• Events for Highway 7
  • Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 287 St for 3.9 km (Maple Ridge). From 7:00 AM to 5:00 PM PDT daily. Watch for traffic control. July 14-19, 21-26, 27-August 1. No work August 2-4. Construction speed limit 50km/h. Expect delays. Next update time Mon Aug 4 at 3:00 PM PDT. Last updated Mon Jul 14 at 10:59 AM PDT. (DBC-70968)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Construction work between Madaris Rd and Rowan Rd for 2.1 km (2 to 4 km east of Mission). Until Thu Jul 31 at 6:00 AM PDT. From 9:00 PM to 6:00 AM PDT daily. Watch for traffic control. Traffic control to not take place during a long weekend. Last updated Mon Jun 23 at 3:37 PM PDT. (DBC-78435)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Maintenance between Mill Rd and Bodnar Rd for 4.2 km (Kent). Until Wed Aug 6. From 9:00 AM to 3:00 PM PDT daily. Last updated Mon Jul 14 at 1:27 PM PDT. (DBC-79212)
    Highway 7 Westbound Highway 7 (Lougheed Highway), westbound. Utility work between Maria Lane and Junction with Highway 9 for 2.6 km (Kent). Until Fri Jul 25. From 9:00 AM to 4:00 PM PDT daily. Centre lane blocked. Watch for traffic control. Last updated Wed Jul 9 at 9:39 AM PDT. (DBC-79005)
    Highway 7 Both Directions Highway 7 (Lougheed Highway), in both directions. Paving operations between Junction with Highway 9 and Ross Rd for 27.9 km (Hope to Kent). Until Fri Aug 15 at 7:00 PM PDT. From 6:30 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Pilot car controlled. Last updated Sat Jul 19 at 4:20 PM PDT. (DBC-79476)