Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Paving operations between Fraser Mountain Rd and Engen Townsite Rd for 22.7 km (3 km west of Fort Fraser to 14 km west of Vanderhoof). Until Sun Sep 28. From 7:00 AM to 7:00 PM PDT daily. Shoulder maintenance and milling planned. Watch for traffic control personnel. Expect delays. Last updated Fri Jul 18 at 4:55 PM PDT. (DBC-79459) |
Highway 16 |
Highway 16 (Yellowhead Highway). Road maintenance work between Lower Mud River Rd and Hiller Rd for 1.0 km (6 to 5 km west of Prince George). Until Thu Sep 4 at 5:00 PM PDT. Lane Closure. Last updated Thu Sep 4 at 6:42 AM PDT. (DBC-81189) |
Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Road maintenance work between Horsey Creek Rd and Small Creek Bridge for 4.7 km (15 to 20 km west of Tete Jaune). Until Thu Oct 30 at 6:00 PM PDT. Lane Closure. Single lane alternating traffic. Watch for traffic control. Maximum overall width is 5m. Loads over 5m must contact rbuckham@outlook.Com with a minimum of 48-hours to see if they can be accommodated. Last updated Wed Aug 27 at 10:07 PM PDT. (DBC-79051) |
Highway 16 Westbound |
Highway 16 (Yellowhead Highway), westbound. Utility work between Hargreaves Rd and Rearguard Falls Access for 12.1 km (4 to 16 km east of Tete Jaune). Until Thu Sep 11 at 6:00 PM PDT. Shoulder closed. Watch for traffic control. Last updated Thu Aug 28 at 9:11 AM PDT. (DBC-80977) |
Highway 5 |
Highway 5. Bridge maintenance at Gosnell Bridge (41 km north of Blue River). Until Thu Sep 4 at 5:00 PM PDT. Single lane alternating traffic. Last updated Thu Sep 4 at 9:54 AM PDT. (DBC-81194) |
Highway 5 Northbound |
Highway 5, northbound. Ditching between Albreda Pit Rd and Camp Creek Rest Area for 14.3 km (23 to 9 km south of Valemount). Southbound lane closure. Watch for traffic control. Truck speed limit 70 km/h. Ditching work, North Bound lane reduced to 70 kilometers per hour. Next update time Tue Sep 30 at 8:30 AM PDT. Last updated Mon Jul 21 at 5:47 PM PDT. (DBC-79542) |
Highway 5 Both Directions |
Highway 5, in both directions. Road construction work between Whiskeyfill Rd and Tete Jaune Access Rd for 24.1 km (5 km south of Valemount to 1 km south of Tete Jaune). Until Mon Oct 20. From 12:00 AM to 12:00 AM PDT daily. Paving operations. Single lane alternating traffic. Pilot car controlled. Last updated Tue Sep 2 at 7:50 AM PDT. (DBC-81092) |
Highway 5 Northbound |
Highway 5, northbound. Paving operations between Cedarside Rd; Cranberry Lake Rd and Tete Jaune Access Rd for 22.3 km (2 km south of Valemount to 1 km south of Tete Jaune). Until Sat Sep 27 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Pilot car controlled. Roadside barriers removed. Watch for crews on highway. Last updated Sun Jul 13 at 8:26 PM PDT. (DBC-79166) |
Highway 97 |
Highway 97 (Cariboo Connector). Rest area closed between Charles Rd and Anderson Rd (15 km south of Pineview). Next update time Tue Sep 30 at 10:00 AM PDT. Last updated Mon Jun 30 at 10:04 AM PDT. (DBC-71474) |
Highway 97 Both Directions |
Highway 97 (Cariboo Connector), in both directions. Paving operations between Sintich Rd E and Ferry Ave for 5.3 km (Prince George). Until Wed Sep 10. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Watch for traffic control. Expect delays. Additional paving on Sintich Rd, Johnson Rd, and Old Cariboo Hwy. Last updated Sat Jul 26 at 8:12 PM PDT. (DBC-79761) |
Highway 97 |
Highway 97. Utility work planned between Noranda Rd and Collins Rd for 0.6 km (Prince George). Starting Wed Sep 17 at 6:00 AM PDT until Sat Sep 20 at 6:00 PM PDT. Right lane will be closed. Last updated Tue Aug 5 at 8:12 AM PDT. (DBC-80093) |
Highway 97 Both Directions |
Highway 97, in both directions. Paving operations between Austin Rd and Nordic Dr for 0.2 km (Prince George). Until Fri Sep 5 at 6:00 PM PDT. Right turn lane closed. Left turn lane closed. Closing right and left turn lanes off Highway 97 to Handlen Road. Last updated Thu Aug 21 at 1:49 PM PDT. (DBC-80736) |
Highway 97 Southbound |
Highway 97, southbound. Utility work between Nordic Dr and Austin Rd for 0.7 km (Prince George). Until Fri Sep 5 at 6:00 AM PDT. Right turn lane closed. Last updated Tue Aug 19 at 11:00 AM PDT. (DBC-80644) |
Highway 97 Both Directions |
Highway 97, in both directions. Bridge construction between Wright Creek Rd and Kinney Rd for 0.5 km (8 to 7 km north of Prince George). Until Sat Nov 15. Single lane alternating traffic. Last updated Tue Apr 15 at 3:44 PM PDT. (DBC-75426) |