Highway 13 Both Directions |
Highway 13, in both directions. Construction work between 28 Ave and 30A Ave for 0.5 km (Langley - District). Until Tue Sep 30. From 8:00 PM to 5:00 AM PDT and from 7:00 AM to 7:00 PM PDT on weekdays. Watch for traffic control. Singe lane alternating traffic during nighttime hours. Watch for crews during the day. Next update time Tue Sep 30. Last updated Mon Jul 28 at 9:19 AM PDT. (DBC-79798) |
Highway 13 Southbound |
Highway 13, southbound. Special event planned between 36 Ave and 29 Ave for 1.3 km (Langley - District). Starting Sat Sep 6 at 5:00 AM PDT until Sat Sep 6 at 6:00 PM PDT. Annual Langley Cruise In event. Fraser Hwy closed at 264th St. Watch for traffic control and detour signage. Next update time Sat Sep 6 at 6:00 PM PDT. Last updated Mon Aug 25 at 10:59 AM PDT. (DBC-80847) |
Highway 13 Both Directions |
Highway 13, in both directions. Construction work between 48 Ave and 56 Ave for 1.6 km (Langley - District). Until Tue Sep 30. From 7:00 AM to 7:00 PM PDT daily. Lane Closure. Watch for traffic control. Lane shift in place. Speed reduction to 40km/h. Last updated Mon Jul 28 at 9:11 AM PDT. (DBC-79797) |