Highway 3 Eastbound |
Highway 3 (Crowsnest Highway), eastbound. Utility work between Exit 173: Old Hope Princeton Way and First Avalanche Gate for 5.2 km (Hope). Until Fri Sep 5. From 8:00 AM to 4:00 PM PDT daily. Speed reduction to 70km/h. Last updated Fri Aug 8 at 11:27 AM PDT. (DBC-80226) |
Highway 3 Eastbound |
Highway 3 (Crowsnest Highway), eastbound. Construction work between First Avalanche Gate and Sunshine Valley for 3.9 km (14 to 17 km east of Hope). Until Mon Sep 15. From 7:00 AM to 7:00 PM PDT daily. Right lane closed. Last updated Thu Aug 21 at 10:03 AM PDT. (DBC-80723) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Construction work between Second Avalanche Gate and Allison Pass Summit for 7.9 km (33 to 40 km east of Hope). Until Mon Dec 1 at 7:00 PM PDT. From 6:00 AM to 7:00 PM PDT on weekdays. Expect delays. Lane Closure. Temporary detour at Snass Creek Bridge. Last updated Mon Apr 21 at 12:32 PM PDT. (DBC-74724) |
Highway 3 Westbound |
Highway 3 (Crowsnest Highway), westbound. Utility work between Allison Pass Summit and Second Avalanche Gate for 14.8 km (54 to 40 km east of Hope). Until Fri Sep 5. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic. Last updated Tue Aug 12 at 11:30 AM PDT. (DBC-80363) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Road construction work between Garret Rd and Sunday Summit for 11.3 km (43 to 32 km west of Princeton). Until Fri Oct 31. Single lane alternating traffic. Watch for traffic control. Minimum width to be maintained through project zone is 4.4 meters. Last updated Thu Aug 21 at 2:00 PM PDT. (DBC-77799) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Paving operations between Sunday Summit and Copper Mountain Rd for 34.2 km (Princeton). Until Sat Oct 4 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Watch for traffic control. Width limit 5.00 m. Height limit 5.00 m. Project parameters are from Sunday Summit to Princeton. Expect delays of up to 20 minutes. Last updated Thu Aug 21 at 11:49 AM PDT. (DBC-78739) |
Highway 3 |
Highway 3 (Crowsnest Highway). Watch for falling rocks between Wilgress Lake Rest Area and Granby Rd for 26.1 km (2 km west of Eholt Summit to Grand Forks). Last updated Tue Apr 1 at 4:26 AM PDT. (DBC-73820) |
Highway 3 |
Highway 3 (Crowsnest Highway). Watch for falling rocks between East Lake Dr and Highway 3B for 39.8 km (Christina Lake to 24 km west of Castlegar). Last updated Tue Apr 1 at 4:26 AM PDT. (DBC-73822) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Construction work planned at Porto Rico Rd (2 km east of Moyie). Starting Fri Sep 5 at 7:00 AM MDT until Sat Nov 1 at 5:00 PM MDT. From 7:00 AM to 5:00 PM MDT on weekdays and Saturday. Right lane will be closed. Shoulder will be closed. Grading and paving upgrades for new sign installation. Last updated Tue Sep 2 at 11:13 AM MDT. (DBC-81097) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Construction work planned at Peavine Bridge (9 km east of Moyie). Starting Fri Sep 5 at 7:00 AM MDT until Sat Nov 1 at 5:00 PM MDT. From 7:00 AM to 5:00 PM MDT on weekdays and Saturday. Right turn lane will be closed. Shoulder will be closed. Grading and paving upgrades for sign installation. Last updated Tue Sep 2 at 11:12 AM MDT. (DBC-81098) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Paving operations at Cedar Ave (Fernie). Until Mon Sep 15. From 9:00 AM to 3:00 PM MDT daily. Road maintenance work. Work on shoulders. Watch for crews and traffic control. Last updated Tue Jul 15 at 6:50 PM MDT. (DBC-79287) |