• Events for Highway 15
  • Highway 15 Southbound Highway 15 (Pacific Highway), southbound. Utility work between 60 Ave and 58 Ave for 0.1 km (Surrey). Until Mon Jun 30 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT daily. Shoulder closed. Right lane closed. Southbound sidewalk closed. Pedestrians must cross at 60 Ave or 58 Ave. Last updated Mon Apr 21 at 12:17 PM PDT. (DBC-75355)
    Highway 15 Both Directions Highway 15 (Pacific Highway), in both directions. Road construction work at 60 Ave (Surrey). Until Tue May 27 at 6:00 AM PDT. From 8:00 PM to 6:00 AM PDT daily. Right turn lane closed. Left turn lane closed. Last updated Wed May 14 at 1:20 PM PDT. (DBC-76631)
    Highway 15 Northbound Highway 15 (Pacific Highway), northbound. Construction work between 68A Ave and Fraser Hwy for 1.1 km (Surrey). Until Mon Jun 30. From 9:30 PM to 5:30 AM PDT daily. Right lane closed. Shoulder closed. Watch for traffic control. Last updated Fri May 23 at 3:09 PM PDT. (DBC-77008)