• Events for Highway 8
  • Highway 8 Highway 8. Watch for falling rocks between the start of Highway 8 and Dot Ranch Cut-Off Rd West for 34.8 km (Spences Bridge to 29 km west of Merritt). There is debris on the road. Last updated Tue Jul 15 at 3:38 AM PDT. (DBC-72877)
    Highway 8 Highway 8. Construction work between the start of Highway 8 and Porcupine Ridge Rd for 12.8 km (Spences Bridge). Until Thu Jul 31. Single lane alternating traffic. SITE 9/10. Up to 30-min closures may occur between 10am-2pm daily. Next update time Thu Jul 31 at 2:00 PM PDT. Last updated Wed Jul 2 at 4:02 PM PDT. (DBC-74796)
    Highway 8 Highway 8. Construction work between the start of Highway 8 and Porcupine Ridge Rd for 2.6 km (Spences Bridge). Until Fri Jul 25. From 5:00 AM to 3:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. Expect delays. Site 20/21. Last updated Sat Jul 19 at 7:21 PM PDT. (DBC-79173)