Highway 19A |
Highway 19A (Island Highway). Ditching between Comox Rd and Ryan Rd for 1.5 km (Courtenay). Lane Closure. Watch for traffic control. Right lane closed. Last updated Tue Jul 29 at 11:25 AM PDT. (DBC-79859) |
Highway 19A Both Directions |
Highway 19A (Island Highway), in both directions. Utility work between Iron River Rd and Colorado Dr for 6.8 km (Campbell River). Until Fri Sep 19 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. When work on shoulder is not available expect Single Lane Alternating Traffic on 19A 9am to 3pm. Last updated Wed Aug 6 at 10:17 AM PDT. (DBC-80147) |
Highway 19A |
Highway 19A (Island Highway). Construction work between Henry Rd and Heard Rd for 2.8 km (4 to 1 km south of Campbell River). Until Fri Jan 30, 2026 at 7:00 PM PDT. Multiple locations. Work at each location done within 3 hrs. Last updated Tue Apr 8 at 2:45 PM PDT. (DBC-75100) |
Highway 19A Northbound |
Highway 19A (Island Highway), northbound. Utility work planned between Iron River Rd and Lynnwood Rd for 2.8 km (4 to 7 km south of Campbell River). Starting Tue Sep 16 at 9:00 AM PDT until Tue Sep 16 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Thu Aug 28 at 10:07 AM PDT. (DBC-80982) |