Highway 1 |
Highway 1 (TransCanada Highway). Paving operations between Cassiar Tunnel and Exit 29: Willingdon Ave for 3.8 km (Vancouver to Burnaby). Until Mon Sep 15. From 7:00 PM to 7:00 AM PDT on weekdays and Sunday. Traffic down to 1 lane each way. Westbound paving 7PM- 5AM. Eastbound paving 7PM-7AM. Follow construction signage and watch for crews. Next update time Mon Sep 15 at 7:00 AM PDT. Last updated Mon Jul 14 at 6:28 PM PDT. (DBC-79054) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Construction work at Exit 27: E 1st Ave (Vancouver). Until Mon Aug 4 at 11:45 PM PDT. Entrance ramp closed. Watch for traffic control. Pedestrian crossing upgrades. Next update time Mon Aug 4 at 11:45 PM PDT. Last updated Fri Jul 18 at 6:08 AM PDT. (DBC-78794) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Paving operations at Exit 33: Kensington Ave (Burnaby). Until Sun Aug 31. Exit ramp is closed. One northbound lane on Kensington Avenue will be closed. Next update time Sun Aug 31. Last updated Mon Jul 7 at 7:00 AM PDT. (DBC-77926) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Road cleared at Exit 33: Kensington Ave (Burnaby). Last updated Sun Jul 20 at 7:31 PM PDT. (DBC-79493) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Industrial traffic may slow or block regular traffic. Between 248 St and Bradner Rd for 7.2 km (Langley - District to Abbotsford). Until Thu Jul 31 at 4:30 AM PDT. From 11:00 PM to 4:30 AM PDT on weekdays. 20 min closures for crane move. Traffic to be diverted to Exit 73/264 St. Next update time Wed Jul 30 at 9:00 AM PDT. Last updated Wed Jun 11 at 10:04 PM PDT. (DBC-77894) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work between 248 St and Bradner Rd for 6.0 km (Langley - District to Abbotsford). Until Tue Jul 22. From 11:00 PM to 4:30 AM PDT on weekdays. Intermittent full closures required for relocation of hydro lines. Expect up to 20 minutes delay. Next update time Tue Jul 22 at 4:30 AM PDT. Last updated Tue Jul 8 at 2:35 PM PDT. (DBC-78961) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Construction work at Exit 73 (Langley - District). Until Wed Dec 31 at 7:00 PM PDT. Exit ramp is closed. Current Westbound off-ramp loop will be closed. A new off-ramp will be opened before the overpass. The traveling public will exit the highway and turn left or right onto 264th Street. Next update time Wed Dec 31 at 7:00 AM PDT. Last updated Sun Jun 22 at 10:17 AM PDT. (DBC-76914) |
Highway 13 Southbound |
Highway 13, southbound. Construction work between the end of Highway 13 and 52 Ave for 0.9 km (Langley - District). Until Thu Jul 31. Entrance ramp closed. Eastbound Highway 1 entrance loop is closed. Eastbound exit ramp from Highway 1 onto 264th is open. Through lane after the exit loop is closed. In effect 24/7. Next update time Thu Jul 31 at 12:00 PM PDT. Last updated Sun Apr 13 at 6:26 AM PDT. (DBC-74478) |
Highway 99 Both Directions |
Highway 99, in both directions. Construction work between Massey Tunnel and Exit 32: Steveston Hwy for 1.5 km (Richmond). Until Tue Jul 22 at 4:30 AM PDT. From 10:00 PM to 7:00 AM PDT on Friday and Saturday and from 10:00 PM to 4:30 AM PDT on Sunday and Monday. Road closed. Detour with intermittent stoppages. Next update time Tue Jul 22 at 4:30 AM PDT. Last updated Thu Jul 17 at 11:37 AM PDT. (DBC-79293) |
Other Roads Both Directions |
Cypress Bowl Rd, in both directions. Industrial traffic may slow or block regular traffic. Between Uplands Way and Cypress Place in West Vancouver. Until Fri Aug 29. From 7:30 AM to 4:00 PM PDT on weekdays. Watch for traffic control. Expect delays. The westbound right lane will be closed with periodic full closures in 15-30 second intervals. Next update time Fri Aug 29 at 4:00 PM PDT. Last updated Fri May 30 at 6:50 PM PDT. (DBC-77313) |
Other Roads Both Directions |
Main Street, in both directions. Paving operations planned between Mountain Highway and Highway 1. Starting Mon Jul 21 until Sun Aug 24. From 7:00 PM to 5:00 AM PDT daily. Watch for traffic control and detour signage. Expect delays. Eastbound on-ramp closed July 23-25 10pm-5am. Next update time Sun Aug 24 at 6:00 AM PDT. Last updated Wed Jul 16 at 3:58 PM PDT. (DBC-79239) |
Hemlock Valley Rd |
Hemlock Valley Rd. Ditching at Snowmist Dr (2 km south of Sasquatch Mountain Resort). Until Thu Jul 24. From 7:00 AM to 3:00 PM PDT on Monday, Tuesday, Wednesday and Thursday. Single lane alternating traffic. Please watch for traffic control personal. Last updated Thu Jul 17 at 10:18 AM PDT. (DBC-79375) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Utility work planned between Exit 14: Capilano Rd and Exit 13 for 1.5 km (West Vancouver to North Vancouver - District). Starting Mon Jul 21 at 9:00 PM PDT until Fri Aug 8 at 6:00 AM PDT. From 9:00 PM to 6:00 AM PDT daily. Right lane will be blocked. Right turn lane will be closed. BC Hydro and street lighting upgrades. Last updated Fri Jul 18 at 4:46 PM PDT. (DBC-79460) |
Highway 1 |
Highway 1 (TransCanada Highway). Construction work planned at Exit 17: Westview Dr (North Vancouver - City). Starting Mon Aug 11 at 7:00 AM PDT until Wed Aug 27 at 5:00 PM PDT. Build along Westview Drive. No lane closure. Between Westview northbound off ramp and Hwy 1 overpass. Last updated Mon Jul 14 at 4:07 PM PDT. (DBC-79230) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Shoulder maintenance between Exit 19: Lynn Valley Rd and Exit 21: Mountain Hwy for 2.0 km (North Vancouver - District to North Vancouver - City). Until Tue Aug 5. From 7:00 AM to 8:00 PM PDT daily. Last updated Tue Jun 24 at 11:19 AM PDT. (DBC-78472) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work between 216th St and Exit 66: 232nd St for 3.8 km (Langley - District). Until Tue Sep 30. Watch for traffic control. Watch for intermittent lane closures. Last updated Wed Jun 4 at 2:35 PM PDT. (DBC-77541) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Maintenance between Exit 73 and 248 St for 3.8 km (Langley - District). Until Thu Jul 31. From 8:30 PM to 5:00 AM PDT daily. Right turn lane closed. Centre lane closed. Shoulder closed. Work will be taking place east of 248th St and west of Lefeuvre Rd. Last updated Tue Jun 3 at 10:38 AM PDT. (DBC-77479) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work at Exit 73 (Langley - District). Until Wed Dec 31. Exit ramp is closed. Current off-ramp will be closed, new off-ramp will be opened before the overpass. Turn left or right to 56th south from off-ramp. Last updated Thu Jun 19 at 8:12 PM PDT. (DBC-78296) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Exit 73 and Exit 83: Mt Lehman Rd for 3.8 km (Abbotsford). Until Thu Jul 31. From 8:30 PM to 5:30 AM PDT daily. Lane Closure. Highway 1 improvement project. Last updated Fri Jul 4 at 12:19 PM PDT. (DBC-78830) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Rest area closed at Bradner Rd (Abbotsford). Construction work. For more information on the closure, please refer to Highway 1 Project page: gov.Bc.Ca/264toHighway11#bradner. Next update time Sat Jul 26, 2025 at 9:00 AM PDT. Last updated Thu Sep 26 at 7:34 PM PDT. (DBC-66582) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Utility work between Exit 83: Mt Lehman Rd and Bradner Rd for 3.8 km (Abbotsford). Until Wed Aug 13. From 8:00 AM to 4:00 PM PDT daily. Last updated Wed Jun 25 at 11:06 AM PDT. (DBC-78517) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Utility work between Exit 83: Mt Lehman Rd and Bradner Rd (Abbotsford). Until Wed Aug 13. From 8:00 AM to 4:00 PM PDT on weekdays. Shoulder closed. Last updated Wed Jun 25 at 3:21 PM PDT. (DBC-78532) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work between Peardonville Rd and Exit 90: McCallum Rd for 5.0 km (Abbotsford). Until Fri Aug 15. From 9:00 PM to 5:30 AM PDT on weekdays. Lane closures in both directions in effect. Last updated Mon Jul 7 at 1:53 PM PDT. (DBC-78916) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work between Riverside Rd and Exit 92 (Abbotsford). Until Fri Aug 29 at 5:00 AM PDT. From 9:00 PM to 5:30 AM PDT on weekdays. Lane closures in both directions in effect. Lane closures in effect on Hwy 11 and Hwy 1. One lane in each direction will be maintained at all times. Last updated Wed Jul 9 at 12:24 PM PDT. (DBC-78915) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work planned between Exit 90: McCallum Rd and Exit 92 for 1.9 km (Abbotsford). Starting Tue Jul 22 until Thu Jul 24. From 10:00 PM to 5:00 AM PDT daily. Left lane will be blocked. Watch for traffic control personnel. Last updated Fri Jun 20 at 9:47 AM PDT. (DBC-78317) |
Highway 101 Both Directions |
Highway 101, in both directions. Utility work between St. Marys Hospital Dr and Monkey Tree Lane for 0.6 km (Sechelt). Until Sun Jul 27. From 8:00 AM to 4:00 PM PDT on weekdays. Left lane is closed in both directions. Last updated Wed Jun 18 at 9:27 AM PDT. (DBC-78178) |
Highway 11 Northbound |
Highway 11, northbound. Utility work planned between McCallum Rd and Bateman Rd for 1.0 km (Abbotsford). Starting Wed Jul 23 at 9:00 AM PDT until Wed Jul 23 at 3:00 PM PDT. Right lane will be closed. Last updated Thu Jul 17 at 1:03 PM PDT. (DBC-79386) |
Highway 11 Northbound |
Highway 11, northbound. Utility work planned between McCallum Rd and Bateman Rd for 1.0 km (Abbotsford). Starting Mon Sep 8 until Mon Sep 15. From 9:00 AM to 3:00 PM PDT daily. Right lane will be closed. Last updated Thu Jul 17 at 2:23 PM PDT. (DBC-79387) |
Highway 11 Northbound |
Highway 11, northbound. Utility work planned at McCallum Rd (Abbotsford). Starting Tue Sep 23 until Tue Sep 30. From 8:00 AM to 3:00 PM PDT daily. Right lane will be closed. Last updated Thu Jul 17 at 2:22 PM PDT. (DBC-79388) |
Highway 11 Northbound |
Highway 11, northbound. Bridge maintenance between Riverside St and London Ave Overpass for 1.9 km (Abbotsford to Mission). Until Wed Jul 30. From 9:00 PM to 6:30 AM PDT daily. Lane closure in effect. Last updated Thu Jun 26 at 2:44 PM PDT. (DBC-76050) |
Highway 11 Southbound |
Highway 11, southbound. Bridge maintenance between London Ave Overpass and Riverside St for 2.6 km (Mission to Abbotsford). Until Wed Jul 30. From 9:00 PM to 6:30 AM PDT daily. Lane closure with width restriction and speed reduction. Wide loads greater than 3.8m may only cross after 4:30am with 7 days notice. Haulers must contact 604-341-9997 to arrange passage. Last updated Thu Jun 26 at 2:43 PM PDT. (DBC-76875) |
Highway 11 Both Directions |
Highway 11, in both directions. Construction work planned between Matsqui Trail Regional Pk and London Ave Overpass for 1.0 km (Mission to Abbotsford). Starting Mon Jul 21 until Fri Jul 25. From 9:00 PM to 5:00 AM PDT daily. Lane Closure. Last updated Mon Jul 14 at 10:41 AM PDT. (DBC-79200) |
Highway 13 Both Directions |
Highway 13, in both directions. Construction work at 56 Ave (Langley - District). Until Thu Jul 31 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT daily. Detour in effect. Entrance ramp closed. Last updated Mon Apr 21 at 12:10 PM PDT. (DBC-74197) |
Highway 15 Both Directions |
Highway 15 (Pacific Highway), in both directions. Utility work between 20 Ave and 26 Ave for 1.2 km (Surrey). Until Thu Jul 31. From 9:00 PM to 5:00 AM PDT daily. Watch for traffic control. Intermittent lane closures. Last updated Fri Jul 18 at 10:12 AM PDT. (DBC-79104) |
Highway 15 Southbound |
Highway 15 (Pacific Highway), southbound. Road maintenance work between 64 Ave and 60 Ave for 0.7 km (Surrey). Until Sat Jul 26. From 11:00 AM to 2:00 PM PDT on weekdays. Right lane closed. Watch for traffic control. Removal and replacement of sound fence 64 Ave to 61A Ave. Last updated Mon Jul 7 at 12:26 PM PDT. (DBC-77776) |
Highway 15 Both Directions |
Highway 15 (Pacific Highway), in both directions. Maintenance between Highway 10 and 68A Ave for 2.7 km (Surrey). Until Sat Aug 9. From 7:30 AM to 1:30 PM PDT on Saturday. Left lane is closed. Work will take place on Jul 19th, 26th and Aug 9th. Alternating closures in both directions. Watch for traffic control. Last updated Thu Jul 17 at 3:46 PM PDT. (DBC-79408) |
Highway 3 Eastbound |
Highway 3 (Crowsnest Highway), eastbound. Utility work planned between Exit 173: Old Hope Princeton Way and First Avalanche Gate for 5.2 km (Hope). Starting Mon Jul 21 until Fri Aug 1. From 8:00 AM to 4:00 PM PDT daily. Right lane will be blocked. Speed reduction to 70km/h. Last updated Fri Jul 18 at 11:33 AM PDT. (DBC-79448) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Construction work between Second Avalanche Gate and Allison Pass Summit for 7.9 km (33 to 40 km east of Hope). Until Mon Dec 1 at 7:00 PM PDT. From 6:00 AM to 7:00 PM PDT on weekdays. Expect delays. Lane Closure. Temporary detour at Snass Creek Bridge. Last updated Mon Apr 21 at 12:32 PM PDT. (DBC-74724) |
Highway 3 Westbound |
Highway 3 (Crowsnest Highway), westbound. Utility work planned between Allison Pass Summit and Second Avalanche Gate for 14.7 km (40 to 54 km east of Hope). Starting Mon Jul 21 until Fri Aug 1. From 8:00 AM to 4:00 PM PDT daily. Right lane will be closed. Speed reduction to 60 km/h. Last updated Fri Jun 27 at 3:55 PM PDT. (DBC-78628) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Road construction work between Garret Rd and Sunday Summit for 11.3 km (43 to 32 km west of Princeton). Until Fri Oct 31. Single lane alternating traffic. Watch for traffic control. Last updated Tue Jun 10 at 10:05 AM PDT. (DBC-77799) |
Highway 5 Both Directions |
Highway 5 (Coquihalla South), in both directions. Line painting planned between the start of Highway 5 (Coquihalla South) and Exit 183: Othello Rd for 5.1 km (1 to 6 km north of Hope). Starting Tue Jul 22 until Thu Jul 24. From 8:00 PM to 5:00 AM PDT on Tuesday and Wednesday. Expect delays. Lane Closure. Last updated Thu Jul 17 at 3:31 PM PDT. (DBC-79407) |
Highway 5 Southbound |
Highway 5 (Coquihalla South), southbound. Utility work planned between Exit 192 and Exit 183: Othello Rd for 9.0 km (15 to 6 km north of Hope). Starting Mon Jul 21 until Fri Aug 1. From 9:00 AM to 3:00 PM PDT daily. Right lane will be closed. Last updated Fri Jun 27 at 11:12 AM PDT. (DBC-78127) |
Highway 5 Northbound |
Highway 5 (Coquihalla South), northbound. Construction work planned between Exit 183: Othello Rd and Exit 195 for 12.5 km (6 km north of Hope to 16 km south of Great Bear Snowshed). Starting Mon Sep 1 at 6:00 AM PDT until Fri Sep 12 at 6:00 PM PDT. Right lane will be closed. Construction/Rehabilitation work of Exit 195/Carolin Mine Rd between Jessica Bridge and Ladner Creek Bridge. Last updated Mon Jul 14 at 2:54 PM PDT. (DBC-79223) |
Highway 5 |
Highway 5 (Coquihalla South). Construction work planned between Exit 183: Othello Rd and Exit 195 for 3.9 km (15 km north of Hope to 16 km south of Great Bear Snowshed). Starting Mon Aug 4 at 6:00 AM PDT until Mon Aug 11 at 6:00 PM PDT. Right lane will be closed. Construction/rehabilitation works of Exit 195 Carolin Mine Road. Last updated Mon Jul 14 at 2:55 PM PDT. (DBC-79220) |
Highway 5 Northbound |
Highway 5 (Coquihalla South), northbound. Construction work at Exit 195 (16 km south of Great Bear Snowshed). Until Wed Jul 30. From 6:00 AM to 6:00 PM PDT daily. Exit ramp is closed. Last updated Thu Jul 17 at 10:52 AM PDT. (DBC-79376) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 287 St for 3.9 km (Maple Ridge). From 7:00 AM to 5:00 PM PDT daily. Watch for traffic control. July 14-19, 21-26, 27-August 1. No work August 2-4. Construction speed limit 50km/h. Expect delays. Next update time Mon Aug 4 at 3:00 PM PDT. Last updated Mon Jul 14 at 10:59 AM PDT. (DBC-70968) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Construction work between Madaris Rd and Rowan Rd for 2.1 km (2 to 4 km east of Mission). Until Thu Jul 31 at 6:00 AM PDT. From 9:00 PM to 6:00 AM PDT daily. Watch for traffic control. Traffic control to not take place during a long weekend. Last updated Mon Jun 23 at 3:37 PM PDT. (DBC-78435) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Maintenance between Mill Rd and Bodnar Rd for 4.2 km (Kent). Until Wed Aug 6. From 9:00 AM to 3:00 PM PDT daily. Last updated Mon Jul 14 at 1:27 PM PDT. (DBC-79212) |
Highway 7 Westbound |
Highway 7 (Lougheed Highway), westbound. Utility work between Maria Lane and Junction with Highway 9 for 2.6 km (Kent). Until Fri Jul 25. From 9:00 AM to 4:00 PM PDT daily. Centre lane blocked. Watch for traffic control. Last updated Wed Jul 9 at 9:39 AM PDT. (DBC-79005) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Paving operations between Junction with Highway 9 and Ross Rd for 27.9 km (Hope to Kent). Until Fri Aug 15 at 7:00 PM PDT. From 6:30 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Pilot car controlled. Last updated Sat Jul 19 at 4:20 PM PDT. (DBC-79476) |
Highway 7B Westbound |
Highway 7B (Mary Hill Bypass), westbound. Geotechnical investigation planned between Shaughnessy St and United Blvd (Coquitlam). Starting Mon Jul 21 at 8:00 PM PDT until Wed Jul 30. From 8:00 PM to 5:00 AM PDT daily. Left lane will be blocked. Right lane will be blocked. Watch for traffic control personnel. Traffic can pass by using exit merge lane and right shoulder. Last updated Wed Jul 9 at 11:03 AM PDT. (DBC-79013) |
Highway 7B Westbound |
Highway 7B (Mary Hill Bypass), westbound. Construction work between Coast Meridian Rd and Broadway St for 0.6 km (Port Coquitlam). Until Fri Oct 31. From 9:00 AM to 3:00 PM PDT daily. Lane Closure. Bus Stop Improvement project. Last updated Wed Jun 18 at 1:02 PM PDT. (DBC-78197) |
Highway 7B Westbound |
Highway 7B (Mary Hill Bypass), westbound. Construction work between Kingsway Ave and Coast Meridian Rd for 0.5 km (Port Coquitlam). Until Wed Dec 31 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on weekdays. Right lane closed. Bus Stop Improvement project. Next update time Mon Dec 15 at 10:00 AM PDT. Last updated Wed Jul 16 at 10:00 AM PDT. (DBC-78829) |
Highway 9 Northbound |
Highway 9, northbound. Utility work planned between Bristol Dr and Park St for 0.3 km (Kent). Starting Thu Aug 7 at 9:00 AM PDT until Thu Aug 7 at 3:00 PM PDT. Right lane will be closed. Last updated Thu Jul 17 at 12:51 PM PDT. (DBC-79384) |
Highway 9 Both Directions |
Highway 9, in both directions. Utility work between Emerald Ave and Miami River Dr for 1.4 km (Harrison Hot Springs). Until Thu Jul 31. From 8:00 AM to 9:00 PM PDT on Monday, Tuesday, Wednesday and Thursday. Expect delays. Last updated Mon Jul 14 at 4:10 PM PDT. (DBC-79231) |
Highway 9 Both Directions |
Highway 9, in both directions. Utility work planned between Emerald Ave and Miami River Dr for 1.4 km (Harrison Hot Springs). Starting Mon Aug 4 until Fri Aug 29. From 8:00 AM to 9:00 PM PDT on Monday, Tuesday, Wednesday and Thursday. Expect delays. Last updated Mon Jul 14 at 4:11 PM PDT. (DBC-79232) |
Highway 91 Both Directions |
Highway 91, in both directions. Bridge maintenance planned between Exit 15 and Exit 11: Westminster Hwy for 0.3 km (Richmond). Starting Tue Jul 22 at 9:00 PM PDT until Wed Jul 23 at 5:00 AM PDT. Watch for traffic control personnel. Lane closures in both directions planned. Travel directions will be down to 1 lane approaching the bridge. Last updated Thu Jul 17 at 6:55 PM PDT. (DBC-79421) |
Highway 91 Northbound |
Highway 91, northbound. Utility work planned between Exit 8: Nordel Way and River Rd for 0.8 km (Delta). Starting Mon Jul 28 at 8:00 PM PDT until Mon Jul 28 at 11:30 PM PDT. Watch for traffic control personnel. Right on ramp lane blocked. Last updated Thu Jun 26 at 1:27 PM PDT. (DBC-78571) |
Highway 91 Northbound |
Highway 91, northbound. Road maintenance work planned at Exit 1 (Delta). Starting Mon Jul 21 at 9:00 PM PDT until Tue Jul 22 at 5:00 AM PDT. Exit ramp will be closed. Watch for traffic control personnel. Detour planned. Off ramp closed for drainage and sidewalk maintenance. Detour available via exit 4 (64th ave.) Signage will be in place. Last updated Sun Jul 20 at 11:06 AM PDT. (DBC-79436) |
Highway 99 Northbound |
Highway 99, northbound. Special event between the start of Highway 99 and Exit 1: Beach Rd for 0.6 km (British Columbia and Washington Border to Surrey). Until Fri Aug 29. Watch for traffic control. Vessel inspection at Peace Arch Visitor Centre. From 8am-8pm on the following dates: July 18 & 19, Aug 4 & 5, Aug 28 & 29. Last updated Mon Jul 7 at 6:57 AM PDT. (DBC-78210) |
Highway 99 Northbound |
Highway 99, northbound. Construction work between Exit 20 and 72 St for 4.1 km (Delta). Until Fri Aug 22. Shoulder closed. Last updated Thu Jul 17 at 3:25 PM PDT. (DBC-79404) |
Highway 99 Northbound |
Highway 99, northbound. Utility work planned between Denman St and Wren Trail for 0.5 km (Vancouver). Starting Tue Jul 29 at 10:00 PM PDT until Wed Jul 30 at 5:00 AM PDT. Right lane will be closed. Watch for traffic control personnel. Last updated Thu Jul 17 at 6:03 PM PDT. (DBC-79417) |
Highway 99 |
Highway 99. Special event at Lost Lagoon Rd (Vancouver). Until Sat Jul 26. From 6:00 PM to 11:00 PM PDT on Wednesday and Saturday. Traffic restrictions in place for Celebration of Light. Last updated Wed Jul 9 at 3:06 PM PDT. (DBC-79029) |
Highway 99 Both Directions |
Highway 99, in both directions. Construction work between Park St and Portage Rd for 0.5 km (Pemberton). Until Sat Aug 30. From 7:30 AM to 4:30 PM PST daily. Right turn lane off Hwy 99 and left turn lane onto Hwy 99 from existing access road are affected. Construction access and heavy truck access. Last updated Tue Mar 4 at 10:48 AM PST. (DBC-73529) |
Highway 99 Both Directions |
Highway 99, in both directions. Bridge maintenance planned between Lil'wat Pl and Seton Lake Rd (39 km south of Lillooet). Starting Mon Jul 28 at 12:00 PM PDT until Mon Jul 28 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Inspection scheduled for Blowdown Creek Bridge. Last updated Wed Jul 16 at 9:52 AM PDT. (DBC-79321) |
Other Roads |
King George Blvd. Utility work between 58 Ave and 60 Ave. Until Fri Aug 1. From 8:00 AM to 4:00 PM PDT daily. Last updated Mon Jun 23 at 8:49 AM PDT. (DBC-78410) |
Other Roads Eastbound |
Marine Dr, eastbound. Road construction work between Highway 99 and Capilano Rd in North Vancouver - District. Until Mon Sep 15 at 8:00 PM PDT. From 9:00 AM to 5:00 PM PDT on Saturday and from 7:00 AM to 8:00 PM PDT on weekdays. Right lane closed. Shoulder closed. Lane closure to remain overnight. No work on Sundays or holidays. Last updated Mon Jun 23 at 3:13 PM PDT. (DBC-78434) |
Other Roads Both Directions |
Bradner Rd, in both directions. Construction work at Downes Rd in Abbotsford. Until Thu Jul 31. From 12:00 AM to 12:00 PM PDT daily. Single lane alternating traffic. Watch for traffic control. Bradner Rd overpass construction as part of the Fraser Valley Corridor Improvement Program. Last updated Fri Jul 4 at 12:08 PM PDT. (DBC-78827) |
Other Roads Eastbound |
Reed Road, eastbound. Geotechnical investigation planned between Payne Road and Henry Road. Starting Wed Jul 30 at 8:00 AM PDT until Wed Jul 30 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Crews will be sampling soil and groundwater conditions for proposed watermain replacement. Last updated Thu Jul 10 at 1:03 PM PDT. (DBC-79068) |
Other Roads Both Directions |
Marine Dr, in both directions. Utility work between Taylor Way and Capilano Road near West Vancouver. Until Thu Aug 21. From 9:00 PM to 6:00 AM PDT on weekdays. Lane closures in both directions in effect. Last updated Mon Jul 14 at 2:17 PM PDT. (DBC-79218) |
Other Roads Both Directions |
Carolin Mine Rd, in both directions. Construction work planned between Siwash Creek Rd and Shylock Rd. Starting Sun Aug 10 at 6:00 AM PDT until Sun Aug 17 at 6:00 PM PDT. Road closure planned. Construction/Rehabilitation work of Exit 195/Carolin Mine rd between Siwash Creek Rd and Shylock Rd. Last updated Mon Jul 14 at 2:54 PM PDT. (DBC-79221) |
Other Roads Both Directions |
Carolin Mine Rd, in both directions. Construction work planned between Siwash Creek Rd and Shylock Rd. Starting Mon Sep 1 at 6:00 AM PDT until Fri Sep 12 at 6:00 PM PDT. Road closure planned. Construction/Rehabilitation work of Exit 195/Carolin Mine Rd between Siwash Creek Rd and Shylock Rd. Last updated Mon Jul 14 at 3:00 PM PDT. (DBC-79224) |
Other Roads Both Directions |
Front St, in both directions. Construction work between Columbia St and Begbie St in New Westminster. Until Mon Jul 21 at 5:30 AM PDT. Road closed. Front Street Mews and Columbia Street will remain open. Trucks use official routes (excludes Columbia Street at all hours and Royal Avenue after 9:00pm.) Regular traffic use Columbia Street. Last updated Sat Jul 19 at 12:29 AM PDT. (DBC-79381) |
Other Roads |
88 Ave. Road construction work planned between 200 St and 201 St in Langley - City. Starting Tue Jul 22 until Wed Jul 23. From 9:30 PM to 3:30 AM PDT on Tuesday and Wednesday. Overhead sign work with crane. Last updated Thu Jul 17 at 3:22 PM PDT. (DBC-79403) |
Other Roads Both Directions |
Horseshoe Bay Drive, in both directions. Special event planned between Pasco Rd and Marine Dr. Starting Mon Jul 21 at 7:00 PM PDT until Mon Jul 21 at 10:00 PM PDT. Filming work. Watch for traffic control. Last updated Thu Jul 17 at 6:22 PM PDT. (DBC-79419) |