Highway 19 Both Directions |
Highway 19 (Island Highway), in both directions. Road construction work between Sayward Timber and Barge Terminal Rd for 5.4 km (Campbell River). Until Fri Sep 26 at 11:45 PM PDT. Minor congestion. Please expect a speed reduction on Hwy 19 to access the detour road for Race Point Road
The speed will be reduced to 60KM/H 24 hours a day 7 days a week. Last updated Fri Aug 15 at 12:15 PM PDT. (DBC-80514) |
Highway 19 Southbound |
Highway 19 (Island Highway), southbound. Utility work planned between Orange Point Rd and McDonald Rd for 0.4 km (Campbell River). Starting Mon Sep 8 at 8:00 AM PDT until Fri Sep 12 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Thu Aug 28 at 10:59 AM PDT. (DBC-80985) |
Highway 19 Northbound |
Highway 19 (Inland Island Highway), northbound. Paving operations between Dove Creek Rd and Jubilee Pky for 30.4 km (10 km north of Cumberland to Campbell River). Until Fri Sep 19. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Northbound lane closure. Watch for traffic control. One lane each direction via southbound lanes. Last updated Tue Aug 19 at 9:50 AM PDT. (DBC-80638) |
Highway 19 Northbound |
Highway 19 (Inland Island Highway), northbound. Construction work between Hamm Rd and Duncan Bay Main for 3.8 km (12 to 8 km south of Campbell River). Until Tue Sep 30 at 5:00 PM PDT. Watch for traffic control. Shoulder closed. Last updated Wed Aug 13 at 9:26 AM PDT. (DBC-80419) |
Highway 19 Both Directions |
Highway 19 (Inland Island Highway), in both directions. Bridge maintenance planned between Cook Creek Rd and Parksville Exit (Highway 19A) for 35.4 km (28 km south of Cumberland to Parksville). Starting Mon Sep 8 until Wed Sep 17. From 8:00 PM to 4:00 PM PDT daily. Right lane will be closed. Watch for traffic control personnel. Last updated Thu Sep 4 at 2:40 PM PDT. (DBC-81206) |