• Events for Highway 99
  • Highway 99 Southbound Highway 99, southbound. Utility work between Exit 26 and 112 St for 4.9 km (Delta). Until Mon Jun 16. From 12:00 AM to 12:00 AM PDT daily. Right turn lane closed. Watch for traffic control. Expect delays. No closures on the long weekend. Last updated Wed May 14 at 4:13 PM PDT. (DBC-76647)
    Highway 99 Southbound Highway 99, southbound. Construction work between Exit 26 and Exit 20 for 1.8 km (Delta). Until Mon Jun 16. Right lane is blocked. Last updated Thu May 1 at 2:28 PM PDT. (DBC-76066)
    Highway 99 Southbound Highway 99, southbound. Construction work planned between Exit 28 and Exit 26 for 1.5 km (Delta). Starting Mon May 26 at 9:30 PM PDT until Wed May 28 at 5:30 AM PDT. Right lane will be closed. Last updated Wed May 7 at 3:15 PM PDT. (DBC-76330)
    Highway 99 Northbound Highway 99, northbound. Paving operations planned between Exit 28 and Massey Tunnel for 2.2 km (Richmond to Delta). Starting Sun May 25 at 10:00 PM PDT until Mon May 26 at 5:00 AM PDT. Lane Closure. Watch for traffic control personnel. Last updated Fri May 23 at 1:29 PM PDT. (DBC-77001)
    Highway 99 Northbound Highway 99, northbound. Paving operations planned between Blundell Rd and Exit 36: Westminster Hwy for 1.6 km (Richmond). Starting Mon May 26 at 10:00 PM PDT until Tue May 27 at 5:00 AM PDT. Right lane will be closed. Exit ramp will be closed. Detour planned. Watch for traffic control personnel. Last updated Fri May 23 at 1:33 PM PDT. (DBC-77002)
    Highway 99 Southbound Highway 99, southbound. Bridge maintenance planned at Exit 3: Horseshoe Bay Junction (West Vancouver). Starting Tue May 27 at 10:00 PM PDT until Wed May 28 at 5:00 AM PDT. Left lane will be closed. Overpass washing. Last updated Fri May 23 at 5:01 PM PDT. (DBC-77021)
    Highway 99 Northbound Highway 99, northbound. Utility work planned between Spring Creek Dr and Alta Lake Rd for 1.6 km (Whistler). Starting Mon May 26 at 9:00 AM PDT until Fri May 30 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT daily. BC Hydro equipment inspection and pole replacement. Watch for crews working. Last updated Fri May 9 at 4:45 PM PDT. (DBC-76439)
    Highway 99 Both Directions Highway 99, in both directions. Utility work planned between Lorimer Rd and Nancy Greene Dr for 0.6 km (Whistler). Starting Mon May 26 at 9:00 AM PDT until Fri May 30 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT daily. BC Hydro equipment inspection and pole replacement. Watch for crews working. Last updated Fri May 9 at 4:45 PM PDT. (DBC-76437)
    Highway 99 Both Directions Highway 99, in both directions. Construction work between Park St and Portage Rd for 0.5 km (Pemberton). Until Sat Aug 30. From 7:30 AM to 4:30 PM PST daily. Right turn lane off Hwy 99 and left turn lane onto Hwy 99 from existing access road are affected. Construction access and heavy truck access. Last updated Tue Mar 4 at 10:48 AM PST. (DBC-73529)
    Highway 99 Southbound Highway 99, southbound. Maintenance planned between Seymour Rd and Portage Rd for 11.5 km (Pemberton). Starting Thu Jun 5 until Fri Jun 13. From 7:00 AM to 4:00 PM PDT daily. Right lane will be closed. Last updated Fri May 23 at 4:36 PM PDT. (DBC-77017)
    Highway 99 Southbound Highway 99, southbound. Maintenance planned between XitOlacw Rd and Rancheree St for 6.5 km (Pemberton to 7 km north of Pemberton). Starting Thu Jun 5 until Fri Jun 13. From 7:00 AM to 4:00 PM PDT daily. Left lane will be closed. Last updated Fri May 23 at 4:42 PM PDT. (DBC-77018)
    Highway 99 Southbound Highway 99, southbound. Maintenance planned between Dyke Rd and Seymour Rd for 2.2 km (8 to 6 km north of Pemberton). Starting Thu Jun 5 until Fri Jun 13. From 7:00 AM to 4:00 PM PDT daily. Southbound lane will be closed. Last updated Fri May 23 at 4:42 PM PDT. (DBC-77019)
    Highway 99 Southbound Highway 99, southbound. Maintenance planned between Seton Lake Rd and XitOlacw Rd for 4.5 km (11 to 7 km north of Pemberton). Starting Thu Jun 5 until Fri Jun 13. From 7:00 AM to 4:00 PM PDT daily. Right lane will be closed. Last updated Fri May 23 at 4:36 PM PDT. (DBC-77016)
    Highway 99 Both Directions Highway 99, in both directions. Rock slope stabilization between Lil'wat Pl and Seton Lake Rd for 0.6 km (15 km south of Lillooet). Until Sat Jun 21 at 5:30 PM PDT. From 7:30 AM to 5:30 PM PDT on weekdays and Saturday. Single lane alternating traffic. The work is 1 KM north of the Cottonwood Rec Site. Rock scaling and slope mesh installation. Last updated Thu Apr 24 at 1:40 PM PDT. (DBC-75530)
    Highway 99 Highway 99. Bridge maintenance between Lil'wat Pl and Texas Creek Rd for 43.0 km (Lillooet). From 6:00 AM to 3:00 PM PDT on Monday, Tuesday and Wednesday. Lane Closure. Expect Bridge Cleaning between Lillooet and Blowdown. Short Delays possible. Last updated Fri Apr 25 at 1:19 PM PDT. (DBC-75810)