• Events for Highway 19A
  • Highway 19A Northbound Highway 19A (Island Highway), northbound. Utility work planned between 107th St and 106th St for 0.2 km (Nanaimo). Starting Tue Jul 22 at 9:00 AM PDT until Wed Jul 23 at 3:00 PM PDT. Right lane will be closed. Expect minor delays. Watch for traffic control personnel. Slow down and watch for work crews. Last updated Thu Jul 17 at 2:58 PM PDT. (DBC-79401)
    Highway 19A Both Directions Highway 19A (Island Highway), in both directions. Utility work planned between Marview Dr and Lambert Lane for 0.6 km (17 to 16 km north of Qualicum Beach). Starting Thu Aug 7 at 9:00 AM PDT until Thu Aug 7 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Expect minor delays. Watch for traffic control personnel. BC HYDRO POLE REPLACEMENT - watch for speed reduction and work crews. Last updated Thu Jul 17 at 9:14 AM PDT. (DBC-79371)
    Highway 19A Highway 19A (Island Highway). Construction work between Henry Rd and Heard Rd for 2.8 km (4 to 1 km south of Campbell River). Until Fri Jan 30, 2026 at 7:00 PM PDT. Multiple locations. Work at each location done within 3 hrs. Last updated Tue Apr 8 at 2:45 PM PDT. (DBC-75100)