• Events for Highway 8
  • Highway 8 Both Directions Highway 8, in both directions. Construction work between Start of Highway 8 and Porcupine Ridge Rd 6 km east of Spences Bridge. Until Sat Nov 15. Single lane alternating traffic. Watch for traffic control. Expect delays. SITE 16, 17, 18, 19. Last updated Tue Aug 26 at 5:25 PM PDT. (DBC-80660)
    Highway 8 Highway 8. Watch for falling rocks between the start of Highway 8 and Dot Ranch Cut-Off Rd West for 34.8 km (Spences Bridge to 29 km west of Merritt). There is debris on the road. Last updated Thu Sep 4 at 2:27 AM PDT. (DBC-72877)
    Highway 8 Highway 8. Construction work between the start of Highway 8 and Porcupine Ridge Rd for 2.6 km (Spences Bridge). Until Fri Sep 5 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. Site 20/21. Last updated Fri Aug 29 at 1:25 PM PDT. (DBC-79173)
    Highway 8 Highway 8. Construction work between the start of Highway 8 and Porcupine Ridge Rd for 0.3 km (Spences Bridge). Until Sat Sep 13 at 5:00 PM PDT. Site 22. Single lane alternating traffic will be in effect 24 hrs. Watch for traffic control personnel and obey traffic signals. Expect delays of 5 to 30-min closures between 7AM to 5PM. Last updated Fri Aug 29 at 1:19 PM PDT. (DBC-80709)
    Highway 8 Highway 8. Construction work between the start of Highway 8 and Porcupine Ridge Rd for 3.3 km (5 to 8 km east of Spences Bridge). Until Sat Sep 6 at 4:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. Site 12 to 15. Last updated Fri Aug 29 at 1:24 PM PDT. (DBC-80708)
    Highway 8 Highway 8. Construction work between the start of Highway 8 and 14 Mile Ranch Rd for 2.7 km (9 to 12 km east of Spences Bridge). Until Mon Sep 15. Single lane alternating traffic. SITE 9/10. 30-min closures between 10am and 2pm daily. Traffic flushed between closures. Emergency vehicles accommodated. Next update time Mon Sep 15 at 9:00 AM PDT. Last updated Mon Aug 25 at 3:42 PM PDT. (DBC-74796)