Highway 19A Northbound |
Highway 19A (Island Highway), northbound. Utility work planned between 107th St and 106th St for 0.2 km (Nanaimo). Starting Tue Jul 22 at 9:00 AM PDT until Wed Jul 23 at 3:00 PM PDT. Right lane will be closed. Expect minor delays. Watch for traffic control personnel. Slow down and watch for work crews. Last updated Thu Jul 17 at 2:58 PM PDT. (DBC-79401) |
Highway 19A Both Directions |
Highway 19A (Island Highway), in both directions. Utility work planned between Marview Dr and Lambert Lane for 0.6 km (17 to 16 km north of Qualicum Beach). Starting Thu Aug 7 at 9:00 AM PDT until Thu Aug 7 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Expect minor delays. Watch for traffic control personnel. BC HYDRO POLE REPLACEMENT - watch for speed reduction and work crews. Last updated Thu Jul 17 at 9:14 AM PDT. (DBC-79371) |
Highway 19A |
Highway 19A (Island Highway). Construction work between Henry Rd and Heard Rd for 2.8 km (4 to 1 km south of Campbell River). Until Fri Jan 30, 2026 at 7:00 PM PDT. Multiple locations. Work at each location done within 3 hrs. Last updated Tue Apr 8 at 2:45 PM PDT. (DBC-75100) |