Highway 3A Both Directions |
Highway 3A, in both directions. Blasting between Kuskonook Rest Area and Bathie Rd for 0.3 km (4 km south of Kuskonook). Until Fri Oct 31. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. Expect delays. Up to 20 min delays throughout the day, with scheduled 1 hour closures from 0930-1030 and from and from 1430-1530. Next update time Wed Oct 1 at 10:00 AM PDT. Last updated Wed Sep 3 at 7:05 AM PDT. (DBC-80874) |
Highway 3A Both Directions |
Highway 3A, in both directions. Utility work planned between Riondel Rd and Hemlock Rd for 0.7 km (4 km south of Kootenay Bay Ferry Landing). Starting Tue Sep 9 at 8:00 AM PDT until Tue Sep 9 at 3:30 PM PDT. Single lane alternating traffic will be in effect. Last updated Wed Sep 3 at 2:08 PM PDT. (DBC-81171) |
Highway 3A Both Directions |
Highway 3A, in both directions. Maintenance planned between Hemlock Rd and Seymour Rd for 1.1 km (4 to 6 km south of Kootenay Bay Ferry Landing). Starting Wed Sep 10 at 8:00 AM PDT until Wed Sep 10 at 3:00 PM PDT. Shoulder will be closed. Single lane alternating traffic will be in effect. Straightening pole and adding anchor. Single lane alternating in use. Holds will not exceed 2 minutes in duration. Last updated Thu Sep 4 at 1:40 PM PDT. (DBC-81204) |
Highway 3A Southbound |
Highway 3A, southbound. Utility work planned between Birch Rd and Smith Rd for 0.4 km (15 km south of Kootenay Bay Ferry Landing). Starting Fri Sep 5 at 9:00 AM PDT until Fri Sep 5 at 12:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Tue Aug 26 at 3:48 PM PDT. (DBC-80901) |