened before the overpass. The traveling public will exit the highway and turn left or right onto 264th Street. Next update time Wed Dec 31 at 7:00 AM PDT. Last updated Thu May 22 at 2:58 PM PDT. (DBC-76914) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work at Exit 165: Flood Rd (Hope). Lane Closure. Exit ramp is closed. Expect delays. Eastbound exit 165 closed, use exit 168. Next update time Fri May 30 at 9:00 AM PDT. Last updated Fri May 9 at 9:28 AM PDT. (DBC-73987) |
Highway 13 Southbound |
Highway 13, southbound. Construction work between the end of Highway 13 and 52 Ave for 0.9 km (Langley - District). Until Thu Jul 31. Entrance ramp closed. Eastbound Highway 1 entrance loop is closed. Eastbound exit ramp from Highway 1 onto 264th is open. Through lane after the exit loop is closed. In effect 24/7. Next update time Thu Jul 31 at 12:00 PM PDT. Last updated Sun Apr 13 at 6:26 AM PDT. (DBC-74478) |
Highway 1 |
Highway 1 (TransCanada Highway). Bridge maintenance planned at Exit 2: Eagleridge Dr (West Vancouver). Starting Wed May 28 at 10:00 PM PDT until Thu May 29 at 5:00 AM PDT. Right lane will be blocked. Left lane will be blocked. Watch for traffic control personnel. Overpass washing. Last updated Fri May 23 at 5:05 PM PDT. (DBC-77022) |
Highway 1 |
Highway 1 (TransCanada Highway). Bridge maintenance between Exit 3 and Westport Rd (West Vancouver). Until Tue May 27 at 5:00 AM PDT. From 10:00 PM to 5:00 AM PDT on Sunday and Monday. Right lane closed. Bridge Washing.
Westbound work: May 25th 10 PM to 5 AM. Eastbound work: May 26th 10 PM to 5 AM. Last updated Fri May 23 at 5:18 PM PDT. (DBC-77020) |
Highway 1 |
Highway 1 (TransCanada Highway). Bridge maintenance planned between Exit 4: Headland Dr and Almondel Rd (West Vancouver). Starting Thu May 29 at 10:00 PM PDT until Fri May 30 at 5:00 AM PDT. Right lane will be blocked. Left lane will be blocked. Watch for traffic control personnel. Overpass washing. Last updated Fri May 23 at 5:14 PM PDT. (DBC-77023) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between 216th St and Exit 73 for 9.3 km (Langley - District). Until Mon Jun 30. From 8:30 PM to 8:00 AM PDT on weekends and from 8:30 PM to 5:30 AM PDT on weekdays. Night time construction work. Lane closures in both directions in effect. No work on long weekends. Last updated Fri May 23 at 11:09 PM PDT. (DBC-74277) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Road construction work at Exit 73 (Langley - District). Until Sat May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT on weekdays and Saturday. Shoulder maintenance. Exit ramp work on shoulder. Last updated Tue Apr 1 at 4:32 PM PDT. (DBC-74748) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Maintenance at Exit 73 (Langley - District). Until Sat May 31 at 7:00 AM PDT. From 9:00 PM to 7:00 AM PDT on Saturday and from 9:00 PM to 5:30 AM PDT on weekdays. Shoulder closed. Last updated Tue Apr 1 at 4:43 PM PDT. (DBC-74751) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Rest area closed at Bradner Rd (Abbotsford). Construction work. For more information on the closure, please refer to Highway 1 Project page: gov.Bc.Ca/264toHighway11#bradner. Next update time Sat Jul 26, 2025 at 9:00 AM PDT. Last updated Thu Sep 26 at 7:34 PM PDT. (DBC-66582) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Maintenance planned between Exit 120: Young Rd and Gibson Rd Uturn for 3.2 km (Chilliwack). Starting Wed May 28 until Thu May 29 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on Wednesday and Thursday. Right lane will be blocked. Last updated Fri May 23 at 4:19 PM PDT. (DBC-77014) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Maintenance planned between Exit 123: Prest Rd and Gibson Rd Uturn for 3.2 km (Chilliwack). Starting Mon May 26 until Fri Jun 27 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays. Shoulder will be closed. Last updated Fri May 23 at 4:28 PM PDT. (DBC-77015) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Maintenance planned between Exit 138: Bridal Falls Rd and Wahleach Access Rd for 1.2 km (7 to 9 km east of Chilliwack). Starting Mon Jun 30 at 9:00 AM PDT until Fri Jul 11 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on weekdays. Right lane will be closed. Shoulder will be closed. Speed limit reduced to 80km/h. No work permitted on Fridays or Mondays of a long weekend. Last updated Fri May 23 at 4:18 PM PDT. (DBC-77013) |
Highway 10 Both Directions |
Highway 10, in both directions. Utility work at 72 Ave (Langley - District). Until Sun Jun 15 at 4:00 PM PDT. From 8:00 AM to 4:00 PM PDT daily. Shoulder maintenance. On and off-ramps from 232nd street will be impacted by work. Watch for crews and pass with caution. Last updated Fri Mar 21 at 1:27 PM PDT. (DBC-74278) |
Highway 101 Westbound |
Highway 101, westbound. Electrical maintenance planned between Hallowell Rd and Egmont Rd for 5.2 km (40 to 45 km west of Sechelt). Starting Mon May 26 at 8:00 AM PDT until Mon May 26 at 5:00 PM PDT. Utility work planned. Right lane will be blocked. Last updated Tue May 13 at 9:47 AM PDT. (DBC-76576) |
Highway 101 Westbound |
Highway 101, westbound. Utility work planned between Nestman Rd and Selma Park Rd for 0.9 km (Sechelt). Starting Thu Jul 3 until Sat Jul 19 at 4:00 PM PDT. From 8:00 AM to 4:00 PM PDT daily. Right lane will be closed. Single lane alternating traffic will be in effect. Last updated Mon Apr 21 at 12:10 PM PDT. (DBC-72411) |
Highway 101 Both Directions |
Highway 101, in both directions. Utility work planned between Field Rd and McCullough Rd (Sechelt). Starting Tue Jun 3 at 7:30 AM PDT until Tue Jun 3 at 5:00 PM PDT. Lane Closure. Watch for traffic control personnel. Expect delays. Last updated Fri May 16 at 4:31 PM PDT. (DBC-76735) |
Highway 11 Both Directions |
Highway 11, in both directions. Utility work planned between McConnell Rd and McClary Ave for 0.7 km (Abbotsford). Starting Mon Jun 2 until Tue Jun 17 at 4:00 PM PDT. From 8:00 AM to 4:00 PM PDT daily. Right lane will be closed. Last updated Wed May 21 at 4:26 PM PDT. (DBC-76909) |
Highway 11 Northbound |
Highway 11, northbound. Bridge maintenance between Riverside St and London Ave Overpass for 1.9 km (Abbotsford to Mission). Until Fri May 30. From 9:00 PM to 6:30 AM PDT on weekends and from 9:00 PM to 5:30 AM PDT on weekdays. Alternating lane closures. Watch for traffic control and expect delays. Last updated Thu May 1 at 9:13 AM PDT. (DBC-76050) |
Highway 11 Southbound |
Highway 11, southbound. Bridge maintenance between London Ave Overpass and Riverside St for 2.6 km (Mission to Abbotsford). Until Fri May 30 at 5:30 AM PDT. From 9:00 PM to 6:30 AM PDT on Saturday and from 9:00 PM to 5:30 AM PDT on weekdays. Alternating lane closures. Watch for traffic control and expect delays. Last updated Wed May 21 at 8:08 AM PDT. (DBC-76875) |
Highway 13 Both Directions |
Highway 13, in both directions. Construction work at 56 Ave (Langley - District). Until Thu Jul 31 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT daily. Detour in effect. Entrance ramp closed. Last updated Mon Apr 21 at 12:10 PM PDT. (DBC-74197) |
Highway 15 Southbound |
Highway 15 (Pacific Highway), southbound. Utility work between 60 Ave and 58 Ave for 0.1 km (Surrey). Until Mon Jun 30 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT daily. Shoulder closed. Right lane closed. Southbound sidewalk closed. Pedestrians must cross at 60 Ave or 58 Ave. Last updated Mon Apr 21 at 12:17 PM PDT. (DBC-75355) |
Highway 15 Both Directions |
Highway 15 (Pacific Highway), in both directions. Road construction work at 60 Ave (Surrey). Until Tue May 27 at 6:00 AM PDT. From 8:00 PM to 6:00 AM PDT daily. Right turn lane closed. Left turn lane closed. Last updated Wed May 14 at 1:20 PM PDT. (DBC-76631) |
Highway 15 Northbound |
Highway 15 (Pacific Highway), northbound. Construction work between 68A Ave and Fraser Hwy for 1.1 km (Surrey). Until Mon Jun 30. From 9:30 PM to 5:30 AM PDT daily. Right lane closed. Shoulder closed. Watch for traffic control. Last updated Fri May 23 at 3:09 PM PDT. (DBC-77008) |
Highway 17 Westbound |
Highway 17, westbound. Construction work planned between Grace Rd and Highway 91 Connector for 0.2 km (Delta to Surrey). Starting Tue May 27 until Wed May 28. From 8:00 AM to 2:00 PM PDT on Tuesday and Wednesday. Right turn lane will be closed. Shoulder will be closed. Last updated Thu May 15 at 2:48 PM PDT. (DBC-76687) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Construction work between Second Avalanche Gate and Allison Pass Summit for 7.9 km (33 to 40 km east of Hope). Until Mon Dec 1 at 7:00 PM PDT. From 6:00 AM to 7:00 PM PDT on weekdays. Expect delays. Lane Closure. Temporary detour at Snass Creek Bridge. Last updated Mon Apr 21 at 12:32 PM PDT. (DBC-74724) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 287 St for 3.9 km (Maple Ridge). Until Sat May 31 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT daily. Watch for traffic control. May 20 - May 24, May 26 - May 31. Construction speed zone 50km/hr. WB right turn to 272nd St closed. Detour at 263rd. Last updated Thu May 22 at 5:09 AM PDT. (DBC-70968) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Construction work between Madaris Rd and Rowan Rd for 2.1 km (2 to 4 km east of Mission). Until Sat May 31. From 7:00 PM to 6:00 AM PDT daily. Watch for traffic control. Last updated Thu Apr 24 at 7:52 AM PDT. (DBC-75710) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Utility work between Madaris Rd and Rowan Rd for 2.0 km (4 to 2 km east of Mission). Until Sat May 31 at 3:00 PM PDT. Watch for traffic control. No work during the long weekend. Last updated Mon May 5 at 4:09 PM PDT. (DBC-76211) |
Highway 7B |
Highway 7B (Mary Hill Bypass). Construction work between Broadway St and Coast Meridian Rd (Port Coquitlam). Until Thu Jul 31. Lane Closure. Bus Stop Improvement project. Last updated Mon May 12 at 3:38 PM PDT. (DBC-76533) |
Highway 7B Both Directions |
Highway 7B (Mary Hill Bypass), in both directions. Construction work between Kingsway Ave and the end of Highway 7B (Mary Hill Bypass) for 0.8 km (Port Coquitlam). Until Fri Jun 13 at 2:00 PM PDT. From 9:00 AM to 2:00 PM PDT daily. Lane closures in both directions in effect. Bus stop improvement project. Last updated Wed May 7 at 11:38 AM PDT. (DBC-76317) |
Highway 9 Northbound |
Highway 9, northbound. Utility work planned between Morrow Rd and Park St for 0.3 km (Kent). Starting Wed Jun 4 at 9:00 AM PDT until Wed Jun 4 at 3:00 PM PDT. Right lane will be closed. Last updated Thu May 15 at 9:47 AM PDT. (DBC-76670) |
Highway 9 Both Directions |
Highway 9, in both directions. Paving operations planned between Bristol Dr and Morrow Rd for 0.3 km (Kent). Starting Fri Jun 20 until Mon Jun 30 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT daily. Lane Closure. Last updated Thu May 22 at 10:41 AM PDT. (DBC-76950) |
Highway 99 Southbound |
Highway 99, southbound. Utility work between Exit 26 and 112 St for 4.9 km (Delta). Until Mon Jun 16. From 12:00 AM to 12:00 AM PDT daily. Right turn lane closed. Watch for traffic control. Expect delays. No closures on the long weekend. Last updated Wed May 14 at 4:13 PM PDT. (DBC-76647) |
Highway 99 Southbound |
Highway 99, southbound. Construction work between Exit 26 and Exit 20 for 1.8 km (Delta). Until Mon Jun 16. Right lane is blocked. Last updated Thu May 1 at 2:28 PM PDT. (DBC-76066) |
Highway 99 Southbound |
Highway 99, southbound. Construction work planned between Exit 28 and Exit 26 for 1.5 km (Delta). Starting Mon May 26 at 9:30 PM PDT until Wed May 28 at 5:30 AM PDT. Right lane will be closed. Last updated Wed May 7 at 3:15 PM PDT. (DBC-76330) |
Highway 99 Northbound |
Highway 99, northbound. Paving operations planned between Exit 28 and Massey Tunnel for 2.2 km (Richmond to Delta). Starting Sun May 25 at 10:00 PM PDT until Mon May 26 at 5:00 AM PDT. Lane Closure. Watch for traffic control personnel. Last updated Fri May 23 at 1:29 PM PDT. (DBC-77001) |
Highway 99 Northbound |
Highway 99, northbound. Paving operations planned between Blundell Rd and Exit 36: Westminster Hwy for 1.6 km (Richmond). Starting Mon May 26 at 10:00 PM PDT until Tue May 27 at 5:00 AM PDT. Right lane will be closed. Exit ramp will be closed. Detour planned. Watch for traffic control personnel. Last updated Fri May 23 at 1:33 PM PDT. (DBC-77002) |
Highway 99 Southbound |
Highway 99, southbound. Bridge maintenance planned at Exit 3: Horseshoe Bay Junction (West Vancouver). Starting Tue May 27 at 10:00 PM PDT until Wed May 28 at 5:00 AM PDT. Left lane will be closed. Overpass washing. Last updated Fri May 23 at 5:01 PM PDT. (DBC-77021) |
Highway 99 Northbound |
Highway 99, northbound. Utility work planned between Spring Creek Dr and Alta Lake Rd for 1.6 km (Whistler). Starting Mon May 26 at 9:00 AM PDT until Fri May 30 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT daily. BC Hydro equipment inspection and pole replacement. Watch for crews working. Last updated Fri May 9 at 4:45 PM PDT. (DBC-76439) |
Highway 99 Both Directions |
Highway 99, in both directions. Utility work planned between Lorimer Rd and Nancy Greene Dr for 0.6 km (Whistler). Starting Mon May 26 at 9:00 AM PDT until Fri May 30 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT daily. BC Hydro equipment inspection and pole replacement. Watch for crews working. Last updated Fri May 9 at 4:45 PM PDT. (DBC-76437) |
Highway 99 Both Directions |
Highway 99, in both directions. Construction work between Park St and Portage Rd for 0.5 km (Pemberton). Until Sat Aug 30. From 7:30 AM to 4:30 PM PST daily. Right turn lane off Hwy 99 and left turn lane onto Hwy 99 from existing access road are affected. Construction access and heavy truck access. Last updated Tue Mar 4 at 10:48 AM PST. (DBC-73529) |
Highway 99 Southbound |
Highway 99, southbound. Maintenance planned between Seymour Rd and Portage Rd for 11.5 km (Pemberton). Starting Thu Jun 5 until Fri Jun 13. From 7:00 AM to 4:00 PM PDT daily. Right lane will be closed. Last updated Fri May 23 at 4:36 PM PDT. (DBC-77017) |
Highway 99 Southbound |
Highway 99, southbound. Maintenance planned between XitOlacw Rd and Rancheree St for 6.5 km (Pemberton to 7 km north of Pemberton). Starting Thu Jun 5 until Fri Jun 13. From 7:00 AM to 4:00 PM PDT daily. Left lane will be closed. Last updated Fri May 23 at 4:42 PM PDT. (DBC-77018) |
Highway 99 Southbound |
Highway 99, southbound. Maintenance planned between Dyke Rd and Seymour Rd for 2.2 km (8 to 6 km north of Pemberton). Starting Thu Jun 5 until Fri Jun 13. From 7:00 AM to 4:00 PM PDT daily. Southbound lane will be closed. Last updated Fri May 23 at 4:42 PM PDT. (DBC-77019) |
Highway 99 Southbound |
Highway 99, southbound. Maintenance planned between Seton Lake Rd and XitOlacw Rd for 4.5 km (11 to 7 km north of Pemberton). Starting Thu Jun 5 until Fri Jun 13. From 7:00 AM to 4:00 PM PDT daily. Right lane will be closed. Last updated Fri May 23 at 4:36 PM PDT. (DBC-77016) |
Other Roads Both Directions |
56th Ave, in both directions. Night time construction work between 256th St and Gloucester Way. Until Sat May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT daily. Geotechnical investigation. Lane Closure. Watch for traffic control. Last updated Tue Apr 1 at 4:11 PM PDT. (DBC-74742) |
Other Roads Both Directions |
264th Street, in both directions. Night time construction work between 48 Ave and 58 Ave. Until Sat May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT daily. Geotechnical investigation. Lane Closure. Watch for traffic control. Last updated Tue Apr 1 at 4:22 PM PDT. (DBC-74747) |
Other Roads Westbound |
University Blvd, westbound. Geotechnical investigation between Blanca St and Wesbrook Mall 1 km north of Vancouver. Until Fri Jun 6. From 7:30 AM to 7:00 PM PDT daily. Left shoulder closed. Geotechnical investigation on median. Watch for traffic control. Last updated Fri Apr 25 at 11:42 AM PDT. (DBC-75801) |
Other Roads Southbound |
Bradner Rd, southbound. Utility work between Downes Rd and Highway 1 in Abbotsford. Until Sat May 31. From 7:00 AM to 5:00 PM PDT daily. Work taking place underneath Highway 1 from Downes Rd to Downes Rd on Bradner. Last updated Fri Apr 25 at 1:23 PM PDT. (DBC-75811) |
Other Roads Both Directions |
Cypress Bowl Road, in both directions. Road maintenance work between Uplands Way and Cypress Place 1 km north of West Vancouver. Until Sat May 31. From 7:30 AM to 4:00 PM PDT on weekdays. Expect minor delays. Last updated Fri Apr 25 at 4:47 PM PDT. (DBC-75820) |
Other Roads Both Directions |
Main St, in both directions. Utility work planned between Mountain Highway and Phibbs Exchange 1 km north of North Vancouver - District. Starting Tue Jun 3 at 10:00 AM PDT until Tue Jun 3 at 2:00 PM PDT. Right turn lane will be closed. Centre lane will be closed. Watch for traffic control personnel. Last updated Fri May 9 at 4:51 PM PDT. (DBC-76440) |
Other Roads Eastbound |
Chancellor Blvd, eastbound. Utility work between Western Pkwy and Acadia Rd in Vancouver. Until Mon Jun 16. From 7:00 AM to 5:00 PM PDT daily. Shoulder maintenance. Watch for traffic control. Last updated Wed May 14 at 3:06 PM PDT. (DBC-76641) |
Other Roads Eastbound |
Moray Bridge, eastbound. Bridge maintenance at Sea Island Way in Richmond. Until Fri Jun 6 at 2:30 PM PDT. From 6:00 AM to 2:30 PM PDT on weekdays. Lane Closure. Watch for traffic control. Last updated Wed May 21 at 3:25 PM PDT. (DBC-76715) |
Other Roads Westbound |
Mountain Hwy, westbound. Utility work between Oxford St and Main St. Until Mon Jun 2 at 6:00 AM PDT. From 7:00 PM to 6:00 AM PDT daily. Centre lane blocked. Left turn lane closed. Last updated Tue May 20 at 10:08 AM PDT. (DBC-76805) |
Other Roads Both Directions |
Golden Ears Connector, in both directions. Paving operations planned at 177A St. Starting Mon May 26 at 7:00 PM PDT until Fri May 30 at 6:00 AM PDT. From 7:00 AM to 6:00 AM PDT on weekdays. Right lane will be closed in both directions. Last updated Fri May 23 at 9:38 AM PDT. (DBC-76995) |
Other Roads Both Directions |
Golden Ears Connector, in both directions. Paving operations planned between 177A St. And 179 St. Starting Mon May 26 at 7:00 PM PDT until Fri May 30 at 6:00 AM PDT. From 7:00 PM to 6:00 AM PDT on weekdays. Right lane will be closed in both directions. Last updated Fri May 23 at 9:47 AM PDT. (DBC-76996) |
Other Roads |
Deltaport Way. Bridge maintenance planned between 41b St and 27b Ave. Starting Sun May 25 at 11:00 PM PDT until Mon May 26 at 5:00 AM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Bridge cleaning on Roberts Bank Overhead bridge structure. Last updated Fri May 23 at 2:50 PM PDT. (DBC-77007) |